dowting sandholm' architects
CHANGE ORDER
Project: Bozeman Landfill Addition Date: August 18, 2009
Great Northern Town Center
Helena, MT 59601 Architect's Project No: 08-263
To Contractor: BN Builders, Inc Contract Date: June 1, 2009
2066 Stadium Dr., Ste 102
Bozeman, MT 59715 Contract For: General Construction
The Contract is changed as follows:
Decrease Contract Sum.
C.O. #1
Owner ^
Architect ^
Contractor ^
Field ^
Other ^
Reason for change:
Owner requested change of outlets to accommodate charging equipment (CP# 5001)
Contractor recommendation and Owner request for alternate sidewalk configuration (CP# 5003)
Contractor recommendation for additional water protection at roof (CP# 5004)
Contractor recommendation for cabinet substitution to save cost (CP# 5009)
Attachment(s):
CP# 5001
C P# 5003
CP# 5004
CP# 5009
Contract Sum Adiustment
The original Contract Sum was $ 271,648.00
The net change by previously authorized Change Orders $ <0>
The Contract Sum prior to this Change Order was $ 271,648.00
The Contract Sum will be decreased by this Change Order by the amount of $ 186.05
The new Contract Sum including this Change Order will be $ 271,461.95
Contract Time Adiustment:
The Contract Time will be increased by zero 0 days.
The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009
Not valid until signed by Architect, Contractor, and Owner.
Signatures:
Architect: Dowling Sandholm Architects
15 West 14th Street -Suite 103
Helena, Mt 59601
Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
Owner: City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
Mike Wiseman
By: Date: ~'2S•d`~
Jay
By: ~ Date ~~
Chris Kukulski
t
BINIB
BNBuifders, Inc.
Tuesday, August 4, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5001
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 5001
Description: Change to Quad Receptacles
Proposed Amt: $ 45.58
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Change duplex receptacles to quad receptacles, one location in each office.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization Is received after .
BNBuilders has proceeded with this work per previous RdM approval (attached). This change proposal
represents the final price for this work.
BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submitted by: Accepted by: Date:
ScoltJay Mike Wiseman
BNBui/ders, Inc Dowling Sandho/m Architects
CHANGE PROPOSAL DETAIL BACKd1P
Project #: 509004 CP # 5001
B ~ ~ City of Bozeman Landfill Add.
2143 Story MIII Road
Bozeman, MT 59715 -
BNButlders, Inc. phone: 206-382-3443
Fax: 206-382-3440
Contractor Description Amount
Electrical 43.00
BNBuilders Inc. Overhead & Profit $0.00
BNBuilders, Inc. OH & Profit on Subcontractors $2.58
3 oJ.~.%, ~~(
Total: $45.58
MATZINGER ELECTRIC, INC.
907 Bridger Drive
Bozeman, MT 59715
Phone: (406) 587-7290
.Fax: {406) 587-7298
Proposal
6/10/2009
TO:
BNBuilders
Gaines Hali Bldg. on 11th and Grant St
Room #108
Bozeman, MT 59715
JOB: City Landfill Shops
Project: Change duplex receptacles to Quad receptacles
Change Order Number: 1000014353
WORK DESCRIPTION: Add one receptacle to one location in each office
The total amount of this Proposal is: $43.00.
iricerely,
Jeff tzi ,
Ma finger lectric .
L14N9 ~l GL
~•l.
t
6!10/200911:37:18 AM
Page 1
CITY LANDFILL SHOPS :Change duplex receptacles to quad receptacles
Totals (Detailed) -Bid Summary: Default
01 ~~Raceway,~Ftgs &iBoxes~ ~ ~ :$1,35 . -~~: ~ :O.DO %.- - ~ ~;-$1 3;5
05 Wiring Devices & Covers
~,, 6.66
_ 0.00 %
_ 6.66
,,
Total .. ,.
$5.31
$5.31
Sales Tax (0.00%) , _.~~ ,:
$0.00
Total Material _ _, , , $5.31
,.
Labor Hours _ _,.,
Divlslen ', Total ~ Factor ~ `~~ ;Extended ~.
01 Raceway;,Ftgs;'&Bm:es -
,~.. ~ 0.00'
, ~ 0:00 % , ~~" '-'0'.GO ~ ~°
05 Wiring Devices ~~ Covers
_ 0.75
- 0.00 % 0.75
Total ~ 0.75 0.75
~; '~ ~, ,`~
1 I `~~~;~~~,.~.,
1 1
r
,
1.',
., ...i...:.S
13:4. .
.. 4 .
~,;. Labor-RB~eS~;xrkk "~~~"rhp ` k ..
CateQOn~ ~s~~ o=Tetal HoursB
aseRate Burden 5 Burden "r, E~iended
-. .., ~~}
~~ih 4YL i5 ~'';3V1\Cr''Y ~"~J it ~ ~ ._,
Journeyman 100000 0.750
$49.50 0.00 G.~~~00 ~3-.':2
rtn
Total 100.oG0 0.750 ~ x $49.55 ( average o. laoor rate ~ri'buraen) = 837.12
t~ ~,,,
~4 '~~~vl ~ZL t1
~
I
NoritiQuoted~Mater(al (5-000 %)'
~ ' ''
~
$G 2
f. r. E~ ~ ~... ~•
, . _. ~ ,,
Quoted Material (5.000 %) $0.00
Dir
"c1~Lab
r~(0 000%0) " ~ ~
~
~ ~~$0 0,4
e
~o .-.
.~. ~.,.
°,. `.~ ',
Non Productive Labor (0.000 `oi $0.00
.lob<Expenses~,(5 000'%i , ~ k '~}~ ~~+'~`~ x ~~$0.00
Tools and Misc. Materials ~ 5.000 %) ~ $0.00
Subcontracts':(5 D0~ °/a) " ~ r,~~~ a ~~1~~~`~ `;'
`~`
I ` ~`i cyy7'~ ,, i$`0
00
.
: .
Overhead (4.h6~3°/a), ' '- ~ _- 0'27
c
>~ 6P10l2009 11:37:16 AM
Page 2
CITY LANDFILL SHOPS :Change duplex receptacles to quad receptacles
Totals (Detailed) -Bid Summary: Default
Profit
:.:•.
Non Quoted Material (5.000 %) $0.28
Quoted Material (5.OOD %), ~ ,, $0!D~q
~.
Direct Labor (0.000 %) $0.00
Non~Producfive,Laboa(0:000%)
~ ~ ` <`~$0l)0.
~
Job F~cpenses (5.000 %)
$0 00
Tools arid'Nllsc: Matefials (5.000 %) ~
$O~p
s (5.000 %)
Subcontract _
$0.0
_ ~
~`
Profit (0 65%) ~
0 28
Job Total _ $42.98
A~ua~+B~d Price ~ ~ '~$43?QD
Materialttq~Diject•Labor ratio: 0:13 "
~ ~
are foot
' p
PnmeCost ersqu
$0.00
JopTotal peer square foot ~ _ _ _ ~ , : ~~~" ~, $0'00
Actual Bid Price per square ft
$0 00
~.:~
,P G` foot.
l,abpr~cost er s uare
~
~~`
- t r a...: ...}: u~, ...... ` $0 00
,
ti .. ~,~
Labor hours per square foot
$0.00
BINIB
BNBuilders, Inc.
Tuesday, August 4, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5003
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 5003
Description: Additional Curb, Gutter & Sidewalk
Proposed Amt: $ 322.77
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, equipment & materials to install an additional 12LF of Curb/Gutter and 25SF of 4" Concrete
Sidewalk. It was determined in the field that this proposed change will provide a more even and efficient path
of travel from the garage area to the parking area along with presenting a slightly more aesthetic sidewalk.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the final price for this work.
BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submitted by: Accepted by: Date:
~-~ b 6
Scott Jay Mike W/seman
BNBuilders, Inc Dow/ing Sandho/m Architects
i -~
CHANGE PROPOSAL DETAIL BACKUP
Project #: 509004 CP # 5003
City of Bozeman landfill Add.
2143 Story Mili Road
Bozeman, MT 59715
BNBuilders, Inc. phone: 206-382-3443
Fax: 2D6-382-3440
Contractor Description Amount
Earthwork 304.50
BNBuilders Inc: Overhead & Profit $0.00
BNBuilders, Inc. OH & Profit on Subcontractors $18.27
Total: $322.77
~~~~~ tl
7uly 29, 2009 .
SNBuilders, Inc.
293 .Rodeo Drlve Snite #2
Florence, Montana 59833
Re: Bozeman Landfill Adc
Dear Scott,
aFFl~ Fan °~
406.5@2.9849 408.582.9843 simecanst@montana.com `~„
nnaur~c nooasss sra~r ao~ess
7720A 5hedhorn 140 Bozeman, 'MT 5971 B 190 Ramshorn Drive Bozeman, MT 5971 B
titionai Worlc
As per our conversation 1 am providing pricing for the following .additional work:
12 LF Curb and Gutter $ 192,00 _, ~3p~, $D
2~ SF 4" Concrete Sidewallc $ 112.50 _..._--~--'
Total -8~;63~-59~
After reviewing:the project:plans and ourproposat. In our proposal it clearly states the
item that were included in the proposal for the additive.siternate. Additionally.if you look
at 5heet.5=1, figurel, it clearly showsahat the concrete apron and stoop-are outside the
extent of additive alternate.#1.
1 also want to .bring to your attention that additional work will be required .on the north
end of the new addition :that'is not shown on sheets A 2-1 and A 2-2. This work will
include additional asphalt.removal, gravel added for grade changes and additional
pavement to be placed. We will price this additional work when it.is the extent of work
of the additional work is determined.
In our proposal we priced the asphalt as a three=inch thick section, Since we are placing a
four-inch thick section on this project, we are requesting additional compensation for the
increased asphalt quantity tapproximately SO ton).. An alternative is to have the pavement
section reduced to a 3" section, which is a rrlore common tlucltness for parking areas.
If there are.any questions please feel free to contact me at {406).Sa2-9841.
Sincerely//, -~
-'~i/"7 ~ ' dZ
3effrey T. Milesnick
Sime C.onstrucfion, Inc.
-
i - ~„ -;
n~.
-~
_..
..
...
BIN!B
BNBuilders, Inc.
Tuesday, August 4, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5004
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 5004
Description: Additional Ice/Water Shield at Roof
Proposed Amt: $ 789.60
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
After review in the field, it was determined that.there may be a high probability of ice dams forming around .
the roof eves along with the seam at the parapet and roof joint. This proposal is to provide Tabor, equipment
& material to install (1) row of ice and water shield at the parapet/roof seam and (2) rows of ice and water
shield at roof eves.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the final price for this work.
BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final prlce for this work.
Sub iced by: Accepted by: Date:
)) - - o G~',~---- ~ ~ ~9'
Scott Jay Mike l~seman
BNBuilders, Inc Dow/ing Sandho/m Architects
CHANGE PROPOSAL DERAIL BACKUP
Project #: 509004 CP # 5004
g N g ~ 2143 S ory Mill Road~ll Add.
Bozeman, MT 59715
BNBuilders, Inc. phone: 206-382-3443
Fax: 206-382-3440
Contractor Description Amount
Vapor Retarders $525.00
4 Man Hours 180.00
BNBuilders Inc. Overhead & Profit 84.60
BNBuilders, Inc. OH & Profit on Subcontractors $0.00
Totai: $789.60
t:
BIN~B
BNBuilders, Inc.
Tuesday, August 18, 2009
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal - CP# 5009
City of Bozeman Landfill Add. - 509004
Dear Mike Wiseman,
This letter is to request authorization to proceed with the followirig extra work:
CP Number: 5009
Description: Cabinetry Change
Proposed Amt: $0,344.00)
Days Requested: 0 days
Scope of Work {see attached for detailed cost summary):
The specifications call for alaminate-faced residential cabinet. The attached credit is to provide Golden Oak, in
lieu of the specified laminate-faced.
Please sign below and return a copy of'this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after .
^ BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal
represents the final price for this work.
^ BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submi d by:
ScottJay
BNBuilders, Inc
Accepted by:
Date:
Mike Wiseman
Dowling Sandholm Architects
~~
CHANGE PR®POSAL ®ETAIL BACKUP
Project #: 509004 CP # 5009
City of Bozeman Landfill Add.
2143 Story Mill Road
Bozeman, MT 59715
BNBuilders, Inc. phone: 2Ub-382-3443
Fax: 20b-382-3440
Contractor Descriation Amount
Golden Oak Cabinets in lieu of S ecified 1200.00
BNBuilders Inc. Overhead & Profit 144.00
BNBuilders, Inc. OH & Profit on Subcontractors $0.00
Total: $(1,344.00)
COMMISSION RESOLUTION N0.4197
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH BN BUILDERS, INC., BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 27th day of May 2009, authorize award of the bid for
the Construction of the Bozeman Landfill Addition to BN Builders, Inc., Bozeman, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a
municipal corporation, and BN Builders, Inc., Bozeman, Montana, as contained in Change Order # 1 and
Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby
authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk
is authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular
session thereof held on the 31st day of August, 2009.
G~
KAAREN JAC SON, Ma or
Page 1 of 2
STAC EN, M
City Cler
APPROVED AS TO FORM:
AN
Attorney
Page 2 of 2