HomeMy WebLinkAboutDRAFT Fire Impact Fee CIP Project Name: Traffic Signal Preemption Program Estimated Cost: $172,801 Unscheduled Project Number: Fire Impact Fees – FIF03 Date Scheduled: Purpose: New Replacement Facility Equipment Project This project is the installation of ten (10) fire apparatus emitters, intersection wiring, and signal receivers at approximately 17 city Description: intersections to improve response times to emergencies throughout the community. This dual priority system uses precisely timed impulses of high intensity light in several wavelengths to activate a traffic control system which facilitates emergency vehicle response. Its dual priority capability allows the system to give top priority to emergency vehicles and secondary priority to other users, such as snow plows. For the last several years, most of the new traffic signals installed in Bozeman have included the signal-based modules and will not require upgrade as a part of this project. The installation of this system will allow traffic the green signal in the direction of the emergency responder, thus, facilitating travel to the emergency. Nationwide, this system's installation has reduced average emergency response times by as much as 17 to 20%, according to the vendor. Because Station location is based on response time, improving emergency response times generally decreases the need for additional physical fire stations to be built. Alternatives Continue to operate without a signal preemption system. Considered: Advantages of This system's installation improves emergency response time and, more importantly, response safety in those communities where it is used. Its dual Approving this priority capability allows other users under a priority system to access Project: signal preemption. It severely reduces the need for our emergency responders to occasionally travel into opposing lanes of traffic, a risky route to negotiate. And, it clearly allows traffic movement in the direction by the emergency responder. Estimated New Annual Operating & Maintenance Costs: Impact Fees can not be used for annual operating and maintenance costs. The General Fund will need to Future provide for repair and replacement of system components as they outlive Recurring their useful life. Costs: Funding 100% Fire Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Fire Station #4 – South West Bozeman Estimated Cost: $2,771,366 Unscheduled Project Number: Fire Impact Fees – FIF06 Date Scheduled: Purpose: New Replacement Facility Equipment Project This project is identified as a priority in the adopted Fire Facility Plan because most of the City's north and west areas are located such that our Description: response time exceeds four to six minutes for fire and medical emergencies. Land acquisition costs are not included. The City currently owns the site th on the southwest corner of 19 Avenue and Graf Street, which is ideally situated for this station. This station will be needed as our community grows in its South West Quadrant. We will need to watch annexations and subdivisions within the area and schedule this project accordingly. Alternatives Many are available: Scale down the project size and/or materials used in construction to accommodate a residential type facility similar to Station Considered: #2; require automatic sprinkler systems as built-in protection for all new construction located outside of existing stations' response time service districts; continue operating under current resources; relocated existing stations; accept longer-than-historical response times and high life and fire losses; acquire fire district's fixed facilities as annexation by the City continues. Advantages of The completion of this project would enhance our ability to respond to growing parts of the community within a time frame that has been Approving this historically acceptable to the citizens of Bozeman. Project: Station #1 and #2 are located in areas which ineffectively serve the existing community as well as the portions which are on Rouse street, a heavily traveled way with a stop light, which occasionally limits our drivers to unsafe access to Rouse or Mendenhall. Estimated New Annual Operating & Maintenance Costs: Impact Fees can not be spent on operations and maintenance costs. The City’s General Fund will bear the Future annual operating and maintenance expenses associated with this facility, Recurring estimated at $1,200,000, including all crew personnel. Costs: Funding 100% Fire Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Fire Engine for Station #4 Estimated Cost: $598,363 Unscheduled Project Number: Fire Impact Fees – FIF07 Date Scheduled: Purpose: New Replacement Facility Equipment Project This project is the purchase of an engine and accompanying equipment for use out of new Fire Station 4. Description: It will be necessary to have this engine at the Station when it opens. There is an estimated 12 month lead time in delivery of this type of equipment. This engine will be needed for Station #4, which will be required as our community grows in its South West Quadrant. We will need to watch annexations and subdivisions within the area and schedule this project accordingly. Alternatives Use of 1989 Pierce Reserve Pumper Darley; buy a used engine; lease/purchase an engine. Considered: Advantages of Purchase of this unit will adequately equip Station #4 for fire and other emergency responses. Approving this Project: Estimated New Annual Operating & Maintenance Costs: Impact Fees can not be used for annual operating and maintenance costs. The City’s General Fund will Future pay for the increased fuel, maintenance and insurance costs associated Recurring with this engine, estimated at less than $30,000 per year. Costs: Funding 100% Fire Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Construction of Fire Station #3 Name: Debt Service Payment Estimated $108,000 Estimated Each Year, Principal and Interest Cost: Plus, any additional Impact Fee Revenue to retire the debt as soon as possible. Project FIF08 – Fire Impact Fees Date Each Year until Paid – FY11- Number:Scheduled: 15 Purpose: New Replacement Facility Equipment Project The construction costs for Fire Station #3 are 100% impact fee eligible. At the time of construction, there was not enough cash in the Fire Impact Fee Description: fund to pay all the eligible costs. As a result, the City’s general borrowing authority was used to borrow $890,000 to finish the project. Because current state statutes do not provide specific authority for cities to borrow against streams of impact fee revenues, we needed to borrow the funds under the city’s general borrowing authority (general obligation) MCA 7-7-4104. This loan is ultimately secured by the City’s General Fund; we intend to use Fire Impact Fees collected during each year to make the debt service payments, but if those should fall short the General Fund would be required to make the payment. Under current Intercap rates, a loan of $890,000 would require annual debt payments of $108,000 (10 year term, 4.25%). There is no penalty for early payment, and it would be our intention to pay off this loan as quickly as possible, dedicating all annual revenues to debt payments. Alternatives The City could opt to not pay this loan off early; instead making the annual payments each year. However, because the debt is ultimately backed by the Considered: City’s General Fund, borrowing authority under MCA 7-7-4104 is limited to a fixed amount, and interest costs accumulate, it is best to pay this debt as soon as possible. Advantages of The General Fund will not be required to pay for capacity expanding costs of the Fire Station. Approving this Project: Estimated Annual Operating and Maintenance Costs: Currently supported in General Fund budget. New Future Recurring Costs: Funding Loan made on borrowing authority of the City’s General Fund (MCA.7-7- 4104) Sources: All loan repayments will be made by Fire Impact Fee Fund. úÔÉÄÎ×ûÎÃØÐÜÏúÜÍÔÉÜÑôÐÍËÎÇØÐØÏÉÊíÑÜÏ÷ä   úÔÉÄÎ×ûÎÃØÐÜÏúÜÍÔÉÜÑôÐÍËÎÇØÐØÏÉÊíÑÜÏ÷ä