HomeMy WebLinkAboutLandfill Addition, Change Order No. 2i~f
~!_~
dowting (sandhotm I architects
CHANGE ORDER
Project: Bozeman Landfill Addition Date: August 18, 2009
Great Northern Town Center
Helena, MT 59601 Architect's Project No: 08-263
To Contractor: BN Builders, Inc Contract Date: June 1, 2009
2066 Stadium Dr., Ste 102
Bozeman, MT 59715 Contract For: General Construction
C.O. #2
Owner ^
Architect ^
Contractor ^
Field ^
Other ^
The Contract is changed as follows:
This is a modification to the contract to increase the scope of work to include fire protection of spray insulation
in the existing vehicle storage space. This change is funded by an increase to the project budget from the Solid
Waste Division enterprise fund
Reason for change:
Direction from building department to fire protect exposed spray foam insulation in existing garage prior to
issuing Certificate of Occupancy (CP# 5006)
Direction from building department to add fire rated construction between new garage and existing garage
(CP# 5007)
Additional work to remove existing plywood siding in preparation for spray foam insulation protection (CP#
5010)
Attachment(s):
CP# 5006
CP# 5007
CP# 5010
Contract Sum Adiustment:
The original Contract Sum was $ 271,648.00
The net change by previously authorized Change Orders $ <-186.05>
The Contract Sum prior to this Change Order was $ 271,461.95
The Contract Sum will be increased by this Change Order by the amount of $ 29,799.02
The new Contract Sum including this Change Order will be $ 301,260.97
Contract Time Adiustment:
The Contract Time will be increased by zero 0 days.
The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009
Not valid until signed by Architect, Contractor, and Owner.
Signatures:
Architect: Dowling Sandholm Architects
15 West 14`h Street -Suite 103
Helena, Mt 59601
Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
Owner: City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
By: ~-- Date: ~ Z ( 0~
Mik iseman
By: Date: 8 • Z S ~ ~
Jay
By. ~ Date~`Z--4c1
hris Kukulski
B'NIB
BNBuilders, Inc.
Thursday, August 20, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal = CP# 5010
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 5010
Description: Removal/Reinstall Existing Shop Plywood/Shelving
Proposed Amt: $ 5,040.00
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, equipment & material to remove and reinstall existing plywood and fixed shelving at the
Bozeman Landfill existing shop. This price does not include handling of landfill personnel tools, equipment, etc.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the f nal price for this work.
[~ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Sub ed by;
.p
Scott Jay
BNBuilders, Inc
Accepted by: Date:
Mike Wiseman
Dowl/ng Sandho/m Architects
CHANGE PROPOSAL DETAIL BACKUP
Project #: 509004 CP # 5010
B ~ ~ City of Bozeman Landfill Add.
2143 Story Mill Road
Bozeman, MT 59715
BNBuilders, Tnc, phone: 206-382-3443
Fax: 206-382-3440
Contractor Descri tion Amount
80 Man Hours @ 45/hr $3,600.00
Equipment and Tools $600.00
All Materials 300.00
BNBuilders Inc. Overhead & Profit $540.00
BNBuilders, Inc. OH & Profit on Subcontractors .$0.00
Total: $5,040.00
~ \ 1
I it •~
~i
Bowling I sandholm I architects
CHANGE ORDER C.O. #2
Project: Bozeman Landfill Addition Date: August 18, 2009 Owner ^
Great Northern Town Center Architect ^
Helena, MT 59601 Architect's Project iVo: 08-263 Contractor ^
Field ^
To Contractor: BN Builders, Inc Contract Date: June 1, 2009 Other ^
2066 Stadium Dr., Ste 102
Bozeman, MT 59715 Contract For: General Construction
The Contract is changed as follows:
Increase Contract Sum.
Reason for change:
Direction from building department to fire protect exposed spray foam insulation in existing garage prior to
issuing Certificate of Occupancy (CP# 5006)
Direction from building department to add fire rated construction between new garage and existing garage
(CP# 5007)
Attachment(s):
CP# 5006
CP# 5007
Contract Sum Adiustment~
The original Contract Sum was $ 271,648.00
The net change by previously authorized Change Orders $ <-186.05>
The Contract Sum prior to this Change Order was $ 271,461.95
The Contract Sum will be increased by this Change Order by the amount of $ 24,759.02
The new Contract Sum including this Change Order will be $ 296 220.97
Contract Time Adiustment~
The Contract Time will be increased by zero 0 days.
The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009
Not valid until signed by Architect, Contractor, and Owner.
Signatures:
Architect: Dowling sandholm Architects
15 West 14th Street -Suite 103
Helena, Mt 59601
Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
Owner: City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
BY~ Date:
Mike Wiseman
By: Date:
Scott Jay
BY~ Date:
James Goehrung
T'
a
0
BIN~B
BNBuilders, Inc.
Tuesday, August 4, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5006
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This {etter is to request authorization to proceed with the following extra work:
CP Number: 5006
Description: Fire Spray Installation at Remaining Shop (Excludes Shop West
Wall)
Proposed Amt: $ 21,067.50
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, equipment & materials for fire spray installation on all other areas of existing shop using factory
recommended application with NYFS 1500 foam barrier. Price excludes furnish & install of any wood protection
boards. Price also excludes removal and replacement of existing shop shelving and equipment.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
^ BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the final price for this work.
^ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submitted by: Accepted by: Date:
~ Y
ScoLtJay Mike Wiseman
BNBuilders, Inc Dow/ing Sandholm Architects
.~
I
CHANGE PROPOSAL DE'PAIi BACKUP
Project #: 509004 CP # 5006
City of Bozeman Landfill Add.
2143 Story Mill Road
Bozeman, MT 59715
BNBuilders, Inc. phone: 206-382-3443
Fax: 206-382-3440
Contractor Description Amount
Fire S ra Furnish Install 19 875.00
BNBuilders Inc. Overhead & Profit $0.00
BNBuilders, Inc. OH & Profit on Subcontractors $1,192.50
Total: $21,067.50
is
SL~Z=_MAN, M7 ~a971 9
F'!-IONEII=AX: `586-$484
CELL:.580-5.271
1~/Y/W:P~AKP.;411alTf N~MT.COM
J ANt ES C~P..£P:'fSF',41 NT 1 N G M'T. GD M
r. u, ~~
~w., C,71!%x ~w",tuwr
~ ~~ ~~~
i .
-~Gtiaiing c~fa.~i.sulnlion~oxi: wesl ~vall:attutched,to addition using:fiYCtarvrecammended .. .. '
lapplicniion w.ifhlVl'1:fi 1!Si1C)fomm~hmrriur
_ _~^
~Goaiine-oi'insulaiic:n nn:~1 ataer.arCfLS'hl'S}IUn 1101 C(1V.CrCCj h}' t13t%:StTC:EtS.:•1151CCI.:HQCItiYC 7ISIA~ . ~ COQ :~~.~;~i7a OCt. ~U;O(1's
ifaiton=ree~cncnenJcit.mppli~~Htiai :~rilhM`FSlS.C)O.:fz~tun b¢rriflr
i
IDedu'ci:ion+for:notl~aiing=ta-.fiang;sheerror+}ion:svesri~^ali:xttaiehedtc~additian --~...kre---~k€r@
} "' .. i
a
Pegr ~ nr~
-~ rx,'lur~e5 f~iwe~:u~5~t~s~, ~1/~~:.°L~'s;7`fy~ .~it~r~,.+5 :7~ ,•r~'
M_
~'
B'NIB
BNBuilders, Inc.
Wednesday, August 12, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5007
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 5007
Description: Fire Rated Wall Between New & Existing Shop (Framing & Drywal[)
Proposed Amt: $ 3,691.52
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, equipment & materials to install framing & drywall at the west wall of existing landfill shop.
Price excludes removal and reinstallation of existing shop shelving and equipment currently placed along the
west wall.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
^ BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the final price for this work.
^ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Sub ed by: Accepted by: Date:
B-IZ-o ~~ ~J /3l~
Scott.7ay Mike Wiseman
BNBuilders, Inc Dowling Sandholm Architects
4
CHANGE PROPOSAL DETAIL BACKUP
Project #: 509004 CP # 5007
® ~ ~ City of Bozeman Landfill Add.
® 2143 Story Mill Road
Bozeman, MT 59715
BNBuilders, Tnc. phone: 206-382-3443
Fax: 206-382-3440
Contractor Description Amount
Superintendent $2,160.00
Alf Materials $726.00
E ui ment and Tools 410.00
BNBuilders Inc. Overhead & Profit $395.52
BNBuilders, Inc. OH & Profit on Subcontractors $0.00
Total: $3,699..52
1
~L
Field Report
Project:
Date: ~/1A/~a
Weather:
Present at Site:
The following was noted:
Signed:
cc:
Bowling (sandho(m I architects
Bozeman Landfill Addition, #08-263
55 West 14`h Street Suite 103 Helena, MT 59601
406-457-5470 ph 406-495-0063 fax
2054 Stadium Drive Suite C Bozeman, MT 59715
406-556-0113 ph 406-556-0114 fax
www.dowlingsandholm.com
1(
L L
Field Report
Project:
Date:
Weather:
Present at Site:
The following was noted:
Signed:
cc:
Bowling ~ sandholm ~ architects
Bozeman Landfill Addition, #08-263
55 West 14th Street Suite 103 Helena, MT 59601
406-457-5470 ph 406-495-0063 fax
2054 Stadium Drive Suite C Bozeman, MT 59715
406-556-0113 ph 406-556-0114 fax
www.dowlingsandholm.com
r
,~
L i~_._ L
Field Report
Project:
Date:
Weather:
Present at Site:
The following was noted:
Signed:
cc:
dowting ~ sandhotm I architects
Bozeman Landfill Addition, #08-263
55 West 14~h Street Suite 103 Helena, MT 59601
406-457-5470 ph 406-495-0063 fax
2054 Stadium Drive Suite C Bozeman, MT 59715
406-556-0113 ph 406-556-0114 fax
www.dowlingsandholm.com
COMMISSION RESOLUTION N0.4197
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH BN BUILDERS, INC., BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 27th day of May 2009, authorize award of the bid for
the Construction of the Bozeman Landfill Addition to BN Builders, Inc., Bozeman, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a
municipal corporation, and BN Builders, Inc., Bozeman, Montana, as contained in Change Order #1 and
Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby
authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk
is authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular
session thereof held on the 31st day of August, 2009.
KAAREN JAC SON, Ma or
Page 1 of 2
STAC EN, M
City Cler
Page 2 of 2
APPROVED AS TO FORM: