Loading...
HomeMy WebLinkAboutProposed Curb Replacement Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Rick Hixson, City Engineer Debbie Arkell, Director of Public Service Anna Rosenberry, Director of Finance Chuck Winn, Assistant City Manager SUBJECT: Curb Replacement MEETING DATE: August 31, 2009 AGENDA ITEM TYPE: Action RECOMMENDATION: Provide direction to staff with respect to updating the City’s curb replacement program. As part of this effort we have prepared and included two possible versions of financing scenarios for the commission to consider. These scenarios would allow the city to re-build 5 miles, approximately $2,750,000.00 worth of the poorest curb in town (today’s costs) over the next 11 or 12 years. The first version finances these projects without support from individual property owners, the second is based on a 50 – 50 split between private property owners and other, community-wide sources such as gas tax money or urban funds. BACKGROUND: Up until January 1990, curb and gutter was treated in the same fashion as sidewalk, that is, it was the responsibility of the adjacent property owner to maintain it. Ordinance 1300 removed curb and gutter maintenance from the property owner’s purview. Later that year, Ordinance 1310 was adopted, creating the Street Maintenance Assessment, the purpose of which was to provide “the method for the maintenance of streets, alleys and public places and providing for the method of paying said costs thereof…” At present every dollar collected under the Street Maintenance Assessment is used to fund the Street Department who sweep, plow, repair and otherwise maintain the city’s 200 plus miles of streets and alleys. Unfortunately, while the Street Department has been able to use some of those funds to replace deficient curbs (see attached summary of “Curb/Ramp Work 2005-2009), we have a significant backlog of curb in poor and fair condition and at our current rate of investment, we will find ourselves falling further behind on its replacement. The other source of funding the city currently uses for curb replacement is Gas Tax money. These dollars are distributed by the state to the cities in proportion to their size. Bozeman currently receives approximately $600,000.00 per year in Gas Tax money. The Department of Transportation notifies the City Clerk each year in June what the actual allocation is going to be. While this money is primarily used to pay for the annual street improvements projects the city bids out every spring, ADA compliant curb ramps and curbing adjacent to those ramps as well as some sidewalks which are in the project area are also replaced. 126 As was discussed at the July 20th budget discussion, replacement of the curb on both sides of a street width (600 lineal feet) and the associated pedestrian ramps costs approximately $40,000/block. The current budget includes the following for curb/ramp replacement: Source Amount Street Maintenance Fund $20,000 Gas Tax Fund $50,000 TOTAL FY10 Recommended Budget $70,000 Or 1.75 blocks curbs/ramps (1,050 lineal feet) Whichever funding mechanism is used, implementation of a curb replacement program should be done in a way that minimizes disruption to the public. For example, let’s assume for discussion that a decision was made to increase the Street Maintenance Assessment by 2%, generating an additional $42,000.00 and to replace the curb on South Willson Avenue. The total estimated cost of that project as shown on the attached Proposed Curb Replacement Areas list is $240,000.00. It would be disruptive to do the project $42,000.00 at a time, returning to the same neighborhood 6 years in a row. We could either save the money for 6 years or use the idea of selling a General Obligation Bond financed by the increase in the Street Maintenance Assessment, to generate the $240,000.00 and complete the entire project in one year. Potential Funding Sources for Curb Replacement Near Term Gas Tax This is the fund which the city currently uses to pay for the annual Street Improvements project and the annual curbing and sidewalk improvement projects. The lion’s share of the money goes to street improvements with enough reserved to make sure we upgrade all of the intersection corners with ADA compliant pedestrian ramps. It should be noted that this source cannot be used for personnel or equipment. We also try to fill in gaps in the sidewalk network which are in the area of the project since typically it is a good time to make those improvements when the concrete company is already in the area. There are currently 26.6 miles of city streets which are in need of overlay treatments and 25 miles of streets which are in need of chip sealing. At our current rate of investment it would take us approximately 18 