HomeMy WebLinkAboutLandfill Addition, Change Order No. 2i~f ~!_~ dowting (sandhotm I architects CHANGE ORDER Project: Bozeman Landfill Addition Date: August 18, 2009 Great Northern Town Center Helena, MT 59601 Architect's Project No: 08-263 To Contractor: BN Builders, Inc Contract Date: June 1, 2009 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction C.O. #2 Owner ^ Architect ^ Contractor ^ Field ^ Other ^ The Contract is changed as follows: This is a modification to the contract to increase the scope of work to include fire protection of spray insulation in the existing vehicle storage space. This change is funded by an increase to the project budget from the Solid Waste Division enterprise fund Reason for change: Direction from building department to fire protect exposed spray foam insulation in existing garage prior to issuing Certificate of Occupancy (CP# 5006) Direction from building department to add fire rated construction between new garage and existing garage (CP# 5007) Additional work to remove existing plywood siding in preparation for spray foam insulation protection (CP# 5010) Attachment(s): CP# 5006 CP# 5007 CP# 5010 Contract Sum Adiustment: The original Contract Sum was $ 271,648.00 The net change by previously authorized Change Orders $ <-186.05> The Contract Sum prior to this Change Order was $ 271,461.95 The Contract Sum will be increased by this Change Order by the amount of $ 29,799.02 The new Contract Sum including this Change Order will be $ 301,260.97 Contract Time Adiustment: The Contract Time will be increased by zero 0 days. The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009 Not valid until signed by Architect, Contractor, and Owner. Signatures: Architect: Dowling Sandholm Architects 15 West 14`h Street -Suite 103 Helena, Mt 59601 Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Owner: City of Bozeman P.O. Box 1230 Bozeman, MT 59771 By: ~-- Date: ~ Z ( 0~ Mik iseman By: Date: 8 • Z S ~ ~ Jay By. ~ Date~`Z--4c1 hris Kukulski B'NIB BNBuilders, Inc. Thursday, August 20, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal = CP# 5010 City of Bozeman Landfill Add. - 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5010 Description: Removal/Reinstall Existing Shop Plywood/Shelving Proposed Amt: $ 5,040.00 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment & material to remove and reinstall existing plywood and fixed shelving at the Bozeman Landfill existing shop. This price does not include handling of landfill personnel tools, equipment, etc. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after . BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the f nal price for this work. [~ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub ed by; .p Scott Jay BNBuilders, Inc Accepted by: Date: Mike Wiseman Dowl/ng Sandho/m Architects CHANGE PROPOSAL DETAIL BACKUP Project #: 509004 CP # 5010 B ~ ~ City of Bozeman Landfill Add. 2143 Story Mill Road Bozeman, MT 59715 BNBuilders, Tnc, phone: 206-382-3443 Fax: 206-382-3440 Contractor Descri tion Amount 80 Man Hours @ 45/hr $3,600.00 Equipment and Tools $600.00 All Materials 300.00 BNBuilders Inc. Overhead & Profit $540.00 BNBuilders, Inc. OH & Profit on Subcontractors .$0.00 Total: $5,040.00 ~ \ 1 I it •~ ~i Bowling I sandholm I architects CHANGE ORDER C.O. #2 Project: Bozeman Landfill Addition Date: August 18, 2009 Owner ^ Great Northern Town Center Architect ^ Helena, MT 59601 Architect's Project iVo: 08-263 Contractor ^ Field ^ To Contractor: BN Builders, Inc Contract Date: June 1, 2009 Other ^ 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction The Contract is changed as follows: Increase Contract Sum. Reason for change: Direction from building department to fire protect exposed spray foam insulation in existing garage prior to issuing Certificate of Occupancy (CP# 5006) Direction from building department to add fire rated construction between new garage and existing garage (CP# 5007) Attachment(s): CP# 5006 CP# 5007 Contract Sum Adiustment~ The original Contract Sum was $ 271,648.00 The net change by previously authorized Change Orders $ <-186.05> The Contract Sum prior to this Change Order was $ 271,461.95 The Contract Sum will be increased by this Change Order by the amount of $ 24,759.02 The new Contract Sum including this Change Order will be $ 296 220.97 Contract Time Adiustment~ The Contract Time will be increased by zero 0 days. The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009 Not valid until signed by Architect, Contractor, and Owner. Signatures: Architect: Dowling sandholm Architects 15 West 14th Street -Suite 103 Helena, Mt 59601 Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Owner: City of Bozeman P.O. Box 1230 Bozeman, MT 59771 BY~ Date: Mike Wiseman By: Date: Scott Jay BY~ Date: James Goehrung T' a 0 BIN~B BNBuilders, Inc. Tuesday, August 4, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal - CP# 5006 City of Bozeman Landfill Add. - 509004 Dear Mike Wiseman, This {etter is to request authorization to proceed with the following extra work: CP Number: 5006 Description: Fire Spray Installation at Remaining Shop (Excludes Shop West Wall) Proposed Amt: $ 21,067.50 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment & materials for fire spray installation on all other areas of existing shop using factory recommended application with NYFS 1500 foam barrier. Price excludes furnish & install of any wood protection boards. Price also excludes removal and replacement of existing shop shelving and equipment. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after . ^ BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. ^ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Submitted by: Accepted by: Date: ~ Y ScoLtJay Mike Wiseman BNBuilders, Inc Dow/ing Sandholm Architects .~ I CHANGE PROPOSAL DE'PAIi BACKUP Project #: 509004 CP # 5006 City of Bozeman Landfill Add. 2143 Story Mill Road Bozeman, MT 59715 BNBuilders, Inc. phone: 206-382-3443 Fax: 206-382-3440 Contractor Description Amount Fire S ra Furnish Install 19 875.00 BNBuilders Inc. Overhead & Profit $0.00 BNBuilders, Inc. OH & Profit on Subcontractors $1,192.50 Total: $21,067.50 is SL~Z=_MAN, M7 ~a971 9 F'!-IONEII=AX: `586-$484 CELL:.580-5.271 1~/Y/W:P~AKP.;411alTf N~MT.COM J ANt ES C~P..£P:'fSF',41 NT 1 N G M'T. GD M r. u, ~~ ~w., C,71!%x ~w",tuwr ~ ~~ ~~~ i . -~Gtiaiing c~fa.~i.sulnlion~oxi: wesl ~vall:attutched,to addition using:fiYCtarvrecammended .. .. ' lapplicniion w.ifhlVl'1:fi 1!Si1C)fomm~hmrriur _ _~^ ~Goaiine-oi'insulaiic:n nn:~1 ataer.arCfLS'hl'S}IUn 1101 C(1V.CrCCj h}' t13t%:StTC:EtS.:•1151CCI.:HQCItiYC 7ISIA~ . ~ COQ :~~.~;~i7a OCt. ~U;O(1's ifaiton=ree~cncnenJcit.mppli~~Htiai :~rilhM`FSlS.C)O.:fz~tun b¢rriflr i IDedu'ci:ion+for:notl~aiing=ta-.fiang;sheerror+}ion:svesri~^ali:xttaiehedtc~additian --~...kre---~k€r@ } "' .. i a Pegr ~ nr~ -~ rx,'lur~e5 f~iwe~:u~5~t~s~, ~1/~~:.°L~'s;7`fy~ .~it~r~,.+5 :7~ ,•r~' M_ ~' B'NIB BNBuilders, Inc. Wednesday, August 12, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal - CP# 5007 City of Bozeman Landfill Add. - 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5007 Description: Fire Rated Wall Between New & Existing Shop (Framing & Drywal[) Proposed Amt: $ 3,691.52 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment & materials to install framing & drywall at the west wall of existing landfill shop. Price excludes removal and reinstallation of existing shop shelving and equipment currently placed along the west wall. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after . ^ BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. ^ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub ed by: Accepted by: Date: B-IZ-o ~~ ~J /3l~ Scott.7ay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architects 4 CHANGE PROPOSAL DETAIL BACKUP Project #: 509004 CP # 5007 ® ~ ~ City of Bozeman Landfill Add. ® 2143 Story Mill Road Bozeman, MT 59715 BNBuilders, Tnc. phone: 206-382-3443 Fax: 206-382-3440 Contractor Description Amount Superintendent $2,160.00 Alf Materials $726.00 E ui ment and Tools 410.00 BNBuilders Inc. Overhead & Profit $395.52 BNBuilders, Inc. OH & Profit on Subcontractors $0.00 Total: $3,699..52 1 ~L Field Report Project: Date: ~/1A/~a Weather: Present at Site: The following was noted: Signed: cc: Bowling (sandho(m I architects Bozeman Landfill Addition, #08-263 55 West 14`h Street Suite 103 Helena, MT 59601 406-457-5470 ph 406-495-0063 fax 2054 Stadium Drive Suite C Bozeman, MT 59715 406-556-0113 ph 406-556-0114 fax www.dowlingsandholm.com 1( L L Field Report Project: Date: Weather: Present at Site: The following was noted: Signed: cc: Bowling ~ sandholm ~ architects Bozeman Landfill Addition, #08-263 55 West 14th Street Suite 103 Helena, MT 59601 406-457-5470 ph 406-495-0063 fax 2054 Stadium Drive Suite C Bozeman, MT 59715 406-556-0113 ph 406-556-0114 fax www.dowlingsandholm.com r ,~ L i~_._ L Field Report Project: Date: Weather: Present at Site: The following was noted: Signed: cc: dowting ~ sandhotm I architects Bozeman Landfill Addition, #08-263 55 West 14~h Street Suite 103 Helena, MT 59601 406-457-5470 ph 406-495-0063 fax 2054 Stadium Drive Suite C Bozeman, MT 59715 406-556-0113 ph 406-556-0114 fax www.dowlingsandholm.com COMMISSION RESOLUTION N0.4197 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, INC., BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 27th day of May 2009, authorize award of the bid for the Construction of the Bozeman Landfill Addition to BN Builders, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Inc., Bozeman, Montana, as contained in Change Order #1 and Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 31st day of August, 2009. KAAREN JAC SON, Ma or Page 1 of 2 STAC EN, M City Cler Page 2 of 2 APPROVED AS TO FORM: