Loading...
HomeMy WebLinkAboutResolution 4192 Williams Bro. Co. Change Order for WRF Phase ICOMMISSION RESOLUTION N0.4192 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20th day of July 2009. /~~-n _ KAAREN JACOBS N Mayor ATTEST: STA MEN, CMC City APPROVED AS TO FORM: G E LLI AN City Attorney C, Resolution No. 4/92, page 2 oft ~~~ CHANGE ORDER 1 L ~ MORRISON ~r~MAIERI.E,~rc o. • DATE OF ISSUANCE EFFECTNE DATE OWNER Cityof Bozeman CONTRACTOR Williams Brother Construction , LLC Contract: Bozeman WRF Phase 1 Improvements Project: Bozeman Water Reclamation Facility OWNER's Contract No. SRF C303105-01 ENGINEER HDR/MMI ENGINEER's Contract No. 00..60746 You are directed to make the following changes in the Contract Documents: Description: Make changes identified in Change Proposal Request No. OO1R, 002R, 003, 005, 006, 010, 011 and 012 as described in the attached documentation. Reason for Change Order: Cost savings and miscellaneous additional work. Attachments: Change Order No. 2 Summary with referenced attachments. CHANGE IN CONTRACT PRICE: Original Contract Price $ 36 362 223.00 Net Increase (Decrease) from previous Change Orders No. 0 to 1 $ 18 0000.00 Contract Price prior to this Change Order: $ 36 380 223.00 Net increase (decrease) of this Change Order: $ (203 713 45) Contract Price with all approved Change Orders: $ 36 176 509.55 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: October 5.2011 - Ready for final payment: January 8 2012 (da s or dates Net change from previous Change Orders No. 0 to No. 1 Substantial Completion: 0 Ready for final payment: 0 da s Contract Times prior to this Change Order: Substantial Completion: October 5 2011 Ready for final payment: January 8 2012 da s or dates Net increase (decrease) this Change Order: Substantial Completion: 0 Ready for final payment: 0 (days) Contract Times with all approved Change Orders: Substantial Completion: October 5 2011 Ready for final payment: January 8 2012 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein an less expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents fu c t and value for the subject work performed and the materials supplied under the terms of the contra d th t work quantities and value were properly determined and are correct. 7- 7-0 9 RACTOR (Authorized Signature) Date RECOMMENDED BY: ~/~ ~ (ENGINEER -Signature) Date APP VE BY:. 7~~ OWNER (Authorized Signature) Date EJCDC 1910-8-B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. • Change Order No. 2 Summary Bozeman Water Reclamation Facility, Phase 1 Improvements Summary This change order consists of eight Change Proposal Requests (CPR) and includes both cost saving items and additional work. The following is a list of the CPRs included in the change order: CPR Description Price Time 1 R Northwestern Agreement Changes $ 8,001.40 0 2R Pump Station Relocation ($1 88,571.53) 0 3 System 2 Restrained Pipe ($ 80,358.50) 0 5 Splitter Box Pipe Change ($ 4,658.15) 0 6 Gate and Access Changes $ 18,813.11 0 10 Blower Horsepower Change $ 15,131.84 0 11 Drain under Utilidor $ 12,553.38 0 12 Over Excavation and Backfill $ 15,375.00 0 Total ($203,713.45) 0 CPR 1 R Northwestern Agreement Changes The Contract was bid and awarded without a final agreement in place with the City and Northwestern Energy in regards to the land exchange and thus some items needed to be changed or added to the contract to comply with the agreement. The changes include adding an approach to Northwestern Energy's substation and modifying the fence along Moss Bridge Road. Documentation included for this change is CPR 1 R with drawing sheet and a sheet with the breakdown of the costs. CPR 2R Pump Station Relocation The relocation of the pump station (Primary Effluent Pump Station -PEPS) was proposed by Williams Brother Construction as a cost savings to the project. The major cost savings item is that the Primary Effluent Pump Station can be constructed without installing an elaborate shoring system on the east side of the Northwestern Energy's substation. The relocation does require some additional work including, piping, excavation and other miscellaneous work. Documentation included for this change is CPR 2R with drawing sheet and Construction Documentation Form No. 002R with detailed breakdown and recommendation. CPR 3 System 2 Restrained Pipe The change in the type of restraint for System 2 Piping was proposed by Williams Brother Construction as a cost savings to the project. The change includes reducing the number of bell restraints required on the project. Documentation included for this change is CPR 3 and Construction Documentation Form No. 003 with detailed breakdown and recommendation. CPR 5 Splitter Box Pipe Change The change in the configuration of the 24" Mixed Liquor line was proposed by Williams Brother • Construction as a cost savings to the project. The change eliminates three fittings. Documentation included for this change is CPR 5 and Construction Documentation Form No. 005 with detailed breakdown and recommendation. N:\2105\054\Construction Docs\Change Orders\CO 2\Change Order 2 Summary.docx • CPR 6 Gate and Access Chances This change includes adding gates to the perimeter fence, modifying the main gate and access way and modifying access to the future digester control building. These modifications were requested by the Water Reclamation Facility in order to accommodate access for a variety of uses. These include providing access to the USGS Gauging Station, access to an irrigation ditch and plant grounds and to allow for large trucks to enter the facility through the gate by the Administration Building. Documentation included for this change is CPR 6 with drawing sheets and Construction Documentation Form No. 006 with detailed breakdown and recommendation. CPR 10 Blower Horsepower Chance The change entails increasing the size of the electrical support equipment for the blowers, increases size of feeder cabling and breakers for each of the three blowers. The blower connected horsepower ended up being greater than originally indicated by the blower manufacturer's during design. Documentation included for this change is CPR 10 and Construction Documentation Form No. 010 with detailed breakdown of the costs. CPR 11 Drain under Utilidor The change is required due to a conflict with the existing underdrain system and the utilidor. While the plans indicate a conflict and describe how to reroute the underdrain pipe, additional effort is required as a manhole on the underdrain is in conflict with the utilidor and the underdrain is constructed with asbestos cement pipe. Documentation included for this change is CPR 11 and Construction Documentation Form No. 011 with detailed breakdown of the costs. CPR 12 Over Excavation and Backfill Unsuitable soils for subgrade have been encountered for a number of building foundations and for some of the access roads. The unsuitable material is being excavated and disposed of on- site and being replaced with suitable material excavated from other areas of the site. The estimated quantity of over excavation is 2,500 cubic yards. The over excavation will be paid at $6.15 per cubic yard based on a measurement of the excavated material. Price shall include excavation and removal, import of suitable material and backfilled and compacted per specifications. End U N:\2105\054\Construction Docs\Change Orders\CO 2\Change Order 2 Summary.docx s • ~. ; MORRISON MAIERLE, IHc CHANGE PROPOSAL REQUEST (Not a Change Order) Project: Bozeman WFR Phase 1 Improvements CPR No.: 001 CPR Date: 2/9/2009 Date Sent to Contractor: 2/10/2009 Date Recd from Contractor: TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Modifications to the location of fencing change in size and location of a Gate and construction of an aoaroach to the Northwestern Substation Changes are shown on the attached exhibit "CPR #001". I ~~ '~^""'''~"~~ Date: 2/10/2009 HDR/MM TO: HDR Engineering, Inc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor TO Accepted/Not Accepted Accepted/Not Accepted Date HDR/MMI: Date Owner: Date • ~~. ~~~ ~~O s~~ ~ r cn ~z O 4 xr~- n A o ~ i m A I f y _. ! 1 w ~ s Z , , ~ ~ '... .__..... .,. I L i I i i ~ A 3 3 m d N' 10' I I I i ~I I U v 0 °w 0 ~ z n D D ~ m m o O O II O n W N O_ N m O O `~ O y n i W V O+ NN A N ZZ O rn rn rn rn m ~ m N rn a z 0 m a m m N m m A 0 W Oo A N b W OWO N ? O t0 U~ O~ 1+ ~O W J W W ~ J Oo N ~ O ~ O V W V ~ V U N N (((+++D~~~ y D t0 N W ~O W N W N ~ N N Z ~ f~l W A ~ A Oo Oo N N O O -~ D z O z O cn cn o ~ o n+ O m ~ X A 0 ]1 0 m Z Z V1 "~ m Z n m n f~l 0 y A A A o Z 0 ~ ~ 0 n x o n x y z z _ i i' ' i i i i I I ~ I _ i _- - _..., I ~ i ~ I I ~~ ~ I i i ' I j I ii i I ~ ,~~ ~ ~ 1 ~ ~ ' I i i ~~ / I I >~_ _uP 00 y O~ y VI m Z fTl D~ VSO n D Zofoxrynmrn ~nnD OC N ~~VmCOOxOZCCOr r ~ z 2 ~ D ~ OG 2 nOZT.~SJ x'^-~A ~n~ ~ ~~ m~ nn°ZnN~n ~~"o ~x D O i c N ° ~ o N °z O ~~' Am z z m~mnANN ~ o n m xm ~ ; NN=mo oz c>o=mn~~nD y o~ o n c ~ m N <_omZmc~m mimZ D ° rm+~+ ni m v_~vr .n°Aa mo zm ? m o Z ? A~ O Z Z~ Z O m D p~ nm~ _~ A g m o O O p~ O Z O D O y~ O x o v mO~c~~m~xOO ~fn ~ -. J Dmz~xmym`"~o o o z o mm ~ ~ ° s ~ vmi A la m (l I ~ D I ~~ ~. -.__._.. i CONSTRUCTION DOCUMENTATION FORM No. 001 R • HDR ENGINEERING, INC. Project: Bozeman WRF Date: 5-8-09 Description: CPR-001 R See attached breakdown Response: ~~ ~ ~~~c1 Q ~1 Cost %'S, ~ (1 ~ y ~ Credit Schedule Change Days Contractor ____ .~ ~.~.n~"o HDR ~~~to~~.~ J L.l~- ~~`~ ,~ "' City Date `5-8-09 Date: b ~( a ~ Date: 1 r CPR 001R • M M 106/16/09 Add Fence End Post Corner Post X Braces Holes Subtotal Mark-up (7.01%) Unit Price Number Unit $ 14.15 40 If $ 87.50 1 ea $ 106.25 4 ea $ 156.25 8 ea $ 156.25 8 ea Total $ 566.00 $ 87.50 $ 425.00 $1,250.00 $1,250.00 $ 3,578.50 $ 250.85 Pot Hole Gas Re-survey Strip and Excavate Sub-base Gravel Base Gravel Subtotal Mark-up(17.11%) $ 200.00 2 ea $ 65.00 2 ea $ 4.50 180 yd $ 11.75 120 yd $ 16.25 50 yd Tota I Asphalt work paid at unit price $ 400.00 $ 130.00 $ 810.00 $1,410.00 $ 812.50 $ 3,562.50 $ 609.54 $ 8,001.40 • Price Number Unit Total Add fence $ 14.15 440 Lf $ 6,226.0 End post $ 87.50 1 ea $ 87.5 Corner post $ 106.25 4 ea $ 425.0 X braces $ 156.25 8 ea $ 1,250.0 Holes $ 156.25 8 ea $ 1,250.0 Pot hole gas lines $ 200.00 2 ea $ 400.0 Re-survey $ 65.00 2 ea $ 130.0 Strip & excavate approach $ 4.50 180 yd $ 810.0 Sub-base gravel $ 11.75 120 yd $ 1,410.0 Base gravel $ 16.25 50 yd $ 812.5 Asphalt unit price Mark-up 18% $ 2,304.18 $ 2,304.2 Deduct fence $ (14.15) 400 Lf $ (5,660.0) Mark-Up 8% $ (452.80) 1 LS $ (452.8) $ 8,992.4 • • • CPR #001-R Deletion: 400' X $14.15 = ($5660.00) Addition: 440' X $14.15 = $6226.00 ] -End Post X $87.50 = $87.50 4 -Corner Posts X $106.25 = $425.00 8 - Braces X $156.25 = $1250.00 8 - Holes X $156.25 = $1250.00 TOTAL ---- $9238.50 Total Addition for CPR #001-R is $3578.50 • ,, ~MORRISON CHANGE PROPOSAL REQUEST ,~Irrti MAIERI.E WC. (Not a Change Order) Project: Bozeman WRF Phase 1 Improvements CPR No.: 002 CPR Date: 2/05/2009 Date Sent to Contractor: 2/19/2009 Date Recd from Contractor: TO: Williams Brother Construction Please furnish your proposal for executing the following changer(s): Move the Primary Effluent Pumping Station approximately 30 feet to the east per attached drawing. Reroute PE HDR/MMI ~ ~, -~„~.~-- Date: 2/19/2009 TO: HDR Engineering, Inc. /Morrison Maierle, Inc. Proposal: • Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted Accepted/Not Accepted HDR/MMI: Date Owner: Date • • • • ~.~~.. ~~O ~~~ ~ ~ `~O $z ~ n A N N 3 m 7 3 6 O Y w m N~ 3 ~o N 01 N ~ ~ ' ~ ~ O - - ~ ~ ~ N O O T O N m n n D ~ m m - n ~ ~ O o N n O G O N 4 ~ nrC1 A ~ N D y O zmz o~c~ InDp S O f ~ m Z O O O A m ~ n m s~o A O O ~ocDi 0 os 0 ~o 0 3 D O 0 D ~ C m '^ nm =o n ~~ m ~^ NN ~m ? O a 0 u ~ o D m z T m m o ... w o = 0 ' f ~ [ 1 '' '' I '~ I I ~ \,,,,. _. ~ - ... _.... _...... ili j' '1 i I c " c ~ ' ... ~ ~ ' ~ mm ~ ~ m z rl I oym x vl O ~ _ ~ ....__ I K ~ i O ~: . I _......... _..._... - 2 i I i . i - ~ + I N _._._....._..._._..., v v m N ~ . I v m z I ~ N ~ O~ i _. _., m ti ° ~~7 npm ~z Nmmo i I: 1 ~ Nm - OZ ~~~~ 1 K ! zy I m I m oc~oo i ! I ~ ~m ~ zl ~ oocz ~ m i o N ~ T ~ , ~ O Z m ' O " m 1~ o N F p o~ R I ~ y y A y ~ G t„ m I m N ~ ~ Z l 9 m A Ca ~ ~ W O J ~ V .__......_ ~ .-::~' ;1 I \~ m l .. < i r......... _..... y, .. ~ i .. ~ ,-~ - .. ......, - ~ _ `.. ~ .. ...- . O ~ , . j ~ - . N nl W n 1 .~ • - ~ ~ . ~ D 1 i O .. ~ . m -Niv~~ ~' D D ~ A Z v ~ m °~~o m°z~ vln ~>~ m?~° o ~' 1 ~ D O S O A ~ r m ~ m O y ~ ~~ • CONSTRUCTION DOCUMENTATION FORM No.002R HDR ENGINEERING, INC. Project: Bozeman WRF Date: 5-6-09 Description: CPR-002R Per attached sheet Response: See attached sheet. Mark-ups changed and addition errors corrected on credit work .~1~~,s7I.s3 • cost credit Schedule Change Days Contractor ~ C.~~.o HDR ' ~'e cs AMC ~ Q ~ ~= City Date /' 5-6-09 Date: C~ ,~~~,~1 Date: CPR 002R M M 106/16/09 • Additional Work Total from WBC Sheet $ 85,791.20 Mark-up (17.11%) $ 14,678.87 Subtotal $ 100,470.07 Credit Items Total from WBC Sheet $ 270,107.10 Mark-up (7.01%) $ 18,934.51 Subtotal $ 289,041.61 Grand Total $ (188,571.53) • • C] • Price Number Unit Total Add 60' of 30" DI pipe $ 83.07 60 LF $ 4,984.2 installation $ 33.00 60 LF $ 1,980.0 Add 1 30" DI 90's with megalugs $ 5,727.00 1 EA $ 5,727.0 installation $ 576.00 1 LS $ 576.0 Add additional storm sewer manhole $ 2,920.16 0 EA $ - installation $ 300.00 0 LS $ - Add 39' of 36" RCP $ 63.03 0 LF $ - installation $ 28.00 0 LF $ - Add 16' of 15" PVC SDR 35 sewer $ 30.28 0 LF $ - installation $ 15.00 0 LF $ - Add additional slope excavation & backfill $ 5.25 11700 CY $ 61,425.0 Bollards $ 600.00 2 ea $ 1,200.0 installation $ 600.00 2 ea $ 1,200.0 Remove Approach & Haul $ 9.50 302 yd $ 2,869.0 Anchor Power Pole $ 3,500.00 1 LS $ 3,500.0 Asphalt Disposal $ 15.00 42 yd $ 630.0 Grade & Reseed $ 0.50 3400 sgft $ 1,700.0 Mark-up 18% $ 15,442.42 $ 15,442.4 Deduct 30' of 54" Hobas pipe $ (267.70) 30 LF $ (8,031.0) installation $ (55.00) 30 LF $ (1,650.0) Deduct shoring $ (250,000.00) 1 LS $ (250,000.0) Deduct 30' of 12" DIP $ (24.42) 30 LF $ (732.6) installation $ (33.00) 30 LF $ (990.0) Deduct 30' of 4" DIP $ (10.06) 30 LF $ (301.8) installation $ (12.00) 30 LF $ (360.0) Deduct 36" RCP end section $ (554.00) 2 EA $ (1,108.0) Deduct 30' of 24" DI pipe $ (59.27) 30 LF $ (1,778.1) installation $ (33.00) 30 LF $ (990.0) Deduct fence and gate $ 14.15 20 LF $ 283.0 Deduct 36" RCP $ 63.03 61.6 LF $ 3,882.6 $ (20,942.07) 1 LS $ (20,942.1) $ (181,484.3) • • • CPR #002-R Deletion: 160' X $14, l 5 = ($264.00) Addition:: l~0' X $14.15 = $1981.00 Total Deduction for CPR #002-~R is $283,00 • • { CONSTRUCTION DOCUMENTATION FORM No. 003 HDR ENGINEERING, INC. Project: Bozeman WRF 09 Date: 5-20- Description: CPR-003 Per attached quantity sheet. Response: ,Sec. a-h~a~~~ ~~0 3So~ S~ Schedule Change Contractor .~ (..r./~ro Date 5-20-09 HDR ' Rec na. J ~ ~ Date: ~/~, ~ City Date: • • Add Restriants used per Price Number Unit Total Approved System 2 Drawings 4" mega-lug 23.82 29 ea 690.78 Installation 14.90 29 ea 432.10 8" mega-lug 40.23 12 ea 482.76 Installation 17.30 12 ea 207.60 12" mega-lug 78.73 44 ea 3,464.12 Installation 20.00 44 ea 880.00 24" mega-lug 276.34 21 ea 5,803.14 Installation 28.84 21 ea 605.64 30" mega-lug 708.54 33 ea 23,381.82 Installation 38.45 33 ea 1,268.85 Mark-up 17.11 % 6,367.80 6,367.80 Deduct Bell Restraints 4" -36.84 118 ea -4,347.12 Installation -29.80 118 -3,516.40 6" -53.63 8 ea -429.04 Installation -33.64 8 -269.12 8" -95.54 34 ea -3,248.36 • Installation -34.60 34 -1,176.40 12" -156.25 39 ea -6,093.75 Installation -39.40 39 -1,536.60 16" -191.49 46 ea -8,808.54 Installation -47.10 46 -2,166.60 24" -404.82 36 ea -14,573.52 Installation -57.68 36 -2,076.48 30" -833.06 56 ea -46,651.36 Installation -77.70 56 -4,351.20 36" -1,087.16 14 ea -15,220.24 Installation -97.08 14 -1,359.12 Mark-Up 7.01 % -8,119.25 1 LS -8,119.25 -80,358.50 U Y 1~1 • Add Restriants used per Price Approved System 2 prawings 4" mega-lug .Installation 8"'mega-lug... Installation 12" mega-lug Installation 24" mega.-lug Installation 30'` mega-lug. Installs#ion Mark.-up 17% Deduct Bell Restraints 4" Installation 6" Installation $~~ Installation '12'. instaNaton 46" Installation 24" Installation 30.. Installation 36" Installaf-an Nurnber Unfit Total 23..82 29 ea 690:7$ 14.90. 29 ea 4:32'.10 40..23 12 ea 482.76 17.:30 12 ea 2fl7.60 78:73 44 ea _3.;464.12 200.00 44 ea 8.;800.00... 276.34 21 ea 5,8Q3,14 2$:$4 21 ea 605.64 708.54 33 ea 23,381.$2 38.45 33 ea 1,26$.88 7,673.26 7,673.26 -36.84..._ 11$ ea -4,347.12 -29.$0 11$ -3;516.40 53.63. - $ ea' -429.04. -33.64 8 -269.1'2 _17.30 34 ea -5$8.20 :34.60.. 34 -1,176.40. 156.25 39 ea: -6,093.75 ' =39.40... 39 _1-;536.60, 191.49 46 ea -8;808.54 -47.10. 46 -2;166.60 404.82` 36 ea -14,573.62 -57.68 36 -2„p76.48 833.06 56 ea -46,651.36 -77.70 56 -4,351.20 1,0$7.16 14 ea -15,220,24.. >97.08 14 -1,359.12 Mark-U 7% -T,921.46 _ 1 LS -7,921.46. -6$,275,0$ • -SYSTEM 2 & 3 _ RESTRAINTS April 13, 2049 stem 2 Sheet # Pipe Description Restraints YP-1 30-PE PEPS-Bioreactor 12 YP-2 30-PE PEPS-Yard 7 YP-3 2~1-PE PEf~S-Tee 21 YP-~ 3d-ML Sputter-Yard 7 YP-8 30-ML Sputter-Yard. 7 YP;11 12-Df~V1! PEPS=RASNVAS 22 YP-12 (A) 12-D RASMIAS-Bioreactor 22 YP-17 ~-€7 RASIWAS-Utiiidor 14 YP-23 B-tPS brain MH-Utiudor 8 YP-3sA 6=PSl_ PEPS 57 YP-~$. 8,D Headworks-5un3p Pump... YP-bi7 ' 3-D UV-Adnir3 Building ~ ' YP_51 4-D {PLS-UV building 6 YP-52 4-!PS Admin B{dg-Utilidor Box 3 g TOTALS 4" Restraints: 29 8" Restraints 12' 12" Restraints 44 24" Restraints 21 30" Restraints - 33 System 3 Sheet # Pipe Descriptton Restraints YP-18 3-SSM RAS/WAS-Lift Station 12 YP-43 4-PSC Scum Pit-UFAT 24 YP~7 6-PSC Primary`Scum-~4„PSC 8 • From:'UNT.'PF~ PIPE 8 rTJFPLS Tos4062a883?8 406,'x488378 MsQ#462440.0.1 EOISE - UNITED PIPE 7000 w VICTQF2X P a BOX 9405 BoISa, ID 83709 • 1/27/09 Telephone: 208-997-8300 Bid 2D: 5240659 Pra j eat : B02EMAN WRF - 'YI~t.D - k?EV . ~ 3.3 DH I tezn Qty Na. Deacriptian - w To aYrr~'A~L Package Sub-total: * * SE - SECONDARY EFFLU3.sNT * - {:LARIFI73R 5&6 Ta UV BLDG Package Sixb -fatal - UV TO FUTURE • Package Sub-total: ** RAS - i2ETURN ACTIVATED SG - LIFT u~TATION #Z '1`O 4$" WXS Package Subtotal: x*********~**s*******~rtt**rt**:t ** SYSTEM 2 ** *******a~***~**tt*******~***** ** DEW - DLWATERING WASTE *'~ - LIFT STA ~2 TO PRIMARY EFF 504 02$121 12" CLSi T.? DUCTILE IRON PIPE - INCL; { 1) TAT GASKET PSR PIECE 2 028287 12" M.T DI ND 45-ELL 4 028271 12" MJ' DI ND 90-ELL ~2 x.72324 FO 140fl]}AI 12" REST W/ACC PAK 12" NOM PIPE 113.20 OD UFR1400-DA-12-I Unit pxiae UOM 91/27/2009 08:24 Fags 7 of 49 Page 6 Extended Price _00 .aa .DO .00 24.42 FT 12,307.68 129.78 EA, 259.56 16£1,36 EA 641.44 78.73 EA 944.76 Continued t~exL Page From~tli`ISTED PIPE « SUPPLY Tv:4063488375 406248S37S MsR#462440.0.1 BOISE - UNITED PIPE 7000 W VICTORY P O BOX 9405 BOISE, ID 83709 1/27/09 Telephone: 20$-997-8300 89.d ID: 5244659 PxOject: BOZEMAN WRF - YARD - REV.#3.3 DTi I tent QtY No. Descxiption 2 093927 8501 13.55X13.55 ROM SSBN CPLG 2 022808 #501B 12" ROMAC CENTER RING 4 022793 #541 12" ~L;ACK ROMAC END RING 4 022773 #501 13.55 ROI!1AC GASKET 16 065068 5/8X10-1/2 S$ ROMAC TRACK BOLT 2 078412 611-13.20 ROMAC FELL RESTRAINT Package Sub-total: ** D - DRAIN ** - HLATITNORICS C3TIPLEX SUMP PiIN1P 72 022519 8" CL51 TJ DUCTILE IRON PIPE -INCL : ( 1 ) TJ GASI{FsT PER PxBCE 2 043318 501 9.46x9.06 RoMAC CPLG ~vJ SI30PCpAT 304 SS BOLT & NUT $" NOM PIPE - 5" CNTR RNG LGTH 1 028269 8" M.7 DI ND 90-ELL 2 172322 FO 1400DAI 8" REST W/ ACC PAK 8" NOM PIPB ~ 9.05 OD UFR1400-DA-8-I 2 0413.73. 611- 9 .0 5 ROMAC BELL RESTRAINT' Package Sub-total: - SCUM PIT TO EX=STING 80 027183 4" CL51 TJ DUCTILB IRON PIPS -INCL: {1) TJ GASK'ET PER PIECE '~"' 1 028392 4" MJ•LONG DT ND SLEEVE 1 028267 4" MJ DI ND 90-ELL 4 028283 5!" MJ DI ND 45-ELL ~2 172320 FO 140UDAI 4" REST w/ ACC PAR 4" N'OM PIPE ( 4.80 on U'FR1400-DA-4-I Unit Price UOM 259.82 EA EA EP. EA E.A. 159.27 EA G1~27/2U0? 08:24 Pape 8 OY 40 Page 7 Extended Prase 519.64 318.54 14, 991._ 62 14.63 FT 1,053.36 142.78 EA 285.56 79.64 SA 79.64 40.23 EA 80.4G 95.54 EA 191.08 1,s9o.3.0 10.06 FT 804.80 31.29 EA 31.29 32.00 F.A 32.00 29,51 EA 118.04 23.82 EA 285.84 Continued Next Page from pNITED PIPE & SU~'PLY Tcs4062988378 4062488370 b1s4#462440.0,1 BOISE - U'NTfiED PIPE 7040 W VICTORY ~ a sox 9405 $OISE, ID 83709 • 1/27/09 Telephone: 208-947-8340 Bid ID: 5290659 Px'Uject: $OZLMAN WRF YARD - RBV.#3.3 DH Item QtY NtS. Description 2 056378 501-4.$1X4.81X5-SSk'E ROM CPLG 2 062047 611-4.80 ROMAC BELL RESTRAINT Package Sub-total: - BIaREACTORS 2&3 TO RAS/4PAS 252 D28121 12" CL51 TJ' DUCTILE IRON PIPE -INCL, ( 1 ) T~' GASKET PER. PIECE 2 428271 12" MJ DI ND 90-ELL 4 172324 FO 1~iD4DAI 12" REST W/ACC PAR 12" NON! PIPE } 13.20, OD UFR140D-DA-12-I 2 49:6966 541-13.55X13.558 X7" EPOXY CPL w/5s soz~rs ~ z~trrS ~Z 07812 611-13.20 ROMAC ~~L R$STRAYrrr package Sub-fatal: - RAS/~7A8 TO UTILIDOR 180 427183 4" CL 51 TJ DUCTILE I~2p~T PxPE -INCL: (1) T~ GASKET PER PIECE 3 028267 4" k1.}' DI ND 94-8LL 6 172324 FO 1444DA2 4" REST w/ ACC PAK 4" NOM PIPE 14.80 OD UFR14D4-DA-4-I 2 d5b37$ 541-4.81X4.81X5-BEEF ROM CPLG 2 D62Dd7 611-4.80 ROMAC $ELL 12ESTRAINT Package Sub-tQta1,: • W BLI3G - ADMIN 1613 090173 3" CL51 TJ DUCTILE IRON PIPE 1 028256 3" MJ DI ND 40 -ELL • 1$4D19 FO 1400DAU 3" REST w/ ACC PAK 3" N03J P I PS ~ 3. 9 6 OD unit Pxioe UOM 82.ea EA 38.87 EA 24.42 FT 16D.36 EA 78.73 8A. 236.92 EA 159.27 8A 01/27/2003 08:24 Paga y of 40 Page 8 Extendea Price 165.60 77.74 1,515.33 6,1.5 3.84 324.72 314.92 473.84 318.54 7,581.86 10.46 RT 1,81D.80 32.40 EA 36.40 23.82 EA 142.92 82.80 EA 165.60 38.87 RA 77.74 13.35 FAT 29.16 EA 22.64 FsA. 2,293.46 2,136.00 23.16 45.28 Continued Next Page ` b'so~Gt`UP72TED PIPE & SUPPLY Toa40b248837II 4062488378 Mffigi~9b2440.0.1 OZ/27I2009 06:24 Page 10 of 40 BOISE - UNITED PIPE ?000 AT VICTORY P O BOX 9405 BOISE, ID 83709 • i/27/0 9 Te3.ephane: 208. 947-8300 Bid YD: 5240659 Project: BOZ.EMAN WRF - YARD - REV.#3.3 DIi Page 9 Item Unit Extended QCy No. Description Price UOM Prise CAT #: UFR1400-DA-3-t7 2 0?9801 501 4.QOX4.00 ROMAC CPLG 69.85 HA 139.70 3" DIJSTD STL X SAME Package Sub-total: 2,350.14 - IPLS TO AV BLDG 40 027183 9" CL51 T3 DiTCTILF; zRON PIPE 10.46 BT 402.40 •INCL: (1) TJ GASi~T PER PIECB 2 0282$3 4" M~7 DI ND 45-ELL 29.51 LrA 59.02 4 172320 k'O 14DODAI 4" REST Pi/ ACC PAR 23.82 EA 45.28 9" NOM PIPE ~ 4.$0 QD IIFR1400-DA-4.2 2 056378 501-4.81X4.81X5-SSRE ROiM CPLG 82.80 EA 165.60 062007 611-4.80 ROMAC BELL RESTRAINT 38.87 EA 77.74 Package Sub-total: 800.04 - DIGESTER BLDG TO EXISTING 18 022614 8" CL51 TJ DUCTILE IRON PIPS 14.63 FT 263.34 -INCL: (1) TJ GASRST PER PIECE 20 027183 4" CL51 m~ DuCTIZ~E IRON PIPE 10.06 FT 201.20 -INCL : ( T ) T~1' C3ASKET PER PIECB 2 043318 501 9.06X4.06 ROMAC CPLG 142.78 EA 285.56 W/.SHOPCOAT 304 SS BOLT & NUT 8 " NOM PIPE - 5 " CNTR R[+1G LGTFi 2 0 41171 611- 9 .0 5 ROMAC BELL RL S'L'IZAINT 9 5. 5 4 F,A 191.0 8 2 056378 501-4.SiX4.BiX5-33FE ROM CPLG 82.$0 EA 265.60 2 062007 611-4.80 ROMA.C B33LL RESTRAINT 38. B7 F,A 77.74 Package Sula-total: 1,184.52 ~* DFM - DRAINAGE FORCE MA2N** • - PRIMARY EFF PUMP STATION Continued Next Page i~~rom:~3NITED FIPP & SUPPLY Taa40b2488378 QOfi248&378 Maq#452440.O,i BOISE - UNITED PT PE 7aDO w vz~TORY P 0 BOX 9405 BozsE, ID e37o9 • 1/27/Q9 Telephone: 208-947-8300 Bid Tb: 5240659 Project : BOZEMI4,N WiZF - XARI7 - REV . # 3. 3 DH Item Qty No. DeBCriptioxl 60 090173 3" CL51 TJ DUCTILE IRON PIPE 1 028266 3" N!J DI ND 90-ELL 2 380019 FO 1400DAU 3" REST W/ ACC PAK 3" r~o1v PIPE ~ 3.96 oD CAT #: UFR1406-DA.-3-u 2 0')9801 501 9.DO~C4.00 ROMAC CPZ,G 3" DZ/STD STL X SAME Package Sub-tota3: - DIGSSTETZ BLDG 60 011066 2" SCH 80 P/E PVC PIPE 1 011970 2" SXS SCH 80 PVC 90-ET,T.~ 011996 2" SxS SCH 80 PVC 45-ELL Package Sub-total: ** DOR - DIGESTER OVERFI,OAT ** - LTC3ESTBR TO UTxLTLtOR 35 022614 8" CL51 TJ DUCTILE IRON PIPE -2NCL: (1) TJ GASKET PER PIBCB 1 028269 8" MJ I3I ND 90-ELL 2 172322 Fo 1400i)AI 8" REST rT/ AcC PAK 8" NON! PIPE ~ 9.05 OD UFR14D0-DA-8-T 2 a44986 501 9.06X9.06X5-BSFE ROM CPLG 5S $OLTS/NU'T`S - FUSION EP}CX 2 0 41171 611.9 . D 5 T20NTAC SELL T2E STRAI N'I' Package Sub total: • ** IPFM - IN PLANT FORCE MN ** Unit Price IT{7M 13.35 FT 29.16 EA 22.64 EA 69.85 EA 94.63 C 2.36 EA 5.57 EA 01/27/2009 08s24 Paga 11 of 40 Page 10 Extended Price 801.00 29.16 45.28 ].39.70 1,015.14 56.78 2.36 5.57 64.71 14.63 FT 526.6$ 79.64 EA 79,64 40.23 EA 80.46 143. D1 8A. 286.02 95.54 EA. 191.08 1,1fi3.88 Continued 1Vext Page ' r'iom:'UNi1'~A PiFE & SUPPLY Toe405;~488378 4063488378 MsQ#462440.0.1 $OISE - TJN.~TED PIFE 7000 W VICTORY P O BOX 9905 BOISE?, SD 83709 • 1/27/09 Telephone: 208-947-8300 Bid ID: 5240659 Pro j e~ct : E30 ZEMA.N WRF - YAF2D - R.EBV . # 3.3 DH Item Qty No. Description - HF.ADwORxs TO UPAT 240 027163 4" CL51 TJ DUCTILE IRON PIPE • INC2 : { 1) T~' Gi+,sKET PBR p~$C~ 2 028267 4" iv1.7' DI ND 90-ELI, 1 026283 4" M.T DI ND 45-ELL 6 172320 FO 1~IOODAS 4" REST W/ ACC PAR 4" NOM PIPE ~ 4.80 OD UFR1Q00•DA-4-I 2 025946.8501 (4.81X 4.81) ROMAC CPLG IC2T : STD STL/D.I . X ( SAMF' ) 2 022600 #501 4" ROMAC CENTER RING 9 022780 #501/FCX 4" RED ItOMAC END R2NG 022743 #501 4.81 ROI~fAC CASKET 022777 5/$X$ ROMAC TRAC~C BOLT WJNUT 2 062007 611-4.84 Ro12AC 88LL RESTRAINT Package Sub-tQta1: ** IPS - IN PLANT SEWER ** - DRAIN TO ZITILII1pR 36 022514 8" CL 51 TJ DUCTILE IRON PIPE -INCL; {i) TJ GASKET PER PIECE 1 D28285 8" M.T DI ND 45 -BF,L 2 172322 FO 1~l0pDAI 8" REST W/ ACC PAK 8" NOM I' I P E ~ 9.05 OD UFR14D0-DA-$-I 2 044986 501 9.D6~C9.06X5•sSFE ROM CPLG SS AOLTS/NUTS - FIISION EPX1' 2 041171 611-9.05 ROMAC BELL RESTRAINT Package Sub-total: • - ADA2IN BLDG TO UTILIDOR BOX Unit Pxice UOM 10.06 FT 32.D0 EA 29.51 EA 23.92 EA 86.82 EA SA, F.A 33A EA 38.87 RA Ol127f2U09 0:34 Page 12 of 40 Page 11 Extended Pride 2,414.40 54.00 29.51 142.92 173.64 7'7.74 2,902,21 14.63 FT 526.68 68.96 SA. 68.98 40.23 EA $0.46 143.41 EA 286.02 95.54 EA 191.08 1,153.22 Contznueci Next Page i~ronsillJITED PIPE & SUPPLY To,40S2488378 4062988378 Msq#463440.0,1 O1/27/Z009 08:x4 Page 13 Of 40 BOISE - UNITED PIPE 7000 w VICTORY P O BOAC 9405 sorSE, ID $3709 • 1/27/0<3 Telephone: 208-947-8300 13id ID: 5240659 Project: BOZEMAN v7RF - YARD - tzE'v.#3.3 DH Page 12 Item UI13, t Extended Qty 1Qo. Description Price UOM Pride 120 027183 4" CL 51 TJ DUC'1~YLE IRON PIPE 1{3.06 FT 1, 207.20 • I1VCI,: ( 1) TJ" GASKET PER PIECI? 2 028267 4" r~J DI r3D 9a -ELL 32.OO EA 64. o0 4 372320 Fo 1400DAI 4" REST Pi/ ACC PAFC 23.82 JrA 95.28 4" NOM PIPE a 4.80 OD UFR1400-DA-4-I 2 057337 501-4.81X4.$1 Ror~,C COUPLING 82.80 EA 165.60 2 062007 611-4.$0 ROMAC SELL RESTRAINT' 3$.$7 EA ?7.74 Package Sub-total: 1,609.82 ~* ML - NlIXBD LIQUOR ** • 33I032EACTpR 1 TO 2~3 162 120348 36" CL51 TS DUC'E`ILE IRON PIPE 159.32 3"T 25,849.84 1 120909 3b" Ms DI TES 6,369.42 EA 6,369.42 2 000000 3b" M~7 DI ND 90-ELL 4,061.51 EA 8,123.02 I 000000 3b" M,~7 PLUG VALVE 35,164.84 SA 35,154.84 1 183567 SDsW$R CI VALVE SOX LID ONLY' 12.19 EA 12.14 1 172469 855fl 26" VALVE BOX TOP-DC7M 57.00 8A 57.00 1 172470 8564 36" VALVE BOX SASE-DOPE 59.00 EA 59.00 9 180017 FO 1400AA2 36" REST W! ACC PAK 922.14 EA 8,299,26 36" NOM PIPE ~ 38.30 OD CAT #: UFR1400-DA-36-I 4 0000(30 400-36"-1A-FE ROMAC CPLG 1,042.18 33A 4,168.72 4 000000 30 1Q50 BELL RESTRAINT 36" 1,087.16 EA 4,348.64 Package Sub total: 82,411.88 - BI012EACTORS 2&3 TO SPLITTER 90 000000 42" CL51 TJ DUCTILE.. IRC1N PIPE 222.62 FT 2(3x03.5.80 000000 42" M,.7 DT ND 90-ELL 7,283.91 EA 7,283.91 1 000004 42" MO' DI ND 90-ELL 7,283.91 EA 7,283.91 Continued Next Page From~UNTTED PIPE ~ SLFPPLY 'Po:4062488378 4062488378 Msq#46440.0.1 of/a'1/2009 06:24 Page 14 of 40 BOISE - UNITED PIPE 7000 w vICTORY P O BOX 9405 BoIS~s, ID 83709 • 1/27; 09 Telephone: 208-947-8300 Bid ID: 52405.59 Pro j ec't : BO~EMAN WRF - YARD - RSV . # 3 _ 3 T~Ii Page 13 Item Unit Extended Qty No.. Deacription Price UOM Price 4 000000 FO 1400 JOI23T 1ESTRAINT 1,823.53 EA 7,294.12 4 000000 400-42"-lA-FB RQMAC CPLG 6,496.15 EA 25,984.60 Package Sub-total: - SPLITTER TO P}iOREACTOR Y 126 120348 1 088406 2 113379 6 180017 .4 000000 4 000000 36" CL51 TJ DUCTII,I~ IRON PIPS 36" MJ 45-ELL 36" NliT DI 22 -SLL FD 1400DAI 36" R2~ST W/ ACC PAK 36" NOM PIPE 138.30 DD CAT #: UFR1400-k7A-36-I 400-36"-1A-FE R4MAC CPT.C7 ]PO 7454 BE7~L RESTRAINT 36" 159.32 PT 3, 695.00 E;A 3,174.76 EA 922.19 8A 1,042.18 ~, 1,087.16 EA Package Sub-total: - SEC CLARI FIPSR 'L'O EXISTING 558 D46924 24" CL51 TJ DUCTIL$ IROt+T PIPE 6 159046 24" MJ BI Nb 22-ELL 2 036470 24" MJ TSI ND 45•ELL 4 036469 24" MJ DI 3dB 9D-ELL 24 1800]:4 F4 140flDAI 24" REST W/ ACC PAK 24" NOM PIPE 125.80 OD CAT #: UFR1400-DA.•24-I 16 094746 400-25.$0-lA-FE ROMAC CPLG FUSION SP3CY 16 000000 FO 3,450 BELL RESTRAINT 24" Package Sub-total: - SBC CLARIFIER TO CAP(X2} • ' 179091 30" CL51 T..T DUCTILE ZRQN PIPE 2 169058 30" MJ DI ND 90-EI,L 59.27 EA 1,088.36 8A 1, 044.27 I3A 1,400.53 FA 276.34 Eli 20,074.32 3.696.00 6,349.52 5,532,84 4,16$.72 4,348.64 67,882.34 44,170.04 33,072.65 6,530.16 2,088.54 5,602.12 6,632.15 849.34 EA 13,589.44 404.82 EA 6,477.12 73,992.2D 83.07 FT 52,334.10 4,Oc1.51 EA 8,123.02 Continued Next Page " Frdm:~NITED WIPE S. SUPPLY To:40fi248837$ 4062488378 Msg#462440.0.1 07.J27J2009 48:24 Pegs 15 oL 40 BOISE - III~TZTET.3 PIPE ?ooo W vxCTORY P o.BOx 94x5 BoxSB, In 83?09 • 1/27JD9 Telephone: 208-947.8300 Bid ID: 5240659 Pxoject: BOZEMAN YFRF - YAt2T} - E28V.#3.3 I)H Page 14 Item unit Extended Qty NO. Description k'rice UOR`I Price 2 D898A7 30" MJ DI 45-ELL 3,696.00 EA 7,392.00 2 055421 30" 14.7' DI CAP 488.80 EA 1, 977.6D 10 180015 Fq 1400DAi 30" REST W/ ACC PAK 708.54 EA 7,085.40 ~ 30" NOM PIPg ~ 32.00 OD C,A.T #: UFR1400•I3A-30-I 4 000000 400-30"-1A-FE KOMAC CPLG 953.27 EA 3,813.08 4 D00000 1950 DI 30" BELL RESTRAINT 833.06 EA 3,332.24 Package Sub-total: 64,057.44 - SBC CLARIFIER TO SC #5 180 ].79091 30" CLbI TJ 17UCTILE IRON PIPE 83.07 FT 14,952.50 169068 30" n+1J 7DT I~7D 90-EI.L 4,Ob1.51 liA 8,123.02 089847 30" MJ DT 45-ELL 3,b96.00 EA 3,696.00 5 3,80015 FO 1404DAI 30" REST W/ ACC PA1{ 708.54 EA 4,251.24 30" NOM PIPE j 32.00 QD CAT ##: UFRZ400-DA-30-I 4 aooooo 4oa-3o"-1A-873 Ro1~c cpr,G 802.93 ~ 3,211.72 4 000000 1454 D1 34" 88L,L RESTRAINT 833.06 EA 3,332.2~k Package Stxb-CpC8,1: 3?, 566.82 - SEC CLARIFIER TO SC #{'6 306 179091 30" CI.51 TJ Dt7CTILE IRON PIPE 83.07 PT 25,419.42 2 089847 30" MJ DI 45-]3LL 3,696.00 EA 7,392.00 4 18DD15 FO 1400DAI 30" REST W/ ACC PAR 708.54 EA 2,834.16 30" NOM PIPE - 32.00 OA K CAT #: UPR1400-AA-30-= 4 ODOODD 400-30"-iA-FE ROMAC CPLG 802.93 EA 3,211.72 4 ODOD00 1454 DI 3D" BELL RESTRAIIJTAL* 833.06 EA 3,332:24 Package Sub-total: 42,189.54 • Continued Next Page From:UNITID PIPE & SUPPLY Toa4063988378 4062488378 Msq#962440.0.1 O1/Z7/2009 0824 Pace 16 of 40 - BOISE - UNITED PIPE 7000 w VICTORY P O BOX 9405 sozSB, za 83709 1/27/09 Telephone: 208-947.8300 Bic3 ID: 5240659 Project: 80ZEMAN WRF - YARD - R$V.$)3.3 DH Page 15 Item Unit Extended Qty No, Description Price UOM. PxiOE; ** R2~iS - R$TURN ACTIVATED SG - RAS /WAS # 2 TO P'CTT[7RB ( ?C2 ) 594 492128 16" CL51 TJ DUCTILE IRON PIPE 35.64 FT 21,170.15 INCLUDES ( 1) TJ GASKET 1 028272 16" MJ DI ND 90•ELL 417.42 EA 417.42 2 028288 16" MJ DI ND 45-ELL 315.02 EA 630.04 2 D34016 16" MJ DI ND CAP 203.02 EA 406.04 8 180009 FO 1400DAI 16" REST W/ ACC PAK 140.89 EA 1,127.12 16" N017[ PIPE ~ 17.40 OD CAT #: UFR14D6•AA-16-I 4 OD00D0 400 -17.40°lA-FE ROMAC CPLG 309.19 EA 1,236.76 ~! 000000 145 0 DS 16" BELL RESTRAINT 191.49 SA 765.96 • Package Sub-total: 25,753.50 - RASIWAS #2 TO CLARIFIER #5 162 04212$ 1b" CL51 TJ DUCTILE IRON PIPE 35.64 FT 5,773.68 INCLUDES (1) TJ GASKET 3 028288 16" MJ DI I~TL3 45 - SLL 315.02 EA 345.06 6 180003 FO 1400D.AI 16" REST W/ ACC PAIL 14D.89 EA 845.34 15" NOM PIPE ~ 17.40 017 .. ~ , CAT #: UFR1400-DA-16-I 4 0D0000 400 -17.40-IA-FE ROMAC CPLG I,* 309.19 EA 1,236.76 4 000000 145 0 DI 16" BBLL RESTRAINT 191.49 EA 765.96 Package Sub-Gotal: 9,566.$0 - RAS/WAS #2 TO CLARIFIER #6 270 D92128 16" CL51 TJ DUCTILE IRAN PIPE 35.54 FT 9,622.84 INCLUDES ( 1 } TJ GASKET 1 028272 Ib" MJ IJI ND 90-F.LL 417.42 EA 417.42 2 028288 16" MJ III Ni3 45-SLL 315.02 EA 630.04 • 180009 FO 1400T3AT 16" REST W/ ACC PAK 140.89 EA 845.34 16" NONi PIPE ~ 17.40 OD Cantinuefl Next Page From~UNITED PTP~ & SUPPLY To~406248837A 4002488378 M9q#462440.0,1 01/27/2009 46:24 Page 17 a£ d0 BOISE - UNITED PIPE 7000 W V2C'I'C7RY P O BOX 9405 BOISE, ID 83749 • I/27J09 Telephone: 208-947.8300 Bid YD: 5290659 Pro jest : BOZEMAN WRF - YARD - REV . x#3.3 DIi Page 16 Item Unit Extended Qty LVa. Deacxiption Price UOM Price CAT ~: UPR1400-DA~16-I 4 000000 4b0-17.40-1A-as ROMliC CPLG 309.19 EA 1,236.76 4 0000170 1450 DI 16" BELL RESTRAINT 191.49 EA 765.96 Package Sub-total: * * PE - PRIMARY EFFI.i7L1~T * * * * FROM PU1~1P S TATI OI+7 TO BIO * * *'" RBAGTOR 2 S~ 3 INFLUENT ** ** SPLITTER B4X ** - PRIMARY EFF PUMP TO TEE 234 046924 24" CL51 TJ DUCTILE IRON' PIPE . 03647[) 24" Mil DI ND 45-SLL 1 036469 24" MJ DI ND 9D-ELL 1 OOOOQO 36X24" MJ SEB REDUCER 7 1$0014 PO 14DODAI 24" T217ST W/ ACC .PAR 24" NOM FTFL' ~ 25,$0 OD CAT #: UF'R1400-DA-24-I 2 094746 400-25.80-1A-F8 RO~JAC CPLG PU$ION I~PXY 2 000000 1450 DI 24" BELL RESTRAINT Package Sub-total: - PRIMARY EFF TO BNb1 ~2&3 54 179091. 2 089847 4 18(7015 4 OOII000 9 000000 30" CL51 TJ DUCTILE I720N PIPE 30" MJ DI 45-ELL FO 7.40DDAI 30" REST W/ ACC PAK 30" NC)I~t PIPE ~ 32.00 OD CAT #: IIFR74Q0-DA-30-I 400-30"-1A-F3? ROMAC CPLG 3.450 DI 30" BELL RESTRAIb1T Package Sub-total: 59.27 F.A 1,044.27 EA 1,400.53 Ba 2,387.20 EA. 276.34 EA. 13,518.32 13,$69.18 2,088.54 1,400.53 2,387.20 1,934.38 849.34 8A 1,698.68 404.82 EA 8b9.64 24, 188.15 83.07 FT 4,485.78 3,696.00 LA 7,392.00 708.54 EA 2,834.16 953.27 EA 3,813.08 833.05 EA 3,332.24 21,857.26 Continued Next Page ~?rpm:UNITED PIPP & SOPPLY To:40b2488378 4063488376 Msq#462440.q.1 - BOISE - UNITED PIPE 7000 W VICTORY P o sox 9405 sozsE, ID 83709 1/27/09 Telephane: 208-947-830D sid zD: 5240659 Project: BaZEPSAN WRF ~ YARD - RE9.#3.3 DH Item Qty 1Vo. Descriptifln • P$IMARY EFF TO CAP 90 179091 30" CL51 T.I DUCTILE T120N PIPE 1 169068 30" M.T DI ND 90-ELL 1 055421 30°f D7.3 DT CAP 3 180015 FO 1400DAI 3D" REST Wj ACC PAK 30" NOM PIPi? ( 32.00 OD CAT #: U~'R1400-DA-30-I 2 000000 400-30"-1A-FE i20MAC CPLG 2 OOOOOD 1450 AI 30" B73LL 3t8S'Z'RAINT Package Sub-total: kitkkkk**kk****kkk*~t***k**Yt*kkik ** SYSTEM 3 ** *************rrk+Fk**k+R*****kk~Y* ** DSL - DxGESTED SLUDGS ** - UTILIDOR TO DIGESTER 40 022633 PIPE PVC AWWA 0900-07 CL235 4" UL C'L 15 Q DR1$ 1 028283 4" MJ DS ND 45-ELL 2 172494 FO 1500AM~TI 4" SNT RESfi W/AGCY PAR ~ CAT #: LTFR1500-4AM-I 4" NOM PIPE ~ 4.50-4.80 OD 2 055378 501-4.81X4.81X5-SSFE ROM CPLG 4 062007 611-4.80 FtOMAC BELL RESTRAINT Unit Price, UOM 83.x7 FT 4,051.51 EA 988.80 HA 708.54 EPs 802.93 EA 833,06 $A 01/27/3004 08:24 Page 16 of 40 Page 17 Extended Fx'zce 7,476.30 4,061.51 988.80 2,125.52 1,G05.86 1, 66 6.12 17,924.21 194.64 C 77.86 29.51 EA 29.51 27.77 EA 55.54 82.80 EA 165.60 38.87 EA 155.48 Facka.ge Sub total - AidAEROBrC TO DIGESTER 022634 PIPE PVC AWWA 0900-D7 CL235 6" 384.54 C UL CL150 DR1$ 483.99 23D.72 Continued Next Page ~~ • •"Y 1VIORRISON CHANGE PROPOSAL REQUEST ,,a,,~;~MAIERLE,IrrC, (Not a Change Order) Project: Bozeman WRF Phase 1 Improvements CPR No.: 005 CPR Date: 3/25/2009 Date Sent to Contractor: 3/25/2009 Date Recd from Contractor: TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Route 24 ML from the northeast corner of the Secondary Clarifier Split Structure from the east wall rather than the north wall. See the attached sketches for clarification. HDR/MMI ~~~` ~`""~'~~~ Date: 3/25/2009 • TO: HDR Engineering, Inc. /Morrison Maierle, Inc. Proposal Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor _ Date TO: Accepted/Not Accepted Accepted/Not Accepted HDR/MMI: Date Owner: Date r1 LJ r1 L_J • From Sheet OOOOC03c: ,z •#~~i a ? -} $ t iii *. ~t:s 1. s~ ~. _ j .. .t' .ay 3 ~5`r 7 5447-`Ofi ~ .... - ;€ ~r r~ €~ ~r From Sheet 0311 S01 c: o ~-e~ ~s-e• r-e• a r-e• s'-u• e• z•-s , ra• s-c• ra. e~~~ r~ i ~ ' • ~ o J ~~PLt FLmI:. • • • z~-an - ,L _ xI. ~ M '® 1/3-LM~ Nx LY:CG T!V Cf '] c ~ ~ s~~r Y-Y KX = s,-JL ~-. r ~---i • ~ - -.L , • _ ~ ~ € 1 rrL cacwwu*~ ~ i i ~rw;-0x rli ~~ i . Tom" '. •.\ - a, s~.a ii ii '~ i. ii ii ii i~ i i i i ` ~` ~ :. ~ - ~ I i I I ~~ ~; ' ' cxrsivn-~ © . t T w ~ ~ ~ , , ~l ~ < • CONSTRUCTION DOCUMENTATION FORM No. 005 n ~~ • HDR ENGINEERING, INC. Project: Bozeman WRF Date: 4-8-09 Description: CPR-005 Delete 1-24" MJ 90° and 2- MJ 45~ s Material Installation Mark-upJBA'~ 7 0 t °~U Response: 3,489.00 864.00 S~ is ~~ 6 ~~658 ~~ Cost Credit Schedule Change Days Contractor HDR -~ ~ - • Ciiy Date 4-8-09 Date: //B~a'~ Date: !FramrUk3ITED PIPE & SUPFLY To:4062488378 40&2488378 Mggpt462440.0.1 01(Z7/x009 OSr24 Ps4~ 14 of 80 BGIISB - t1IQIT}'5D P2 PB .70:00 W VICTORY 'P :O BOX 94`05 BO~`88~ ITJ 837Q9 • 1/Z?+t0:9 T'c~iephonc: 208.94'7-830:4 sd Zn: 52406'5'9 Prc~ ject : BOZBt+~IN ~:F - YARE) - RBY.#3 .'3 T)FI Page' 13 Itez:l ~ IIn.t 85cGeuc~ed (qty No. I~+ascript3.cua = Prue U~ Pxic~ 4 DQ0000 Fo i4(30 ~OUaer AR€Prt~T 1, 82':3. s3 E1- 7,29~t.12 ,Q ODbD~O 400+4:~"•1A'FFi''80M1~tC CPL+U 8,4~6..4.a5 ~Hlk. 25,984.fi0 PnG.a~s 3xib-total:' 67,'882.34 - 3PLITTSR ".C(? SI~+GTOR I i'26 120348 3.6" CL51 T1 DUCTSLS IRON P=BS 159.32 FT' 2O, a7A. 32 1 086406 36" M.T 45-SLL 3,6.9.6,04 EA 3,696.04 2 113379 36" MJ DI 22-ELL 3;174,.76 88 x,349.52' 6 `280D17 Fq 140OW1I 36" R$3T w/ hCC P1uc 92.2.14 SA 5, 532.$ 3'S" NUM PIPH 38.3D OD CAT ~ t7F814`D~-DL-36=I 4 0000&0 400-36"-1A-Fx ROMAC CPLG 1,042.:1.8 ]SL 4,169.72 • ~ 040000 Fo 145Q a~LL g8s~~rr 36" 1, 087.1$ EGA. 4, 3;48.64 Ptrek+sSTe Sub - total : ' 44 ,17 0.0 4 - $SC fiS:FI$S!. ' TE3 SXI$T3lAG 5~a8 045924 2~'" CI.51 TJ DtTCTILH IRON FIPS 89.27 P!A 33,172.66 6 169046 24" l~LJ DI N13 a2-8LL 7.~08.8..36..RA 6, 53:13.x.6 2 036470 24" MJ DI-DID Q5-SLL 1,x4+1.27 F.~1. ~,4~$•54' Q' Q36A59 ~4" MJ' DI rID' 90-Ei.I, 1,400.53 RA: 5,.6fl2.i2: 2Q 18D014 PO 140IIDAI 24" R'SE+`2' '~/ ;ACC E3~R 276.34 EA 6, 63.2.16 $:4" NOM PI E'$ ( 2'5.80 O~ caz' ~: IIFbt14p0-DA-24-z 16 094746 400 -25.80 - lll• BS R:OLb31C OPLG 849..34 SA 13, 589 . d4 `1*'G$24N '75P2~Y' 16 000~l00 FO 14'5!0 S~ 8E8TR1'~T'~'E' $4" 4Q4.82 'BA 6,477..12 Pa~a~e Sub-taCa7: 73992.xQ - 88~C CLASI FIER Ra GAL' (X'2 •694 179091 `30" CL51 T3 D[T~TILS IE~ON PIPS 83.07 F'F 52, 334.10 2 159:068 3'0'+ MJ 17tT ND 90-SLL A,06Y.5I R8. $,123.Oz Ccntiaued `Next -PaSfe, • Change Proposal Request Documentation CPR 006 • n • ~~~MORRiSON CHANGE PROPOSAL REQUEST ~'~ {Not a Change Order) ~~ MAiERI~E, i~uc Project: Bozeman WRF Phase 1 Improvements CPR No.: 006 CPR bate: 4/16/2009 Date Sent to Contractor: 4/1612005 Da#e Recd from Contractor: C, • TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): anaes to fencing access drives and fire hydr~nt location to accommodate Owner's needs. Sip two attached drawings. TO: HDR Engineering, Inc. !Morrison Maiede, Inc. Proposal: Date: 4!16!2009 (A time extension is irk forth' modification unless otherwise detailed and justffiedp) C~ Contract / ~~ gate S ~ 1 '"~ Cost ~ ~ ~~ ~ Credit TO: Accepted/Nat Accepted AcceptedlNot Accepted HDRIMMI: Date Owner: Date Response: See attached sheet. The additional fence for the gate as recommended by the fence subcontractor has been added to the quantities. Modifications are recommended to the mark-up applications for portions of the work. Addition errors have been corrected which increases the cost of the work. Recommend a cost of $18,813.11. Recommended by HDR/MM ~ 6 /~~ /6 Add Price Number Unit Total Re-Survey 65.00 S hr 380.00 Fencing 14.15 71 ft 1,004.65 End Post 87.50 1 ea 87.50 Gorners 106.25 2 ea 212.50 Gate Posts 206.25 4 ea 825.00 Braces 156.25 10 ea 1,562.50 Post Holes 156.25 14 ea 2,187.50 20' Gates 1,050.00 2 ea 2,100.00 Strang Arm Latches 50.00 2 ea 100.00 Add 5' to Cantelever Gate 125.00 5 ea 625.00 Excavation for asphalt 4.50 424 yd 1,808A0 Geo#ex 0.25 4767 sgft 1,181.75 Sub-base Gravel 11.76 244 ea 2,867.00 Base Gravel 16.25 106 yd 1,722.50 Asphalt Unit Price Curb and Gutter 20.00 15 ft 300.00 Mark-up 17% 2,523.35 2,323.35 Deduct Fence -14.15 55 ft -778.25 Delete excavation of hydrant -3.50 20 yd -70.00 Delete bac#cfill and bedding -4.75 20 yd -95.00 • No deduct for pipe-less that 20' 0.00 0 ft 0.00 Mark-Up 7°10 -11.55 1 LS -11.55 17,o57.so n U CPS #ao6 Deletion: SS' X $14.15 = ($778.25) Addition: 71'X$14.15=$1004.65 t -End Post X $87.50 = $87.50 _ 2 ~ Garners X $ 106.25 = $212.50 4 - 4" Gate Posts X $20b.25 = $82S.Ot) l0 - Braces X $156.25 = $ l 562.50 i4 - Holes X $156.25 = $2i87.S0 2 - 20' DD Gates X $1050.00 = $2100.00 2 -Strong Arm Latches X $50 = $100.00 Making 20' Cantilever gate in to a 25' Cantilever .('late - 5 X $I 25 = $625.OU TQTAL: $8704.65 Total Addition for CPR #006 is S79Z6.40 Note: Fora 25' Cantilever Gate the frame itself is going to be 37.5' long. You need to have at least this amount of fencing along the path the gate travels so the gate frame stays protected by the fence during opening and closing of the gate. It looks tome that you • will need to add 10' of fencing accomplish this. This would add 10' X $14.15 = $141.54 and 1 - H ole X $156.25 = $156.25 for a total of $141.50 + $15b.2S =$297.75. • CPR 006 • MM106/16/09 Additional Subcontractor Work Total from Fence Sheet $ 8,704.65 Fence Contractors Addition $ 297.75 (We concur with the recommendation) Subtotal $ 9,002.40 Mark-up (7.01%) $ 631.07 Subtotal $ 9,633.47 Additional Contractor Work Total from WBC Sheet $ 7,989.25 Subtotal $ 7,989.25 Mark-up (17.11%) $ 1,366.96 Subtotal $ 9,356.21 Credit Items Total from WBC Sheet $ 943.25 Remove 55 feet of fence $ (778.25) (Included in subcontractor item) Subtotal $ 165.00 • Mark-up (7.01%) $ 11.57 Subtotal $ 176.57 Grand Total $ 18,813.11 Asphalt at unit price .- • ''°(~MORR~SOIV CHANGE PROPOSAL RE4UEST '~i.~ MAIEW.E,Inc. (Not a Change Order) Project: Bozeman WRF Phase 1 Improvements CPR No.: 010 CPR Date: _ 0';12_. 6/20Q9 Date Sent to Contractor: 05/26/200, Date Reed tram Contractor; • TO: Williams Brother Construction Please #urnish your proposal far execui#ng the fof#owing c#:ange(s): In litiht of the information provided in the recent blower submittai the followings chanties need to bg rnade• #ncrease Size of breaker for 300-BLR-01 to 45,Q,A Increase f eg der cabling and conduit #or 300-BLR 01 to (2) f~,11 ishieldgd VFD cable) Incre se size of breaker for 30 -BLR-03 to 450 A Increase feeder cabling and conduit fQr 300-t3~;R-03 to (2} P,1 # lshielded VFD cable) lncrsase size of breaker for 300-BLR-02 to 450 A increase feeder cabiino and conduit #or 300-BLR-02 #o {21 P11 {shiglded VFD cable} As each blower requires one auxiliary Dower source use {1) 20A SPACE breaker on Sus A to supRlypower iQ the req~ii-red auxiliary inguis of 360-BLR-01 and 300 E„ 03 usino f11 P1 for each feed As each blower requires one auxiliary Hower sourgg use L?.) 20A SPARE brQ~ker on Bus B to sug}oly power to the required auxiliarv inputs of 800-BLR-02 and 300-E-04 u5ina (11 Pi for each feed These changes acre shown in rQd on the mirk-uo for drawing ~00E03 Network the 'snstalled blowers to the Mastgr Control Unit (MCUI as shown in red in the mar#c-up for drayvinu 300E05. Network the MCU to 300-t Gp-01 as shown Delete the hargiwirg connectian~,{,f4 and C121 tween 3~( LCP-01 and each of the following blowers: 300-BLR-01 300-BLR-02 300-BLR-¢,~ and 300-BLR-04 The additions are shown in rer~. and the defetign~ are shown in rg een on the attached mark-up 300E05 Changes are also shown on drawing 300E02. HDRIMMI 'J'~"~` T'~""~- Date: 05/26/2009 Ta; HDR Engineering, Inc. /Morrison Maierle, lnc. • • proposal: Cost__ ~~~°~p,~.~~ Credit {A time extension is no d for this modification unless otherwise detailed and ju//sti~ied:) [~ Contractor pate C~ >>'~ ~ J TO: AcceptedlNot Accepted Accepted/Not Aa:epted HDRfMMI: Date Owner: Date Response: Tax is included both on the subcontractor and contractor mark ups. Per discussion with Barry Curtis tax is to be removed from WBC mark up. WBC mark up reduced from 7.01% to 5.95% and total price reduced from $15,283.23 to $15,131.84. Recommended by HDR/M ~ ~ d Cf • CONSTRUCTION DOCUMENTATION FORM No. 011 • HDR ENGINEERING, INC. Project: Bozeman WRF Date: 4-8-09 Description: CPR-010 Mountain States Electric (Attached) 14,282.06 Mark-up 7.01% 1,001.17 • Response: Cost $15,283.23.00 Credit Schedule Change Contractor ,~ ~,rul~io Date 6-19-09 HDR Date: City Date: i • ~UNTAIN STATES Chanae Order Proposal fl CCT111<AC <a NTII AC704l, INC. To: WILLIAMS BROTHERS Job #: 09-005 PR # 10 Job Name: Attention: BARRY CURTIS Work To Be Done: Change Request No: Cl0 #1 Date Of Proposal: 6/1 WRF PHASE 1 IMPROVEMENTS PROPOSED COSTS ASSOCIATED WITH CPR #010. SEE ATTACHED LABOR AND MATERIAL BREAKDOWN REGARDING DEDUCTS AND ADDS FOR PROPOSED WORK. SEE ATTACHED WESCO QUOTE, INCLUDING CUTLER HAMMER DRAWINGS. r: Submitted By: Terry Rizzuto Date: • Approved By: Date: Title Project Manager/Estimator (Labor Hours: Supervision Hours: (Labor Burden -included Travel Time 81 Subsistance: Small Tools as a % of Labor: Material & Supplies: Tools & Equipment Rentals: Estimation, Manager review & Admin Costs: Additional Safety Costs: Additional Milage, Transportation Costs: Cleanup & Handling Costs: Consumables; Warranty: Estimated Job DisruptionlDelay Costs: Other Misc.: This change requires a time extension of: days. Pricing void/subject to revision after The costs represented in this Change Proposal include only those costs which can be identified at this time. Na impact or delay costs are included. Should it be determined that the project is impacted at a later date by multiple changes, delays, or other causes beyond our control, we will submit these at that time. Hrs: Rate: 10% OF DIRECT LABOR ~_ Total Labor Dollars: $ {570. Hrs x Rate $ - 0.00% % Of Labor $ (570.77) $ - $ 9, 799.00 $ - $ - 0.00% % Of Labor $ (570.77) $ - $ - $ - WESCO QUOTE $ 2,960.00 $ - $ - Total Other Costs: $ 12,759.00 Total Estimated Direct Costs: $ 12,188.23 MARKUP 15.00% $ 1,828.23 $ - Subtotal: $ 14,016.47 BOND 0.90% $ 125.45 GROSS RECIEPTS 1.00% $ 140.16 Totat Proposed Change Order price: $ 1 6/19/2009 Mountain States Electric * * BID TAKE -OFF DETAILS -- FORMAT 2 * * * * Job: BOZEMAN CHANGE ORDERS' `Job Number: 7587 * * Bid Date: 8/212009 *'' Page 1 Date 6/2/2009 4:27:03 PM Assembly Material Material Labor Labor IcVtt-D7DDEDDCT IBLOWERBLDG I<NoName> ~<NoName> ~<NoName> ~<NoName> ~ 00500 Miscellaneous Items 0.00 #2 THHN CU STR -400.00 0.805 -321.92 0.019 -7.76 350 MCM WIRE TERM LABOR -18.00 0.630 -11.34 #2 - #1 WIRE TERM LABOR -18.00 0.336 -fi.04 3-1/2" KO FIELD CUT -6.00 0.61D -3.66 1" GRC 90-FIELD BEND LABOR -12.00 0.281 -3.38 1" LOCKNUT -16.00 0.221 -3.54 O.Oli -0.16 1" PLASTIC BUSHING -8.00 0.289 -2.27 0.071 -0.57 1" UNZSTRUT STRAPS -22.00 1.038 -22.89 0.092 -0.92 16 TSP -1000.00 0.200 -100.00 D.007 -7.00 00501 350 MCM SHLD VFD CABLE -900.00 27.050 -10820.00 0.030 -12.00 00509 WIRE TAG -128.00 0.750 -96.00 0.100 -12.80 00509 WIRE TAG -24.00 0.750 -18.00 0.100 -2.40 09002 1" GRC -220.OD 1.737 -382.25 0.123 -27.08 09009 1-1/2" GRC -220.00 2.905 -639.21 0.157 -39.58 1-1/2" GRC 90-FIELD BEND LABOR -12.00 0.770 -9.24 1-1/2" LOCKNUT -16.00 0.912 -6.59 0.017 -0.27 1-1/2" PLASTIC BUSHING -8.00 0.553 -9.42 0.101 -0.81 1-1/2" UNZSTRUT STRAPS -22.00 1.959 -31.98 0.056 -1.29 #14 THHN CU STR -3600.00 0.069 -250.20 0.009 -32.40 #14-12-10 WIRE TERM LABOR -24.00 0.189 -9.55 09006 3-I/2" GRC -120.00 9.585 -1150.14 0.281 -33.77 3-1/2" GRC 90-FIELD BEND LABOR -12.00 1.398 -16.77 3-1/2" UNISTRIIT STRAPS -12.00 2.651 -31.82 0.085 -1.02 3-1/2" LOCKNUT -12.00 3.697 -44.37 0.039 -0.47 3-1/2" PLASTIC BUSHING -6.00 3.495. -20.67 0.359 -2.13 5918 CUT, REAM, THREAD 3-1/2" RIG -6.00 1.225 -7.35 Totals -13,946.23 -239.73 CPR-O10 ADDER BLOWER BLDG <No Name> <NO Name> <No Name> <No Name> 00500 Miscellaneous Items 0.00 3/4" GRC RIGID CONDUIT 270.00 1.121 302.70 0.113 30.51 3/4" GRC 90-FIELD BEND LABOR 29.00 0.083 1.96 TYPE T BODY THRD 3/4 T75-M 4.00 10.489 41.96 0.656 2.62 NEOPRENE PERF GSKT 3/9 GK75-N 9.00 2.099 8.40 0.167 0.67 3/9IN BLANK STEEL COVER K75 4.00 2.907 11.63 0.099 0.38 00502 9/0 SHLD VFD CABLE 800.00 25.810 20698.00 0.030 29.00 #6 THHN CU STR 800.00 0.921 336.88 0.013 10.16 3/0 - 9/0 WIRE TERM LABOR 36.D0 0.420 15.12 #8-#6 WIRE TERM LABOR 36.00 0.228 8.19 3" KO FIELD CUT 6.00 0.546 3.28 00503 CAT 5 20.00 0.100 2.00 0.010 0.20 00504 WIRE TAG 32.00 0.750 24.00 0.100 3.20 00505 PROFIBUS TYPE DP BELDON 3079A 275.00 0.800 220.00 0.010 2.75 04007 3" GRC 290.00 7.964 1911.48 0.294 58.51 3" GRC 90-FIELD BEND LABOR 29.00 1.266 30.38 3" UNZSTRUT STRAPS 29.00 1.997 97.94 0.071 1.69 3" LOCKNUT 29.00 1.936 46.46 O.D34 0.81 3" PLASTIC BUSHING 12.00 2.691 32.29 0.304 3.65 3" CUT/THREAD/REAM GRC 12.00 0.962 11.55 75909 CUT, THREAD, REAM 3/4" RIGID 16.00 0.191 3.06 3/4" UNZSTRUT STRAPS 27.00 0.974 26.29 0.092 1.13 3/9" LOCKNUT 16.00 0.127 2.09 0.010 0.16 3/9" PLASTIC BUSHING 8.00 0.156 1.25 0.056 0.45 #12 THHN CU STR 760.00 0.108 82.OD 0.010 7.52 #19-12-10 WIRE TERM LABOR 32.00 0.189 6.06 Totals 23,745.31 228.03 Grand Totals 9 799.08 -11.70 • Page : 1 Date :612/2009 4:27:03 PM \^/ E .~'~ C O This quotation constitutes an offer to sell which offer expressly limits acceptance to the terms of this offer on the back of this quotation. This offer shall be firm for a period of thirty days (3Q) from the date of this offer. Subject to the extra Buyer's creditworthiness, tna return of this form with a Purchase Order number or any other reasonable manner of effort people acceptance wlll he sufficient to form an agreement on the terms and conditions on the back of this quotation. • - _ =~ 1211 S.27th Street West _ BILLINGS, M7 89102 as.a~N -- - ~~ 406-282-0176 40fr289-9900 -Fax To: MOUNTAIN STATES ELECTRIC Date: ,tune 16, 2009 Project Number: Project Name: BOZEMAN WTP -MCC CHANGES Account Representative: Mike Wiser Attn: TERRY Item Quantity Catalog Number and Description Unit Price U/M Total Price 1 LOT CHANGE TO MCC -PER CHANGE REQUEST CPR-010 $2,9fi0.00 $2,960.00 SEE ATTACHED BILL OF MATERAILS SHOWING CHANGES TOTAL r L F.O.B. Point of Shipment, Terms: Net 30, Freight: Prepaid and -ALLOWED • Page 1 of 1 • Job Name: City of Bozeman WRF MKW03560 Customer Bill of Material 1 Freedom MCC 60 Hz, Class 1B wiring, 480V 3-Phase Service, 42,000 Bracing, Bottom Incoming, NEMA 1 Gasketed 21"Front Mt Only enclosure, 1200A Copper Main Horizontal Bus, ANeutral, Main-Tie-Main Breakers • 3 HND Main 1 Bkr (1200A trip), Lugs: 4-#4/0-SOOKcmil 2 [Q 260 Power Quality Meter with Transducer 6 1200A Current transformer 4 100A Active Harmonic Correction Unit 30 FVNR Starter Size 1 [HMCP] 2 HFD Bkr {60A trip) 6 HLD Bkr (SOOA trip) 1 HFD Twin Bkr (20A/30A trip) 1 HFD Twin Bkr (30A/20A trip) 2 HFD Twin Bkr (20A/20A trip) 10 ]OOVA Individual CPT, Fused 30 N.O. Starter Aux Contacts, Size 1-4 10 Pilot Light-PTT-10250T {Run) l0 Mini Elapsed Time Meter 10 3 Pos. Sel. Sw., 10250T {Hand-Off-Auto} 1 ATS Option 37B-Six foot extension harness 2 RMS310 LS Trip 30 C-H Model D7, 300V, 4 Pole Socket Relay ] 0 l Unit PB, 10250T (Emerg) 30 Pilot Light-PTT-]0250T (Mist) 10 Solid State Overload Relay (Standard) 10 Terminal Block -Latching Pull-Apart, Std. 3 Main Bkr Mechanical Key Interlock 10 #16awg, MTW Control Wire 3 Fdr Bkr Digitrip 3t0 LSI Trip l RMS310 LSI Trip 1 PLIA Panelboard 225A 120/208V 3PH 4W 42 CKT 1 Pnlbd Bkr, BAB 1 Pole 30A bkr 1 Pnlbd Bkr, BAB 2 Pole 20A bkr 27 Pnlbd Bkr, BAB 1 Pole 20A bkr 1 ASCO 7000 Series Automatic Transfer 5w. i00A with no neutral 13 600A Copper Full Length Neutral Bus 1 800A Vertical Bus (Tin-plated cu) i3 600A Horiz. Cu Gnd Bus, 1/4" x 2" Bar 4 300A Vertical Bus (Tin-plated cu) 4 1200A Vertical Bus (Tin-plated cu) 4 600A Vertical Bus (Tin-plated cu) 13 42KA Bus Bracing 13 [solaced, Red glass polyester vertical bus barrier 13 Tin Plated horizontal bus 13 1200A Copper Frnt Mtd 21" NEMA I Gasketed 3 6" Door Special Configuration Notes: Used X-Space: 153 Blank X-Space: 3 Future ?C-Space: 0 MCC Lead Time Code: C Designations: 300-MCC-Ol -NEW • • MCC Ganaral Information Wiring Diagram Type MCC Duantity Standards SpeWai Codes Service Voltage (3 Phase) Frequency System Encbsure SpeeMcatlons Total Structures Type Depth HeipM Horizontal Wlreways Vertical Wireways Channel Sills Bosom Plates 150 WaH Space Heaters Space Heater7hermostat Master Terminal Block Location Seismic Zone 314 Braces Bua Syatam SpecHicatbns Main Bus Amps Main Bus Malenal Main Bus Bar Plating Insulated Hor(z. Bus 1000A/sq in. Cu Bus Vertical Bus Amps Vertical Bus Malarial Vertical Bus Barrier Bus Bracing ' Ground Bus Ground Bus Location Ground Bus lug Size ! Ground Bus Lug Type Plug-in 300A Vert. Gnd. Bus Neutral Neutral Bus Lug Location Neutral Bus Lug Size Neutral Bus Luq Type Horizontal Bus Temperature Rise Bottom Vert. Bus Barrier i i. rThe infortnat3on on this document is created by Eaton Corporation. n Is dlecbssd in contldencs and it h only to be used br the purpose in which it is supplied. NEG-ALT NUMBER • SW8409290801-0OO1 MCC General Information C-H Standard 1 UL845, NEMA, NEC UL 480V 60 Hz 3PH4W 13 NEMA 1 Gesketed 21" Front Ml Only 90" 9" High, Top & Bottom 4" No No None No None No 1200A Copper Ti n No No See Strudure Schedule Tin Plated Copper Isdated, Red 42,000 800 Top 1-#6-350Kcmil Screw No 600A Incoming Line 1-#6-350Kcmit Screw 65 deg C No lneoming Line Torminatbn Device: HND Main 1 Bkr (1200A trip), Lugs: 414/0-SODKcmil Cable Entry Bottom Splice Kit /Transition None MCC Type Match Up MCC Type Match Up GCdk "None MCC Starter Specifications Widng Class 1 B Control Voltage 120V Control Votage Src Ind CP7 Nameplate Size 1' X 2.5" Nameplate Cdor Black / Whke Letters Pdd Oev. Model 10250T Ind. Light Type Push to Test PL Cdor (On) Red PL Color (Mist) White Structure Schsdula There are 13 structure(s). Strudure(s) 1,4,10,13 have a 300 A Vertical Bus. Strudure(s) 5,9,11,t2 have a 600 A Vertical Bus. Strudure(s) s have a 800 A Vertipl Bus. Strudure(s) 2,3,7,9 have a 120D A Vertical Bus. Total width of all sedions is 276.0" HdgM of all sedions is 90.00" Unit Modifleations Sdid State Overload Rday (Standard) Terminal Block -Latching Pull-Apart, Std. #16awg, MTW Control Wire PREPARED BY DATE Schwendeman,MlkoD 08f041o9 Eaton Corporation APPROVED BY DATE JOB NAME City Of BOZ@nlan WRF DESIGNATION 300_IMCC-01 -NEW VERSION TYPE ~ DRAWING TYPE---~-~--~_~--_-~-~-: ` 6.7 MCC 2100 ' Customer Appr. REVISION DWG SIZE G.O. ITEM ~ SHEET A MKW03680 ~ 1 OF 11 ~ .] C~ Top View i --._9.41'-_ - 5-41" -5.41". .5.41"_ _„ 17.50"' ---_-- 17.50' ,r'-17.50"_' _-- 17.50"'' iF 2F 3F 4F A 8 C D E F G H J K L M c i ~ IQ 260 ' ~ f FVNR HND31200 ®R S^1 HLD3500 HLD3500 - HFD30/20 ~ ~ ~, ,FVNR S1 HFD20/20 HFD3060 T ®~ FVNR S1 Main 1 Bkr HLD3500 HLD3500 FVNR S1 --- ~ _ _ ~ I~ L _.__~ __ • -._._.- I II ~ I 21.00" I ---SA1"--- --5.41"-~ -- 3.41 541" 1 ~~~~1,~O~j~•.s~rSn_--~ `1' ~1~•.~x. ,i~:00' 1" x- ~~, 0'_1 -~ i _~ - - 5___...-... - - _-: n __ _i_ '~-- -~ __~~- M ---zo.o"---~-~-----zo.o°___-,~„-}_20.0"_ .. ~,~ zD.D~ ... ,~ Floor View :The information on thi8 PREPARID BY DATE !document is created try Eaton Schwsndsman,lRlke D ofi/04109 'Eaton Corporation Fayetteville, NC Corporatbn. It is dlsebsed - - - -.._.. -- -_-_--_ in confidence and it la Doty APPROVED BY DATE JOB NAME Clty of Bozeman WRF to be used for the purpose in DEaIDNAnoN 300-MCC-01 -NEW ' wh kh k is s uppllsd. -------- ------ VERSION - TYPE I DRAWING TYPE fi.7 MCC 2100 Customer Appr. NEO,ALT NUMBER REVISION ~ DWG S2E G.O. ITEM SHEET SW8409Z9Q601-0001 A MKVY036fi0 2 OF 11 • i........ .. _... -- -._....._ _ -----------...--- ------- ---` - -- ..- _ _ --- i• i• 4- _ ~ r--~--~ --- -- --- - -i z1.oD"' ! -.._5.41"--- I 5.41" -~ 5.41"--- j 1. o=z~.6~~^.;i 1.00^ z1.6.415,_,~ ~1:00_~1'~:~"_." ,S-._'---._- -. T_._. - ~, 24.0"._-..,~.,.._.. .24.0"_-„„_.20.0"-.~ Floor View i 100A 100A FVNR S1 Acti e Activ v e Harmonic Harmonic Correction Correction Unit Unit HND31200 'r _~ Tle Bkr ~~ •~ill~~~ ~ I 11 i ~ ~I irr'... i , i' uj-i e uF. a !uut i 'j~i4 HS ~~?i~l i f,II IsiN,:, :ct: l R!ifi; The infomtatbn on this PREPARED BY DATE doeumont is treated by Eaton schwendemen, Miks D 06104!09 Eaton Corporation Fayetteville, IvC Corporation. ft is discbsed ---------- ----~--...----•---------_-- . in confidence and it is only I APPROVED BY DATE JOB NAME City of Bozeman WRF I I to be used for the purpose in ' DESIGNAnoN 000-NICC-01 -NEW wMch it is auppiisd. -_.._-_ .._____..._.._.._- ------------ •_--_-. ...... - ----_-- _ VERSION TYPE DRAN7NG TYPE 6.7 MCC 2100 Customer Appr. -._.-~--------------------------._._.... .._..---....------------_- -----~~----..._ j NEG-ALT NUMBER REVISION DWG SIZE G.O. ITEM SHEET SW840929Q801-0001 I A MKW03660 ' S OF 11 - ---.. ---------- --i---- _._..---- --- ---.1. ---------i-- Top View ~_--- ---- ~-I~; -; ---~ 5.41" 5,41" -_ 5,41" - 1.50"_ .' ---__ ,~2L50„-- ~-117.50" '~ 5F 6F 7F A B C D E F G H J K L M • • A B C D E F G H J K L M lop View 5.41"__ ~ 5.41" 5.41" } p_.-_ ".- .. _ '17.500., 21.50"~-"~ - 21.50"-' 8F 9F 10F ®~ FVNR S1 100A 100A Activ A ti ®^ e .Harmonic c ve Harmonic Correction Correction F~/N~ S1 Unlt Unit HFD3060 ATS I t _L- - - ,•~ 21.00" 5J 1..--- L----20.0"--- ~~ Floor View I _....,......._.._....._.-...._. _. ..._._._.. -The information on thin ...... rPREPARED BY dot:urrwnt f6 trotted 6y Eaton I Schwendeman, Mikr p Corporation. It it dlacloeed ~-__._._.__... In COnftdanCe and It It Onty , APPROVED BY to L» used for the purpose in ---_ .-_. - ~-~_------: I; -: f 5.41"------ -5.41"---..._l ---24.0". ,+,-----24.0"..----°'"1 ~owo4ros Eaton Corporation -- oArE - --- roe NAME - City of Bozeman WRF DESIGNATION 3OO-MCC-01 • NEW Wf11Gh d. N auppllod. VERSION TYPE 6.7 MCC 2100 NEG-ALT NlR.79ER REVISION DWG SIZE G.O. 'swa4092sQ801-0001 A MKWD9660 FryNtevilk, NC _ ..y i DRAWING TYPE -.--_-'_.-.. i ~ Customer Appr. ITEM SHEET -_- - _ _ 4 OF 11 • ~ --- . C The Information on this documerH fa crested by Eaton Corporation. k is disclosed in conTxlence and it fe only to be used for the purpose in which it is supplied. NEG-ALT NUMBER • SW840829Q801-0001 A B C D E F G H J K L M Top View - - -1.~- 5.41" 5.41" I 5.41" ---... ---- --~- ---c-- 11F 12F 13F FVNR S9 c ,-,~ ~ C' IQ 260 ~® HFD20/20 HND31200 ~ ® HLD3500 au..u HFD20l30 42CKT ~ FVNR 31 `~=J HLD3500 ~_----- Main 2 Bkr . _. _.. - - ---._..__ i .. ....- - .------ -- - __~ _._.. l ' ~I 21.00" I 5.41"=• - 5.41" ---- -5.4+1"-••• _~_ ' 1:00"- 1~:~"-,~ r~1.00"~1~:~:~ ~:6~i1~'~R' ~,-20.0"~_,+,-._20.0"--`~'------20.0" ,1 Floor View PREPARED BY --~-_~~. DATE Sehwendeman, Mlke D ~roaros Eaton Corporation ; APPROVED BY DATE .108 NAME CKy of Bozeman WRF DESIGNATION 300-MCC-01 -NEW VERSION TYPE b.7 MCC 2100 REVISION DWG SIZE G.O. ____ _ I _..... _._ _. _...... _ A MKW03880 _~ Feyettevilk, NC DRAYYING TYPE Customer Appr. ITEM ~.~ .-_._'. SHEET 1 a OF 11 i• i• i• 1M MAIN BREAKER HNO Mafn 1 Bkr HND 1 Main Bkr Mechanical Key Intedodc BUS A {i200A trip), Lugs: 3P 1 RMS310 LSI Trip 4-#410.500Kcmil 1200 2E BLOWER 1 HLD Bkr (SODA tnp) HLD 300-BLR-1 3p 500 UnR Nameplate Description Class Starter Size SkNSw Unit HPlFIA Pods Features _ --- Wire Diag. TriplClip 1B DIGITAL IQ 2fi0 Power Quality CUSTOMER Mater with Transduc METERING nsducer 2F 2H BLOWER R AUXILIARY COOLING FAC 300-ACF-03 2M BLOWER 5 300-BLR-O5 3E BLOWER 3 300-BLR-03 3F NLD Bkr (SOOA trip) 6" Door _. _ HMCP __._ i 1 f00VA Individual CPT, Fused 3P 3 N.O. Starter Aux Contacts, Size 1-4 15 1 1 Unit P8, 102507 (Emerg} 1 3 Pos. Sel. Sw., 102507 (Hand-Off-Auto) 3 GH Model D7, 300V, 4 Pole Socket Relay i 1 Mini Elapsed Time Meter 3 Pilot Light-PTT-102507 (Misc) 1 Pilot Lght-PTT-102507 (Run) - ~ HLD i Fdr Bkr Digitrip 310 LSI Trip 3P 500 HLD 3P 500 I The infam7ation on thls PREPARED BV DATE I -- document Is created by Eaton Schwendeman, Mika D 08104!09 Eaton Corporation Corporation. It is diacbsed -.- - . . _. Fayethvilk, NC ,._.._ __.__ in corlfNtatiCe and it fs only I APPROVED BY DATE JOB NAME City of Bozeman WRF ; to be used for the purpose In DESIONAnoN 300-MCC-01 -NEW whfchitlasupplied. =-------...---•- -------- __..-._ ---..--_.-._--__._-- ----. VERSION !DRAWING TYPE TYPE 6.7 MCC 2100 Customer Appr. i NEG-ALT Nl1MBER REVISION DNK'SIZE G.O. ITEM SHEET I SW840929Q801-0001 I A MKW03660 B OF 11 .---- _--- .._ .. _ _..---- ._ ..............___-__ _-- -- -~- - .._. L-----.. 6" Door FVNR Starter Size 1 F206 1 [HMCP] 5 HLD Bkr (500A trip) r 1/ ~J J Unit Nameplate Description Class Starter Size BkrJSw Unit HPlFLA Pokes Features I ----- ---•- -- ---- --.-......_ Wire Dlag. TripJClip i 3HL RAS CONTROL HFD Twin Bkr (20A120 HFO STATION 1 A trip) 3P CONTROL VALVE 1 5599A65.DWF 2D 300-CV-07 3HR RAS CONTROL HFD Twin Bkr (20Al20 HFD I STATION 1 A trip) 3P CONTROL VALVE 2 5599A$S.DWF 20 300-CV-02 3M MCC-AA HLD Bkr (500A trip) HLD 1 Fdr Bkr Digitrip 370 LSI Trip SECTION 1 3p 500 48 SPARE STARTER FVNR Starter Size t F206 1 HMCP t 100VA Individual CPT, Fused [HMCP} 10 3P 3 N.O. Starter Aux Contacts, Size 1-4 30 1 1 UnM PB, 102507 (Emerg) 1 3 Pos. Sei. Sw., t0250T (Hand-Off-Auto) 3 C-H Model D7, 300V, 4 Pole Socket Relay 7 Mini Elapsed Time Meter 3 Pilot Light•PTT-702507 (Mist) 1 Pilot Light-PTT-102507 (Run) 4D SPARE STARTER FVNR Starter Size t F206 1 HMCP t 100VA Individual CPT, Fused [HMCP] 1D 3P 3 N.O. Starter Aux Contacts, Size 7-4 i 30 7 1 UnH PB, 102507 (Emerg) 1 3 Pos. Sel. Sw., t0250T (Hand-Off-Auto) 3 GH Model D7, 300V, 4 Pole Socket Relay t Mini Elapaed Time Meter 3 Pilot Light-PTT-1025DT (Mist) 1 Pilot Lighi-PTT-102507 (Run} 4FL SPARE BREAKER HFD Twin Bkr (30A/20 HFD A trip) 3P 5599A85.DWF 3D 4FR SPARE BREAKER HFD Twin Bkr (30A120 HFD A trip) 3P 5598ASS.DWF 20 ;Th• InfOmutfon on this PREPARED BY DATE 'document Is eroated by Eaton Schwendeman Mike D 06J04109~ Eaton Corporation :Corporation. h isdisclosed , ----- -... Fayetteville, NC .. - _ ~ in confidence and it is only APPROVED BY DATE .IOB NAME City of Bozeman WRF to be used for the purpose In ' DESIGNAnoN 300-MCC-01 -NEW which it is aupplisd. ----.._ .. .... ...........- VERSION -- -- ---------........ ._._..-----...._------ -- 'TYPE DRAWING TYPE 6•~ MCC 2100 Customer Appr. NEG-ALT NUMBER RENSION I DWG SIZE G.O. ITEM aNEET SWti40929Q801-0001 L _~---_..~_-..._..-._..._....__....----------.... i A MKW03660 7 t7F 11 .... __I---------.. _.. .. .. _....--------._.-.. ....._..-- C] Unk Nameplate DeaeHptlon Class Starter Size BkrlSw Unit HPlFLA Poles Fsaturos -_ .__..,. Wiro Diag. TriplClip 4H ATS BREAKER HFD Bkr (60A trip) HFD 3P 5599A85.DWF 60 4K BLOWER 5 FVNR Stager Size 1 F206 1 HMCP 1 100VA Individual CPT, Fused ~ AUXILIARY [HMCP) 5 3P 3 N.O. Staner Aux COMaUS, Size t-4 COOLING FAN 15 1 1 Unlt PB, 102507 {Emerg) 300-ACF-0S 1 3 Pos. Sd. Sw., 102507 (Hand-ON-Auto) 3 C-H Model D7, 300V, .t Pok Socket Relay 1 Minl Elapsed Time Meter 3 Pilol Light-PTT-102507 (Mist) _ --- „1--Pilot Ught-PTT-102507 (Run) 4M BLOWER 1 FVNR Starter Size 1 F206 1 HMCP 1 100VA Individual CPT, Fused AUXILARY [HMCP] 5 3P 3 N.O. StaAerAux Contacts, Size t-4 COOLING FAN 75 1 7 Unii PB, 102507 (Emerg) 300-ACF-01 1 3 Pos. Sd. Sw. 102507 (Hand-O(f-Auto) 3 C-H Madd D7, 300V, 4 Pole Socket Relay • 1 Mini Elepsed Time Meler 3 Pilo) Light-PTT-102507 (Mist) ~ 1 Pilot Light-PTT-102507 (Run) ' SM 100A ACTIVE t00A Active Harmonlc HARMONIC Correction Unit CORRECTION UNIT 282933.DWF 6M 100A ACTIVE 100A Active Harmonlc HARMONIC Conection Unit CORRECTION UNIT 282933.DWF 7B BLOWER 2 FVNR Starter Slze 1 F206 1 HMCP t 100VA Individual CPT, Fused AUXILARY [HMCP] 5 3P 3 N.O. Starter Aux Contacts, Size 1-4 15 t t Unit PB, t0250T (Emerg) 1 3 Pos. Sd. Sw., 102507 (Nand-Ofl-Auto) 3 C-H Model D7, 3DOV, 4 Pole Socket Rday 1 Mini Elapsed Time Meter 3 Pilot Light-PTT-102507 (Mist) 1 Pilot Light-PTT•10250T (Run) • The lnfort+wtlon On thla PREPARED BY DATE ~ -....------------' ----_.-.._ . ._._.. ----._..._..__- I documerrt is croated by Eaton gchwandeman, Milo D peM4/09 'Eaton Cor ration Fayetteville, NC i Corporatbn. It is discbsad - - .. __..------_---~., _ ----. -... _.. ------ -----------._~-- in confidence and it h only APPROVED BY DATE JOB NAME City of Bozeman WRF to be used for the purpose in DESCNATIDN 300-MCC-01 -NEW whbh k is supplkd. _....-...- -------------_ -------------------- - VERSION TYPE DRAWING TYPE 6.7 ~ MCC 2100 I Customer Appr. - - i NEG-AlT NUMBER REVISION OWG SIZE G.O. ITEM SHEET L W840924Q801-0001 A MKw03860 B of 11 ----~----=-~~------._. _.... I. .. .. --I--------.....--- -- -~----...- ..._... .....------- Unk Nameplate 7M TIE BREAKER 8B BLOWER 4 AUXILIARY COOLING FAN 300.ACF-04 • 8D BLOWER 6 AUXILIARY COOLING FAC 300-ACF-08 8F ATS BREAKER Description Class Shrler Sits BkriSw Unk HPlFLA Poles Featuros Wire Diag. TNplClip HND Main Tie Bkr HND 1 Main Bkr Mechanical Key Interlock (1200Atrip),Lugs: 3P 1 RMS3i0 LS Trip 4-#410-500Kcmil 1200 FVNR Staler Size 1 F206 1 [HMCP] S FVNR Staler Size 1 F206 1 [HMCP] 5 HFD Bkr (60A trip) BM AUTOMATIC ASCO 700D Sedes TRANSFER SWITCH Automatic 7ransTer 300-ATS-01 Sw. 100A with no neutral 9M 100A ACTIVE t00A Active Harmonic HARMONIC Correction Unit CORRECTION UNIT 1DM 100A ACTIVE 100A Active Harmonic HARMONIC Correction Unit CORRECTION UNIT The information on this 'document ie created by Eaton Corporation. k is diecbsed in confidence and It b Doty to W used for the purpose in which k is supplied. NEG•ALT NUMBER • SW8409294801-0001 282933.DWF 1 ATS Option 378-Six foot extension harness PREPARED 8Y DATE ~ ~ I ~_ SchwsndsrtlMl, Miks 0 osm,uos -Eaton Corporation psy~~„F Nc APPROVED BY DATE .JOB NAME Oily of Bozeman WRF ~ DES+clvgnoN 300-MCC-0t -NEW ~ VERSION TYPE ORANANG TYPE 6•T MCC 2100 Customer Appr. . REVISION i pWG BIZE G.O. ITEM SHEET A MKW03660 9 OF 11 HMCP 1 100VA Individual CPT, Fused 3P 3 N.O. Starter Aux Contacts, Size 1-4 15 i 1 Unk PB, 102507 (Ernerg} 1 3 Pos. Sal. Sw., 102507 (Hand-Off-Auto) 3 C-H Model D7, 300V, 4 Pole Socket Relay 1 Mini Elapsed Time Meter 3 Pilo) Light-PTT-102507 {Mist) 1 Pild Light-PTT-102507 (Run} HMCP 1 100VA Individual CPT, Fused 3P 3 N.O. Starter Aux Contacts, Size 1~ 15 1 1 Unit PB, 102507 (Emerg) t 3 Pos. Sel. Sw., 102507 (Hand-Off-Auto) 3 GH Model D7, 300V, 4 PDIe Soeket Relay 1 Mini Elapsed Time Meter 3 Pilot Light-PTT-102507 {Mist} 1 Pilot Light-PTT-102507 (Run) HFp 3P 5599A85.DWF 80 282933.DWF w ~ Unft Nameplate 11B SPARE STARTER 11 DL RAS CONTROL STATION 1 CONTROL VAWE 3 300-CV-D3 11DR RAS CONTROL STATION 7 CONTROL VALVE 4 RAS-CV-04 itFL SPARE BREAKER • 11FR SPARE BREAKER Descriptbn Claaa Starter Sia BkdSw Unlt I HPlFLA Polea Pastures Wire Diaq. TrIp/Cllp FVNR Starter Size 1 F206 1 HMCP 1 100VA Individual CPT, Fused (HMCP] 10 3P 3 N.O. Starter Aux Contacts Size 1-4 HFD Twin Bkr (20A120 A trip) HFD Twin Bkr (20Al20 A trip) HFD Twin Bkr (20Al30 A trip) HFD Twin Bkr (20A/30 A trip) 30 1 1 Unit PB, 102507 {Emerq) t 3 Pos, Sel. Sw., 102507 (Hand-OH-Auto) 3 C-H Model D7, 300V, 4 Pok Socfcet Relay t Mini Elapsed Time Meter 3 PIIa Light-PTT-102507 (Mist) _. _.__,_-....._ .. _._- 1 Pilot Light-PTT-102507 (Run) ...- HFD 3P 5599A85.DWF 20 HFD 3P 5599A85.DVJF 20 HFD 3P 5599A85.DWF 20 HFD 3P 5599A85,DWF 30 11H SPARE STARTER FVNR Starter Size 1 F206 1 (HMCP] 10 11 M BLOWER 6 HLD Bkr (SODA trip) 300-BLR-05 • HMCP 1 100VA Individual CPT, Fused 3P 3 N.O. Starter Aux Contacts, Size 1.4 30 1 1 Unit PB, 102507 (Emerg) 1 3 Pos. Sel. Sw., 102507 (Hand-Oft-Auto) 3 C-H Model D7, 300V, 4 Pole Socket Relay 1 Mini Elapsed Time Meter 3 Pilot Light-PTT-102507 (Mist) 1 Plla Light-PTT-102507 (Run) HLD 1 Fdr Bkr DigiVip 310 LSl Trip 3P 500 i ~~t~ }ivili'1)jil~il? iill]'ii'i''.j,s'"ill ?Ilj is ~i!(ii; i a:•.i•li!!~I• (~.~ia?t,,;i;l?:alirlil{ll„itilf ill,,:, `,~f~lhlli ~' ~Il~r~;, Ill f T ` IIt h ,I .Ill:l { I'~' iliLi~~~rAtl :'Ili .'R { F ,1,j3..1! ,i?~;~,~ :: s d1~11118:IIILI:ga:a.;rta!iMt,t{~;;n .The information on this PREPARED BY GATE , document is eraated 6y Eaton Schwenaeman, Mika D 06104109 Eaton Corporation FaydteYak, NC Corporation. ft ie disclosed - ------ _ ___-.....------------ --- -- ----... - -------_...- - --- in confidence and It la only ~ APPROVED BY GATE 109 NAME City of Bozeman WRF i to ba used for the purpoa• in DESIGNATON 300-MCC-01 -NEW which it la supplied. -._.... _._ ...-_ _---- ... -. -- -. -- -..___.._ --.-_ . j ~ VERSION TYPE iDROYNNG TYPE 6•~ MCC 2100 CuatomarAppr. NEG•ALT NUMBER REVISION I OwG 612E G.O. ITEM SHEET sweaos2sc1sol.ooot /~ Mscwo3sso 11o OF s1 • • • Unk Nameplate Description 12E BLOWER 2 HLD Bkr (SODA trip) 300-BLR-02 12L POWER PANELBOARD 300-PP-01 12M t36 DIGITAL CUSTOMER METERING 73M MAIN BREAKER BUS B IQ 260 Power puality Meter with Transduc nsducer Class StarterSlse BkdSw Unit HPIFLA Poles Features _ . taro Dieg. - _ _ ... 7riplClip HLO 3P 500 1 Pnibd Bkr, BAB 1 Pole 30A bkr 1 Pnlbd Bkr, BAB 2 Pole 20A bkr SA10398.DWF 27 Pnlbd Bkr, BA8 1 Pole 20A bkr HND Main 2 Bkr (1200A trip), Lugs: 4-#4/0.500Kcmi1 HND 1 Main Bkr Mechanical Key Intedock 3P 1 RMS310 LS Trip 7200 The information on this PREPARED 9Y DATE i tlocument is created by Eaton SehwerMaman, Mlke D 06/04109 Eaton COrpO~ati011 Corporation.kisdiacbsed -_-.. __ --- ----.-...-- F~yettrville, NC _-. _--~ _ in rAnfidence and k Is only !APPROVED BY DATE -,.------- JOB NAME City Of Bozeman WRF !o be used for the purposa in ~ DESICNaTtoN 300-MCC-01 -NEW whiefi k is supplied. ...-----°-°--- VERSION --..._.... -- - - TYPE - -----.. DRANANG TYPE ~ 6.T i MCC 2100 Customer Appr. NEG-ALT NUMBER REVISION i pWG SIZE G.O. ITEM SHEET i SW840929Q801-0001 A I MKW03660 11 OF 11 PL1A Panelboard 225A 720/208V 3PH 4W 42 CK7 6" Door ~' ~ 'MORRISON CHANGE PROPOSAL REQUEST ~~ ~E~E ~ {Not a Change Order} Project: Bozeman W RF Phase 1 Improvements CPR No.: 011 CPR Da#e: 05!19/2009 Date Sent to Contractor: 05!1912009 Date Recd from Contractor: Recommended by HDR/MM1 Jali L-a+a4f.Ql w7Vlti Ll Vlla 1lL~J ~s. Mold. Lead & Safety C:ansuttinq ono vir s~r-r i-roio r~ coo i~ni _ :._... .w n.-, c., -. „~.,-, TO: Williams Brother Construction Please furnish your proposal for executing the following change(s): UtilidodDrain Manhole Conflict (RFf 029): Per discussions with Craig Brawner provide a vertical tee at the drain manhole to allow for required vertical drop end clearance wish the utifidor Extend upper portion of the tee to surface and provide traffic rated-lid for access. Extend Tower portion of tee to allow for vertical adjustment and install 45 degree fittings per plan notes on both fides of the utilidor Utilize SDR-35 PVC for pipe and fittings. HDR/MM1 "./'r ".~` ~~~ TO: HDR Engineering, lnc. /Morrison Maierle, Inc. Proposal: Date: 05/1912009 Cost ~Z ~`S3• Credit {A time extens' uir d f this modification unless otherwise detailed and justified:} Da#e ` iG~~ ~ Contr or Accepted/Nct Accepted HDR/MMI: Date Accepted/Not Accepted Owner: Date Response: It is noted that asbestos pipe disposal for the secondary effluent junction box is included in this proposal and therefore will not be included in CPR 014. Tfl: 7/7/~ K PROJECT ESTIMATE D .............. tnt....a.. ~ni...__ ni_._,. ____. _ P.O. Box 7 Bozeman, Phoz~e: ftla __ _ _~ ~ ~~ MORRISON ~ MAIERLE, INC. CHANGE PROPOSAL REQUEST (Not a Change Order) Project: Bozeman WRF Phase 1 Improvements TO: Williams Brother Construction CPR No.: 012 CPR Date: 05/26/2009 Date Sent to Contractor: Date Recd from Contractor: Please furnish your proposal for executing the following change(s): Over excavate and haul 1.50 per yd3 Load and haul site gravel 1.25 per yd3 Grade and compact 2.50 per yd3 5.25 per yd~ Mark-up @17.11% 0.90 Total $6.15 • Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted Accepted/Not Accepted HDR/MMI: Date Owner: Date Response: Recommend payment based on actual quantity of excavated material. Total estimated yardage for project is 2,500 cubic yards. Recommended by HDR/MMI ~~~ ~~~/d T • I ~ I