Loading...
HomeMy WebLinkAboutWest Winds Major Subdivision Phases 4 and 5 Street Variance Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Andy Epple, Director of Planning SUBJECT: West Winds Subdivision Street Variance – Breeze Lane MEETING DATE: July 6, 2009 BACKGROUND: An Application for a Subdivision Variance has been submitted that would defer the construction of Breeze Lane, a planned local street lying between Windward Drive and Davis Lane in Phases 4 and 5 of the West Winds Major Subdivision, until a development proposal for the subject property (“The Villas at West winds) is reviewed and approved. The variance request is from Section 18.74.030 B.1.b.(2), which generally requires that building permits not be issued until all street improvements are completed and accepted by the City of Bozeman. The limited effect of granting the variance would be that building and occupancy permits for the approved Spring Creek Alzheimer’s Residential Facility, lying east of Windward Drive on Lot 1, Block 2, Phase 4, West Winds Major Subdivision, could be issued prior to Breeze Lane west of Windward Drive being completed and accepted by the City. RECOMMENDATION: Conditional Approval FISCAL EFFECTS: None identified ALTERNATIVES: As suggested by the City Commission. Report compiled: July 2, 2009 66 CITY COMMISSION STAFF REPORT WEST WINDS MAJOR SUBDIVISION PLAT – PHASES 4 AND 5 STREET VARIANCE FILE NO. #P-09005 #P-07037 The Knolls East and Highland South Major Subdivision Preliminary Plat Staff Report 1 Item: Subdivision Street Variance Application #P-09005, to defer the construction of Breeze Lane, a planned local street lying between Windward Drive and Davis Lane in Phases 4 and 5 of the West Winds Major Subdivision, until a development proposal for the subject property is reviewed and approved. The variance request is from Section 18.74.030 B.1.b.(2), Bozeman Municipal Code, which generally requires that building permits not be issued until all street improvements are completed and accepted by the City of Bozeman. The limited effect of granting the variance would be that building and occupancy permits for the approved Spring Creek Alzheimer’s Residential Facility, lying east of Windward Drive on Lot 1, Block 2, Phase 4, West Winds Major Subdivision, could be issued prior to Breeze Lane west of Windward Drive being completed and accepted by the City. Property Owner: Cascade Development Inc. 1627 West Main Street, Suite 223 Bozeman, MT 59715 Representative: DOWL HKM 920 Technology Boulevard, Suite A Bozeman, MT 59718 Date/Time: Before the Bozeman City Commission on Monday, July 13, 2009 at 6:00 PM in the Commission Meeting Room, Bozeman City Hall, 121 North rouse Avenue, Bozeman, Montana Report By: Andy Epple, Director of Planning Recommendation: Conditional Approval ___________________________________________________________________________________ PROJECT LOCATION The subject property is located at the northeast corner of the intersection of Oak Street and Davis Lane, west of Windward Drive and south of Winter Park Street. The property is legally described as Lots 1 and 2, Block 1, and Lot 1, Block 4 of the West Winds Major Subdivision Phase 4; and Lot 1, Block 3, Lot 1, Block 4 of the West Winds Major Subdivision Phase 5, located in the NW ¼ Section 2, T2S, R5E, PMM, Gallatin County, Montana. The property is annexed with a zoning designation of R-3 (Residential Medium Density District). Please refer to the vicinity map on Page 2 of this report. 67 #P-09005 West Winds Street Variance Staff Report 2 PROPOSAL Cascade Development Inc., represented by DOWL HKM, has submitted a subdivision variance application to defer the construction of Breeze Lane, a planned local street lying between Windward Drive and Davis Lane in Phases 4 and 5 of the West Winds Major Subdivision, until a development proposal for the subject property is reviewed and approved. The variance request is from Section 18.74.030 B.1.b.(2), which generally requires that building permits not be issued until all street improvements are completed and accepted by the City of Bozeman. The limited effect of granting the variance would be that building and occupancy permits for the approved Spring Creek Alzheimer’s Residential Facility, lying east of Windward Drive on Lot 1, Block 2, Phase 4, West Winds Major Subdivision, could be issued prior to Breeze Lane west of Windward Drive being completed and accepted by the City. ZONING DESIGNATION & LAND USES The property is annexed to the City and zoned R-3, Residential Medium Density. The intent of the R-3 zoning district is to provide for the development of one-to five-household residential structures near service facilities within the City. It should provided for a variety of housing types to serve the varied needs of households of different size, age and character, while reducing the adverse effect of nonresidential uses. The property is part of the greater West Winds Community Planned Unit Development, and is designated “Senior Assisted Living Area” on the Final PUD Plan. The subject property is currently vacant, except for an excavation pit and security fence associated with gravel extraction for road construction and other purposes within the West Winds PUD. The following land uses and zoning are adjacent to the subject property: North: Zoned R-3; vacant, with subdivision infrastructure improvements currently being installed. 68 #P-09005 West Winds Street Variance Staff Report 3 South: Across Oak Street, Harvest Creek Subdivision, zoned R- East: Across Windward Avenue, Bozeman Lodge Senior Living, and approved site for Spring Creek Inn. West: Across Davis Lane, County Regional Park GROWTH POLICY DESIGNATION The area included in this application was designated as planned Residential on the Future Land Use Map of the Bozeman 2020 Community Plan, and continues to be designated Residential in the newly adopted Bozeman Community Plan. The mix of uses approved as part of the West Winds PUD, including those in Phases 4 and 5, has been found to be in compliance with these land use classifications. PRELIMINARY AND FINAL PLAT STATUS Preliminary and Final Plat applications for Phases 4 and 5 of West Winds were formally reviewed and approved by the City in 2008, with Phase 4 receiving Final Plat approval in September, and Phase 5 receiving Final Plat approval in November. Per Code, improvements agreements and financial guarantees were provided by the owner to allow for the filing of the Final Plats prior to completion of required infrastructure. These instruments give the owner 1 year from the date of filing the plats to complete the required infrastructure improvements. To date, all of the infrastructure improvements in Phase 4 necessary to support the Spring Creek Inn Alzheimer’s residential facility are installed, while other improvements in phase 5 are under construction and nearing completion. Breeze Lane between Windward Avenue and Davis Lane is part of the infrastructure necessary for the completion of West Winds Phases 4 and 5 subdivision plats, but has not been constructed at this time. Per the improvement agreements and financial guarantees, Breeze Lane between Windward Avenue and Davis Lane need to be completed this fall. BACKGROUND INFORMATION West Winds Subdivision is a 44.905 acre multi-phased development consisting of a mix of residential uses ranging from single household detached to multi-household attached with a significant area in the southwest quadrant reserved for Senior Assisted Living. To date in that area, east of Windward Avenue, the Bozeman Lodge assisted living care facility has been constructed, and the Spring Creek Inn Alzheimer’s care facility has received Final Site Plan approval from the City. West of Windward Avenue in this quadrant of West Winds Subdivision is where the owner wishes to build the Villas at West Winds, an active senior community housing development. It is in the proposed Villas at West Winds area that Breeze Lane will need to be constructed to complete Phases 4 and 5 of the subdivision development. The Planned Unit Development review process was used by the owners in the review and development of West Winds to allow for multi-household development (five or more housing units in a structure) in an R-3 zoned district. The PUD review and approval process also enabled the owner to engage in “concurrent construction” (where infrastructure and building construction may occur simultaneously) in certain areas of the development. Breeze Lane through the proposed Villas at West Winds was the subject of a Commission action in the Fall of 2008. In that action, the Commission agreed with the owner that Breeze Lane, a planned private street, 69 #P-09005 West Winds Street Variance Staff Report 4 could vary from the standard City street alignment to accommodate an alternative site plan design for the active senior residential community. The owner feels that past PUD approvals, and the Commission’s action to approve an alternative street alignment “based on site plan review,” entitle them to defer construction of Breeze Lane until a final site plan for the Villas at West Winds has been approved. Staff has disagreed with this notion, citing that Breeze Lane needs to be constructed within the time frame established by the improvements agreements and financial guarantees provided to allow for the filing of the Phase 4 and 5 subdivision plats, i.e., by no later than Fall of 2009. In October 2008, RJ Development Services purchased Lot 1, Block 2 of West Winds Phase 4, and thereafter commenced a site plan review process to develop the Spring Creek Inn Alzheimer’s care facility. The Final Site Plan for that development has been approved, but a building permit for the facility cannot be issued until “all Phase 4 infrastructure” for the subdivision has been completed and accepted by the City. Although staff advised the owner and applicant of this requirement on several occasions over the past six months, it was apparently not understood that this infrastructure requirement included Breeze Lane west of Windward Avenue. The owner has continued to assert that he feels Breeze Lane west of Windward Avenue only needs to be constructed when the Villas at West Winds project is approved. The result of all this is that Spring Creek Inn is ready to commence construction on its Alzheimer’s Care Facility, but cannot do so because Breeze Lane west of Windward Avenue remains unconstructed. Indeed, all the Phase 4 subdivision infrastructure needed to directly support Spring Creek Inn is currently installed. This subdivision street variance, if granted, would have the limited effect of allowing Spring Creek Inn to proceed with their construction project ahead of completion of Breeze Lane west of Windward Avenue. SUBDIVISION VARIANCE REVIEW CRITERIA AND FINDINGS Section 18.66.070 Bozeman Municipal Code sets forth subdivision variance review criteria and procedures. Generally, such variance requests are heard in conjunction with preliminary plat applications, and follow the preliminary plat review procedures. Because Phases 4 and 5 of West Winds Subdivision have already received Final Plat approval and have been recorded since last Fall, there is no preliminary plat review to conduct at this time. Therefore, this variance proposal is being brought directly to the City Commission for review and action. This application consists of a subdivision variance proposal to defer the construction of Breeze Lane, a planned local street lying between Windward Drive and Davis Lane in Phases 4 and 5 of the West Winds Major Subdivision, until a development proposal for the subject property is reviewed and approved. The variance request is from Section 18.74.030 B.1.b.(2), which generally requires that building permits not be issued until all street improvements are completed and accepted by the City of Bozeman. The limited effect of granting the variance would be that building and occupancy permits for the approved Spring Creek Alzheimer’s Residential Facility, lying east of Windward Drive on Lot 1, Block 2, Phase 4, West Winds Major Subdivision, could be issued prior to Breeze Lane west of Windward Avenue being completed and accepted by the City. Per Section 76-3-506, MCA, a variance to the UDO must be based on specific variance criteria, and may not have the effect of nullifying the intent and purpose of this title. The City Commission shall not approve subdivision variances unless it makes findings based upon the evidence presented in each specific case that the following review criteria are adequately addressed. 70 #P-09005 West Winds Street Variance Staff Report 5 1. The granting of the variance will not be detrimental to the public health, safety, or general welfare, or be injurious to other adjoining properties. Breeze Lane west of Windward Avenue is a planned local street that will primarily serve residents in the vicinity of the proposed Villas at West Winds development. Deferring its construction until the Villas project is approved should not be detrimental to the public health, safety, or general welfare, or be injurious to other adjoin properties, unless such deferral lasts indefinitely. Staff feels it is important to ensure that Breeze Lane be constructed west of Windward Avenue within a certain period of time, so that it can be used by other area residents as a means of providing connectivity, regardless of whether the Villas project is completed as planned or not. 2. Because of the particular physical surroundings, shape or topographical conditions of the specific property involved, an undue hardship to the owner would result if strict interpretation of this title is enforced. The physical surroundings of the West Winds Planned Unit Development represent a complex, multi-phase development with various Code relaxations, concurrent construction approvals, development plan revisions, and plat recordings based on improvement agreements and financial guarantees. Also, the alignment or “shape” of Breeze Lane West of Windward Avenue is yet to be determined, since the Villas development proposal is yet to be approved. In the midst of this, a third party developer of an Alzheimer’s Care Facility has gone through an extensive site plan review process and is ready to begin construction on a lot within Phase 4 which is adequately served by subdivision infrastructure. 3. The variance will not cause a substantial increase in public costs. Granting this variance should include a condition requiring the applicant to post an appropriate financial guarantee for the completion of Breeze Lane within a specified time period. In that manner, deferring the construction of Breeze Lane West of Windward Avenue should not cause any increase in public costs. 4. The variance will not, in any manner, place the subdivision in nonconformance with any other provisions of this title or with the City’s growth policy. The variance would not place the subdivision in nonconformance with any other provisions of the code or growth policy. On balance, based on the evidence presented, Planning Staff believes the subdivision variance review criteria are adequately addressed and supports the variance request, while Engineering Division staff does not oppose the granting of the variance. PUBLIC COMMENT One public comment has been received as of this writing, in opposition to the granting of the variance. A copy of this individual’s letter is attached to this report. Any comments received after the writing of this Staff Report will be distributed to the Commissioners at the public hearing. 71 #P-09005 West Winds Street Variance Staff Report 6 RECOMMENDED CONDITIONS OF APPROVAL Should the Commission find that the subdivision variance criteria are adequately addressed with this application, and chooses to approve this variance request, staff recommends the following conditions be applied to the project: 1. The period of time for which this variance is valid shall be not more than two years, or until the Villas at West Winds or other development proposal for the subject property is completed, whichever occurs first. 2. To ensure completion of construction of Breeze Lane west of Windward Avenue within the timeframe specified in Condition 1 above, the subdivider shall provide an improvements agreement and appropriate financial guarantee as required by the City Engineering Division, per standard City policy and practice. 3. This variance shall only be applicable to Lot 1, Block 2 of West Winds Phase 4, to accommodate the issuance of building and occupancy permits for the Spring Creek Inn Alzheimer’s Care Facility. All other “No-Build” restrictions as recorded with the Final Plats for Phases 4 and 5 of West Winds shall remain in effect until such time as Breeze Lane west of Windward Avenue is completed and approved by the City. AS AN APPLICATION FOR A SUBDIVISION VARIANCE, THE CITY COMMISSION SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET FORTH IN SECTION 18.66 OF THE UNIFIED DEVELOPMENT ORDINANCE. Attachments: West Winds Request of Subdivision Variance One letter of comment Mailed to: Cascade Development Inc., 1627 West Main Street , Suite223, Bozeman, MT 59715 DOWL HKM, 920 Technology Boulevard, Suite A, Bozeman, MT 59718 72 West Winds Phase 4 Subdivision Request for Subdivision Variance Prepared for:Prepared by: Cascade Development, Inc. June 26, 2009 73 920 Technology Blvd.Suite ABozeman, MT 59718406-586-8834406-586-1730 (fax)dowlhkm.com 74 920 Technology Blvd.Suite ABozeman, MT 59718406-586-8834406-586-1730 (fax)dowlhkm.com 75 WEST WINDS SUBDIVISION - PHASE 4 VARIANCE INSTALLED UTILIES FIGURE 3 LEGEND 76 77 PPPPWEST WINDS SUBDIVISION - PHASE 4 VARIANCE SPRING CREEK INN ALZHEIMER SITE PLAN FIGURE 5 78 79 80 81 82 83 84 85 86 87 88 June 23, 2009 Bozeman City Commission, We are in the Seniors Housing business and have identified a large unmet need in Bozeman and Gallatin County to care for those with Alzheimer’s and other related dementias in an assisted living environment. We are excited to be a part of such a vibrant community as Bozeman. We look forward to the prompt resolution of the current situation, which is summarized below, in order to move forward with the care these residents desperately need. Before we purchased the property for the Spring Creek Inn in October 2008, we reviewed the West Winds Phase 4 final plat. The final plat showed the roads which were to be improved for the Phase 4 infrastructure in order for us to receive our permit for the Spring Creek Inn. It was clear by looking at the plat which roads needed to be improved; those that were labeled by name (Hunters Way, Windward Ave, Winter Park St). We saw an ‘easement’ labeled through the Villa’s property, and recognized it as an easement as indicated. Therefore, the Phase 4 infrastructure that was being improved by Cascade Development at the time (Hunters Way, Windward Ave and Winter Park St, which is now completed and approved), was the infrastructure we relied upon being completed, based on the final Phase 4 plat. We were anticipating our building permit to be released around June 1 (which was the estimated time of completion of the required Phase 4 infrastructure, based on the final Phase 4 plat), until we received an email from Sue Stodola on May 28, 2009 stating that the permit will not be issued until the portion of ‘Breeze Lane’ within the Villa’s property has been built and approved. That was very confusing since the final plat did not show that as ‘Breeze Lane’, but rather as an easement. This was the first time we understood how the City perceived this portion of the road. As a third party purchaser, without previous history with the City staff and the West Winds developer, we reasonably relied on the final recorded plat. We are currently in a situation where the City staff will not release our permit in order to force Cascade Development to improve that portion of Breeze Lane, although the City currently has an improvements agreement with Cascade Development for that portion of the road to be determined through the Villa’s site plan review process. This is hugely detrimental to us and creates and undue hardship since we have a financing commitment in place with a limited time frame on it, which if lost would be nearly infeasible to replace in today’s credit environment. In order to mitigate the damages to our company that this situation will inevitably create if resolution is not immediately forthcoming, we expeditiously request the release of our building permit, which is currently ready for submittal by the City staff upon immediate granting of the variance request. We have contractors under contract and in place ready to begin work immediately upon the receipt of the permit. Respectfully submitted, RJ Development Services 89 June 26, 04S0.671 Andy Ep City of B Planning P.O. Box Bozeman RE: W R Dear Mr. DOWL H formally TIME FO This appl meeting i between regulatio variance. Summary T P P d W st T p co o o re “e en In w an d th Alaska - An 2009 125.01 pple Bozeman g Department x 1230 n, MT 59771 West Winds P Request for S . Epple, HKM on beh makes appli OR SUBDIV lication for v it was presen the approve ns. Also du . y Statement: The requested lanned Unit hase 4 Subd efer and allo Winds Phase treet reviewe The City Staf ortion of Ph onstruction f f West Wind f Breeze Lan eview proces easement” to ntire size an nn is only a s without any p nd owner. A efeats the pu he Northeast nchorage, Juneau, 406-586-8834 ■ t 1 Phase 4 Sub Subdivision V half of Casca ication for su VISIONS (1. variance is p nted by staff d West Win uring this me : d variance is Developme division into ow for the pr 4 Subdivisio ed by Site Pl ff has taken t ase 4 until a for the exten ds Phase 4 S ne may be a ss. In additi o allow flexi d shape of P small portion public health As such, the urpose of the t portion of P Palmer ■ Arizona 406-586-1730 (fax) division Variance ade Develop ubdivision v .)(b.)(2). per our meeti f that this va ds Planned U eeting there w s to resolve a ent (PUD) an concert with roper timing on. Breeze L lan applicati the position all the improv nsion of Bree Subdivision. private stree on, the final ibility in fina Phase 4, and n in the Nor h and safety b only alterna e PUD and f Phase 4 rema a - Tucson, Tempe ■ 920 Technology pment, Inc. fo variance of s ing with City ariance would Unit Develop was concurre a conflict bet nd the UDO h the approv of the exten Lane, per th ion. that no build vements are eze Lane thr However, p et and subse l plat describ al location an because the rtheast corne benefit, wor atives becom final plat flex ains platted e ■ Montana - Bill Washington - y Boulevard, Suite A for the West ection 18.74 y staff on Ju d be the best pment (PUD ence that sta tween the ap subdivision ved West Wi nsion of Bree e West Wind ding permits installed an rough Lot 1, per the West quently revi bes the Breez nd street typ lot now con er of Phase 4 rks an undue me (1) concur xibility langu (which extin ings, Bozeman, Bu Redmond ■ Wyo A ■ Bozeman, Mon Winds Phas 4.030 (B.) CO une 22, 2009 t way to reso D) and the U aff would not pproved Wes regulations nds PUD. T eze Lane