years to overlay the streets which need treatments if no further deterioration of the remaining streets took place. However, unlike curb and gutter, which has a useful life in excess of 50 years, the service life of asphalt pavement is no more than 20 years. So 18 years from now when we have taken care of the streets currently on the list, there will certainly be 27 more miles of streets in need of overlays and 25 more miles of streets in need of chip seals. We feel it is in the City’s best interest not to divert any of the current investment in street improvements to curb improvements because of this backlog and because streets in poor condition constitute more of an immediate hazard to the driving public than deteriorated curbs do. 127 Street Maintenance Assessment Currently this assessment funds the City Street Departments activities. Some of this assessment is already used to fund curb replacement as illustrated above. In order to increase this amount without increasing the annual assessment, services that the Department provides would have to be cut in some other area, such as street sweeping or snow plowing. Increasing this assessment on the other hand would generate revenues which could be used for curb replacement without a reduction in the existing level of service. Attached to this memorandum is a Worksheet from the City Finance Director which illustrates the effect of increasing the assessment by 2% in FY 11 and 2% I FY 12 for the purpose of curb replacement. Urban Funds Informal discussions with the Montana Department of Transportation (MDT) have indicated that the City’s annual urban fund allocation can be used to rehabilitate curb and gutter on Urban routes. On the attached list of proposed curb replacement areas South Church Avenue and South and North Willson Avenue are Urban routes. For the fiscal years 2007 to 2012 our allocation is $1,240,700.00 per year (see attached Urban Highway Construction Program Summary). We are currently using our entire allocation through FY 2009 to pay for the South 19th Avenue improvements which are under construction at this time. MDT has estimated that upon completion of the South 19th Avenue project we will have a balance of slightly more than $3,000,000.00 for use on urban routes. The City has historically used this allocation to accomplish large projects on major routes in the City. Prior to the South 19th project for example, we used these funds for the South 3rd Avenue improvements done in 1997. Using these funds for curb replacement on South Church (est. $200,000.00) South Willson (est. $240,000.00) and North Willson (est. $80,000.00), the 3 urban routes on our proposed list, would set our timetable back for whatever the next large project will be (West College, Kagy, S. 8th …) by half a year. ARRA Funds - H.B. 645 As the Finance Director discussed at the July 20th Commission Meeting, The City needs to determine where the final $344,000.00 of the HB645 allocation should be spent. It needs to be spent by September 30, 2010 or it will revert to the State General Fund. A good use of these funds would be curb replacement and/or pedestrian ramps. We would do the work in-house and could certainly have a project ready for construction next season which would meet the September 30 deadline. Mid-Term Special Improvement District (SID) It is possible and permissible under MCA chapter 7-12-4102 to create an SID for curb replacement. The issue will no doubt turn on the potential for protest to block the district’s creation. Since all of the curb replacement areas are in older parts of town, the City holds no waivers of right to protest creation of such districts. Therefore, if 51% of the residents in a proposed district funded solely by SID were to protest, the district could not be created. If a combination of funding sources were to be used such that the amount funded by SID was 50% or less, the protest would not be sufficient per MCA 7-12-4113. 128 So in order to use an SID to pay for curb replacement it would probably be necessary to keep the amount financed by the district under 50%. It is possible that residents of a street or streets may be willing to fund curb replacement entirely by SID, but this does not seem likely. General Obligation (G.O.) Bond This may be an effective way to aggregate smaller segments into larger, less disruptive projects. It is important to note that a G.O. Bond must be approved by a vote of the public. It could be used in conjunction with one or all of the short term options. Here’s an example of how it could work. We decide that the way to raise funds is to increase the street maintenance assessment by 2%. This generates $41,000.00 per year. As discussed above, it is too disruptive to do these projects forty or eighty-thousand dollars at a time. So, we identify a street to rehabilitate, South Church for example, and sell G.O. bonds for the entire replacement project, estimated to be $200,000.00. We then use the revenue generated by the 2% street maintenance assessment increase to pay off the Bond. This method could be used in conjunction with any or all of the other options. It could also be used by itself, but it would probably be difficult to get the community at large to support this option as a stand-alone method. Community Transportation Enhancement Program (CTEP) While we cannot use CTEP funds for curb repair, ADA compliant Pedestrian ramps are eligible for CTEP funding at either new or existing sidewalks. There is an application process, a "public input" process as well as a local match requirement of 13.42% to obtain CTEP funding. The City Commission needs to solicit public input on how the CTEP funds should be used, and decisions should be recorded in meeting minutes. The Commission ultimately decides how the funds will be used, but the public must be given the opportunity to comment. Bozeman currently has a balance of $293,564.73 available, exclusive of the College pathway project. The required match for that amount is $39,396.39. We are bringing this issue up in this memo because it makes sense to replace the curb ramps at the same time that we are replacing the adjacent curbing. Long Term Urban and Collector Assessment The idea of a city-wide Urban and Collector Assessment to provide funding for street improvements to those two functional classifications of streets has been briefly discussed before. The City of Billings has just such an assessment. In Billings it is a per-square-foot assessment based on a property’s zoning designation. These funds could be used to maintain city arterials and collectors which are not on the MDT urban route list. These are streets like Koch, Grant, Lincoln, Tamarack, Fowler and many others. None of the streets on our suggested list of proposed curb replacement areas would fall into this category at the present time. Stormwater Utility The EPA’s Phase 2 Stormwater regulations will, in the relatively near future, force the city to find some way of paying for mandated stormwater improvements. Creation of a stormwater utility and funding it with an assessment of some sort (impervious surface, zoning designation, a combination of those…) may become a necessity. 129 We are not suggesting that that day is today, but once such a utility is created, it will be possible to use that money to pay for curb and gutter since it is integral to stormwater management. Local Option Gas Tax (City/County 2¢) Montana counties have the option of levying up to 2¢ per gallon of gas to use for such purposes. This would have to be done in conjunction with the county with whom we would divide the revenues. Such a levy would have to be approved by both City and County Commissions and must be approved by a vote of the public. We have attached to this memorandum a Proposed Curb Replacement Area list. This list is in order of priority from our point of view, although all of the projects on the list merit the investment. The highest priority from our perspective is South Church Avenue, due to MDT scheduling a chip seal project on that street for next summer. If we were able to replace the curbs on this street before the Department chip seals it, the finished project would be seamless. This would be quite beneficial in terms of the street’s service life. We believe that some discussion of the issues involved in improvements to South 8th Avenue is warranted as part of this presentation. South 8th Avenue is in need of re-construction from Harrison Street to Main Street. Because South 8th has a median, it has more than twice as much curb and gutter as a typical street. In addition to the pavement, base layers, storm drains and curb and gutter, we also need to replace the water main. If we were to replace the curb and gutter before we replace the water main, we would be digging through, then replacing that new curb when the main is replaced and all of the service lines are re-established. For this reason it is wise to replace the water main first. That project is scheduled for the summer of 2011. We believe that once the water main is replaced it does make sense to go ahead and replace the curb and gutter, leaving the street reconstruction as the last element of the South 8th project. We will be looking for direction from the commission as to how to fund that project at that time. As discussed under the Urban Funds section above, at the end of the South 19th Avenue project the City will have approximately $3,000,000.00 available in Urban Funds. Three of the projects on the Proposed Curb Replacement Area list are urban routes – South Church, South Willson and North Willson. Our total estimated cost for those 3 projects is $520,000.00. In general I think that the best use of these funds is on large, expensive projects which benefit the community at large and can’t be paid for easily, projects like South 19th Avenue or West College Street. However, I do think it would be beneficial to replace the curbs on the three urban routes on our list in one larger project next summer, financed with urban funds. A lot of curb could be replaced in the near term and we would still have a good start on saving for the next big urban project. FISCAL EFFECTS: The fiscal effects of any program will depend on the method the Commission chooses to use to finance it. Using existing methods, we have prepared two scenarios that could begin funding curb replacement within a relatively short period of time. Proposed Scenario #1 approaches curb replacement as entirely a “community-wide” responsibility, using collective street maintenance resources: gas taxes, current and increased street maintenance assessments, HB645 allocation and urban funds (where eligible). The results are: 130 Scenario #1: 1 10 projects completed by FY20 (within 11 years.) 2 Street Maintenance Assessment increases by 2% in FY11 and an additional 2% in FY12 for continued t Fund. 3 Urban Funds of $1.27M are utilized for curbs on urban routes. 4 No SID's are created or assessed. Proposed Scenario #2 assigns 50% of the costs of curb replacement to the adjacent property owner by creation of a Special Improvement District assessment, payable over 20 years. The remaining 50% is funded by community-wide resources for street maintenance: gas taxes, existing street maintenance assessments, and urban funds (where eligible.) Scenario #2: 1 These 10 projects completed by FY21 (within 12 years.) 2 Street Maintenance Assessments do not increase over their current rate as a result of this plan. 3 Approximately $1.7M in SID's are issued over 12 years (not including finance costs). 4 Estimated annual SID assessment for 100' of curb = $270 ($22.50/month) 5 $635,000 of Urban Funds are spent on curbs on urban routes. ALTERNATIVES: As suggested by the City Commission. Attachments: Curb Replacement Areas Map Proposed Curb Replacement Areas List Curb/Ramp Work Summary 2005-2009 Curb Condition Map Curb Plan Version 1 Curb Plan Version 2 Report compiled on: August 21, 2009 131 S 6TH AVE S 4TH AVE S 5TH AVE S 3RD AVE S 8TH AVE S GRAND AVE S TRACY AVE S CHURCH AVE S WILLSON AVE S BLACK AVE W MAIN ST S 9TH AVE W KOCH ST W OLIVE ST W BEALL ST W STORY ST W LAMME ST S 7TH AVE W CURTISS ST W COLLEGE ST W BABCOCK ST E MAIN ST W HARRISON ST E OLIVE ST W DICKERSON ST E LAMME ST W ALDERSON ST W MENDENHALL ST W CLEVELAND ST S BOZEMAN AVE E BABCOCK ST E STORY ST E GARFIELD ST W GARFIELD ST E MENDENHALL ST N 9TH AVE N 5TH AVE N 7TH AVE E BEALL ST N TRACY AVE N BLACK AVE N ROUSE AVE N GRAND AVE N 8TH AVE N CHURCH AVE N WILLSON AVE S ROUSE AVE LINDLEY PL ICE POND R D DELL PL PERKINS PL E ALDER S O N ST E COLLEGE ST E HARRISON ST BONNER LN S 5TH AVE N 7TH AVE S 3RD AVE S 8TH AVE S ROUSE AVE P r o p o s e d C u r b R e p l a c e m e n t A r e a sProposed C u r b R e p l a c e m e n t A r e a s 825 0 825412.5 Feet ¯L e g e n dLegend Proposed Curb Replacement TEXTTEXT DATE 8/13/09 * THIS MAP IS FOR ENGINEERING DEPARMENT PURPOSEST ONLY, FOR MORE INFORMATION CONTACT THE ENGINEERING DEPARTMENT 132 Proposed curb replacement areas Estimated costs are for curb replacement only. 1. South Church, Story to Babcock (urban route, collector) MDT has proposed a chip seal, possibly next year. It would be good to get curb replaced prior to that. Minimum to do would be west side, Story to south approach to Bogert Park, this is about 625 lf. Install valley gutters at Story and Bogert Place and ADA ramps for better access to Peets Hill. Est. cost: $41,000. Could replace all curbing on this street segment, est. cost: $200,000. 2. S. Willson, Koch to Harrison (urban route, arterial) Pavement is in relatively good shape, but due to the many overlays the gutters are steeply sloped and impossible to clean good with street sweepers. Curb fair to totally gone. Est. cost: $240,000. 3. S. Tracy, Story to ½ block south of Harrison Snow route with a school. Curb fair to poor, pavement poor. Replace curb to facilitate future mill/overlay. Install valley gutters or storm drains to get rid of shallow drain pipe crossings at College. Est. cost: $220,000. 4. Olive, Grand to 8th Snow route, higher than normal traffic load for a local street. Curbs poor, pavement poor, replace curbs to facilitate mill/overlay. Watermain replacement may still be needed in 600 block. Est. cost: $270,000. 5. Olive, Black to Church Snow route, higher than normal traffic load for a local street. Curbs poor, pavement poor, replace curbs to facilitate mill/overlay. Watermain replacement needed at Bozeman and Lindley Place. Est. cost: $175,000. 6. S. Bozeman, Olive to Koch Water main replacement needed. Curbs poor, pavement poor. Could possibly combine into one project (main replacement, new curbs, re-paving). Est. cost: $110,000. 7. N. Willson, Mendenhall to Beall (urban route) Curbs fair to poor, pavement fair. Replace curbs to facilitate mill/overlay. Install valley gutters at Lamme to get rid of shallow drain pipes. Est. cost: $80,000. 133 8. S. Grand, Olive to Garfield Bike route. Curbs fair to poor. Pavement poor. Replace curbs to facilitate mill/overlay. Full reconstruction may be necessary on some blocks. Est. cost: $475,000. 9. Story Street, Church to Tracy Snow route. Curbs poor to totally gone. Full street reconstruction may be necessary. Est. cost: $230,000. Water main work needed at Bozeman and Dell Place. 134 Curb/Ramp Work 2005-2009 Description Total Cost (curbs/ramps only) LF of Curb Replaced Ped. Ramps installed (# of corners) FY 2004 Curb/Ramp Project $68,546 590 20 (E. Olive/S. Black) FY 2006 Curb/Ramp Project $77,962 1332 10 (Westlake Park, S. Tracy, W. Cleveland) (Note: 740 LF was new curb along N. 5th) FY 2007 Curbs and Walks Project $58,920 724 4 (Curtiss St.) FY 2009 Curb/Ramp Project $78,575 1526 9 (S. 9th and Alderson) 2009 Misc. Curbs/Ramps $27,167 240 10 (S. Black, S. Bozeman, E. Lincoln) S. Willson $18,136 286 0 (Downtowner Mall) W. Olive/Tamarack & Wallace $20,126 247 3 Miscellaneous Spot Repairs 2005-2008 $ 6,090 118 2 Totals $355,522 5,063 58  135 136 Assumptions:1 Curb project costs inflation factor of  3.5% each year.2 Curb fund earn and pays interest 1.5% each year.3 Current $50,000 of Gas Tax money transferred into Curb Fund each year.4 Current $20,000 of Street Maintenance money transferred into Curb Fund each year5 Street Maintenance Assessment increases by 2% in FY11 and an additional 2% in FY12 for transfer to Curb Fund.6Urban funds will be utilized for curbs on urban routes.7 HB645 ARRA Funds of $344,000 are utilized for the S. Grand curbs in FY10.Results: 1 These 10 projects completed by FY20 (within 11 years.)2 Street Maintenance Assessment increases by 2% in FY11 and an additional 2% in FY12 for continued transfer to Curb Fund.3Urban Funds of $1.27M are utilized for curbs on urban routes.4No SID's are created or assessed. Curb ProgramScenario 1Assumptions & Results   1137 FY10FY11FY12FY13FY14FY15FY16FY17FY18FY19FY20FY21Beginning Balance‐$                    (61,000.00)$           50,085.00$             204,836.28$      62,554.99$        91,265.79$       246,634.77$       189,214.61$    346,052.83$    202,377.55$    359,413.21$     208,472.68$       Plus:  Revenue Sources 934,000.00$      112,000.00$          154,000.00$           904,000.00$      154,000.00$      154,000.00$     154,000.00$       154,000.00$    154,000.00$    154,000.00$    154,000.00$     154,000.00$       Plus:  Interest Earnings(915.00)$                751.28$                  3,072.54$          938.32$             1,368.99$          3,699.52$            2,838.22$        5,190.79$        3,035.66$         5,391.20$         3,127.09$            Less:  Curb Expenditures 995,000.00$      ‐$                       ‐$                         1,049,353.83$   126,227.53$      ‐$                   215,119.68$       ‐$                  302,866.08$    ‐$                  310,331.73$     ‐$                      Ending Balance(61,000.00)$       50,085.00$            204,836.28$           62,554.99$        91,265.79$        246,634.77$     189,214.61$       346,052.83$    202,377.55$    359,413.21$    208,472.68$     365,599.77$       Scenario 1Curb Program Summary of Balances, Revenues & Expenditures2138 FY10FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 TOTALSRevenue SourcesAllocation of Gas Tax50,000.00$         50,000.00$      50,000.00$     50,000.00$   50,000.00$    50,000.00$    50,000.00$     50,000.00$   50,000.00$   50,000.00$     50,000.00$    50,000.00$    600,000.00$     Allocation of Street Mtc Assessments20,000.00$         20,000.00$      20,000.00$     20,000.00$   20,000.00$    20,000.00$    20,000.00$     20,000.00$   20,000.00$   20,000.00$     20,000.00$    20,000.00$    240,000.00$     Increase in Street Mtc Assessments42,000.00$      84,000.00$     84,000.00$   84,000.00$    84,000.00$    84,000.00$     84,000.00$   84,000.00$   84,000.00$     84,000.00$    84,000.00$    882,000.00$     ARRA Dollars ‐ HB 645344,000.00$       344,000.00$     Urban Funds Dedicated to Curb Projects520,000.00$       750,000.00$ 1,270,000.00$ SID's (50% of Project Costs) ‐$                     ‐$                    Total Revenue Available934,000.00$       112,000.00$    154,000.00$   904,000.00$ 154,000.00$  154,000.00$  154,000.00$   154,000.00$ 154,000.00$ 154,000.00$   154,000.00$  154,000.00$  3,336,000.00$  Scenario 1Curb Program Revenue Projections3139 FY10FY11FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20Projects1 Urban ‐ S. Church200,000.00$       2 Urban ‐ S. Willson240,000.00$       3S. Tracy 310,331.73$ 4 Olive  (Grand ‐ 8th)299,353.83$      5 Olive (Black ‐ Church) 215,119.68$ 6S. Bozeman 126,227.53$ 7 Urban ‐ N. Willson80,000.00$         8S. Grand475,000.00$       9 Story 302,866.08$ 10 Urban ‐ S. 8th750,000.00$      Total Expenditures995,000.00$       ‐$                      ‐$              1,049,353.83$   126,227.53$ ‐$                215,119.68$ ‐$               302,866.08$ ‐$               310,331.73$ Curb Program Project ListScenario 14140 Assumptions:1 Curb project costs inflation factor of  3.5% each year.2 Curb fund earn and pays interest 1.5% each year.3 Current $50,000 of Gas Tax money transferred into Curb Fund each year.4 Current $20,000 of Street Maintenance money transferred into Curb Fund each year5 Property owners with lineal curb will be assessed for 50% of the project and financing costs through an SID6 Urban funds will be utilized for curbs on urban routes (along with property owner SID's)Results: 1 These 10 projects completed by FY21 (within 12 years)2 Street Mtc Assessments do not increase over their current rate as a result of this plan.3 Approximately $1.7M in SID's are issued over 12 years (not including finance costs).4 Estimated annual SID assessment for 100' of curb = $270 ($22.50/month)5 $635,000 of Urban Funds are spent on curbs on urban routes.Curb ProgramScenario 2Assumptions & Results   141 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21Beginning Balance‐$                    70,000.00$            141,050.00$           68,550.38$        78,599.15$        149,778.13$     (60,050.69)$        9,048.55$        (32,140.16)$     197,974.41$    270,944.02$     182,789.33$    Plus:  Revenue Sources 590,000.00$      70,000.00$            214,615.38$           880,979.48$      70,000.00$        352,075.50$     70,000.00$         181,324.44$    230,596.67$    70,000.00$       232,218.86$     230,596.67$    Plus:  Interest Earnings 1,050.00$              2,115.75$               1,028.26$          1,178.99$          2,246.67$          (900.76)$             135.73$            (482.10)$          2,969.62$         4,064.16$         2,741.84$        Less:  Curb Expenditures 520,000.00$       ‐$                       289,230.75$           871,958.97$       ‐$                    564,151.00$      ‐$                     222,648.87$     ‐$                   ‐$                  324,437.71$     321,193.34$    Ending Balance 70,000.00$        141,050.00$          68,550.38$             78,599.15$        149,778.13$      (60,050.69)$      9,048.55$            (32,140.16)$     197,974.41$    270,944.02$    182,789.33$     94,934.50$      Scenario 2Curb Program Summary of Balances, Revenues & Expenditures142 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 TOTALSRevenue SourcesAllocation of Gas Tax 50,000.00$         50,000.00$      50,000.00$     50,000.00$   50,000.00$    50,000.00$    50,000.00$     50,000.00$   50,000.00$   50,000.00$     50,000.00$    50,000.00$    600,000.00$     Allocation of Street Mtc Assessments20,000.00$         20,000.00$      20,000.00$     20,000.00$   20,000.00$    20,000.00$    20,000.00$     20,000.00$   20,000.00$   20,000.00$     20,000.00$    20,000.00$    240,000.00$     Increase in Street Mtc Assessments‐$                    ARRA Dollars ‐ HB 645‐$                    Urban Funds Dedicated to Curb Projects 260,000.00$       375,000.00$ 635,000.00$     SID's (50% of Project Costs) 260,000.00$         144,615.38$   435,979.48$ 282,075.50$    111,324.44$ 160,596.67$ 162,218.86$  160,596.67$  1,717,406.99$  ‐$                    Total Revenue Available 590,000.00$       70,000.00$      214,615.38$   880,979.48$ 70,000.00$    352,075.50$  70,000.00$     181,324.44$ 230,596.67$ 70,000.00$     232,218.86$  230,596.67$  3,192,406.99$  Scenario 2Curb Program Revenue Projections143 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20Projects1 Urban ‐ S. Church 200,000.00$       2 Urban ‐ S. Willson 240,000.00$       3S. Tracy 4 Olive  (Grand ‐ 8th) 289,230.75$5 Olive (Black ‐ Church) 222,648.87$ 6S. Bozeman 121,958.97$ 7 Urban ‐ N. Willson 80,000.00$          8S. Grand 564,151.00$ 9 Story324,437.71$ 10 Urban ‐ S. 8th 750,000.00$ Total Expenditures 520,000.00$        ‐$                       289,230.75$871,958.97$ ‐$                564,151.00$ ‐$                222,648.87$ ‐$                 ‐$                324,437.71$ Curb Program Project List144