thr ds PUD, is t s can be issu nd complete, Block 4 and Winds PUD iewed throug ze Lane exte pe. However nveyed for th , delaying a hardship on rrent constru uage); (2) un nguishes valu utte, Great Falls, He oming - Lander, La ntana 59718 ■ www e 4 Subdivis OMPLETIO . During the olve the conf UDO subdivis t oppose the st Winds and bring th The variance rough West o be a privat ued for any including th d Lot 2, Bloc D, the extens gh the Site P ension as an r, because of he Spring Cr building per n the applica uction (which n platting so uable elena, Miles City aramie, Sheridan w.dowlhkm.com sion ON e flict sion he e will te he ck 1 sion Plan f the reek rmit, ant h only 90 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 2 of 7 entitlements); (3) delay the construction of the Spring Creek facility until full build out of Phase 4 (which imposes an undue burden on the applicant and owner); or (4) obtain a variance on the building permit preclusion before improvement completion for this limited area of Phase 4 (which poses no public health and safety risk). Obviously, if strict interpretation of this title is enforced and PUD entitlements are ignored and Breeze Lane is required to be fully reviewed, approved and constructed through the site plan process before issuance of a building permit, an undue hardship will be borne by the Spring Creek Inn owners and Cascade Development. In addition, granting the variance does not shift any risk to the City because Breeze Lane will be built eventually as per the Administrative Appeal #08005 and the Site Plan Application review process. Effect of Variance: The variance will allow the issuance of building permit and subsequent occupancy to the Spring Creek Inn Alzheimer’s Assisted Living Facility prior to review, approval and construction of Breeze Lane through Phase 4 Subdivision. We have attached the following materials for your review and comment. o Development Review application o Subdivision Variance Checklist o Certificate of Adjoining Property Owners List o Adjoining Property Owners List o Addressed Stamped envelopes o Neighborhood Recognition Certificate o Application Graphics o Application Fee o (2) Electronic Copies Below is our response to per Sections 18.66.070 Subdivision Variances and 18.78.160 Submittal Materials for Variances. Our responses where warranted are italicized and bold. 18.66.070 SUBDIVISION VARIANCES A. Procedure. The subdivider shall provide during the preapplication process, and include with the submission of the preliminary plat, a written statement describing the requested variance and the facts of hardship upon which the request is based. The Planning Board shall include their findings and conclusion regarding the requested variance in its recommendation to the City Commission. The City Commission shall then consider each variance at the public hearing on the preliminary plat. No response required. B. Review Criteria. Per §76-3-506, MCA, a variance to this title must be based on specific variance criteria, and may not have the effect of nullifying the intent and purpose of this title. The City Commission shall not approve subdivision variances unless it makes findings based upon the evidence presented in each specific case that: 91 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 3 of 7 1. The granting of the variance will not be detrimental to the public health, safety, or general welfare, or be injurious to other adjoining properties; The requested variance is to defer the extension of Breeze Lane through West Winds Phase 4 Subdivision as a private street and to bring the subdivision phase into concert with the approved West Winds PUD. Breeze Lane, per the West Winds PUD, is a private street and to be reviewed by Site Plan application. Breeze Lane is intended to be a minor access providing residents of the Villa’s at West Winds access to the Bozeman transportation grid system. The extension of Breeze Lane through the Villa’s Site Plan will not provide primary access to any other development or phase of the West Winds. Breeze Lane is not a collector or arterial standard street providing primary service to the Bozeman community. All other public infrastructure in Phase 4 Subdivision has been designed, reviewed, constructed and inspected by the City. The effect of the variance will allow the issuance of building permit and subsequent occupancy to the Spring Creek Inn Alzheimer’s Assisted Living Facility. The Spring Creek Parcel has fully-dedicated adjoining public streets and all the utility improvements have been designed, reviewed, approved, constructed and inspected by the City. Specifically; Access–The subject lot has fully dedicated and paved access for general public access and emergency service vehicle access. Wastewater disposal – The parcel has an installed 8” diameter sanitary sewer main adjacent with a sewer service to provide wastewater disposal. Water Service – The parcel has an installed 8” diameter looped water main adjacent with fire hydrants and a water service to provide fire flow and potable water service. Storm Drainage – The site has a storm drainage system that will provide positive drainage of the site to a storm water detention facility provided by the West Winds PUD. In summary, deferring the construction of Breeze Lane and issuing the Spring Creek Inn building permit will not be detrimental to the public health, safety, or general welfare, or be injurious to other adjoining properties. 2. Because of the particular physical surroundings, shape or topographical conditions of the specific property involved, an undue hardship to the owner would result if strict interpretation of this title is enforced; 92 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 4 of 7 Breeze Lane is located within the West Winds Phase 4 subdivision which in turn is a component of the West Winds PUD—a phased, planned community. The PUD granted specific planned uses and infrastructure phasing. The requested variance is to resolve a conflict between the approved West Winds Planned Unit Development (PUD) and the UDO subdivision regulations and bring the Phase 4 Subdivision into concert with the approved West Winds PUD. The variance will defer and allow for the proper timing of the extension of Breeze Lane through West Winds Phase 4 Subdivision. The City Staff has taken the position that no building permits can be issued for any portion of Phase 4 and 5 until all the improvements are installed and complete, including the construction for the extension of Breeze Lane through Lot 1, Block 4 and Lot 2, Block 1 of West Winds Phase 4 Subdivision. However, per the West Winds PUD, the extension of Breeze Lane may be a private street and subsequently reviewed through the Site Plan review process. In addition, the final plat describes the Breeze Lane extension as an “easement” to allow flexibility in final location and street type. However, because of the entire size and shape of Phase 4 and 5, and because the lot now conveyed for the Spring Creek Inn is only a small portion in the Northeast corner of Phase 4, delaying a building permit, without any public health and safety benefit, works an undue hardship on the applicant and owner. As such, the only alternatives become (1) concurrent construction (which defeats the purpose of the PUD and final plat flexibility language); (2) un platting so only the Northeast portion of Phase 4 remains platted (which extinguishes valuable entitlements); (3) delay the construction of the Spring Creek facility until full build out of Phase 4 and 5 (which imposes an undue burden on the applicant and owner); or (4) obtain a variance on the building permit preclusion before improvement completion for this limited area of Phase 4 (which poses no public health and safety risk). Obviously, if strict interpretation of this title is enforced and Breeze Lane is required to be fully reviewed, approved and constructed through the site plan process before issuance of a building permit, an undue hardship will be borne by the Spring Creek Inn owners. In addition, granting the variance does not shift any risk to the City because Breeze Lane will be built eventually as per the Administrative Appeal #08005 and the Site Plan Application review process. 3. The variance will not cause a substantial increase in public costs; and As stated in item #1 previously, Breeze Lane, per the West Winds PUD, is a private street and to be reviewed by Site Plan application. Breeze Lane is intended to be a minor access street providing residents of the Villas at West Winds access to the Bozeman transportation grid system. The extension of Breeze Lane through the Villa’s Site Plan will not provide primary access to any other development or phase of the West Winds. All public infrastructures within Phase 4 has been designed, reviewed, constructed and inspected by the City. The variance will not cause a substantial increase in public costs. 93 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 5 of 7 4. The variance will not, in any manner, place the subdivision in nonconformance with any other provisions of this title or with the City’s growth policy. The variance is in compliance with Administrative Appeal #08005 and the City’s growth Policy. A primary purpose of the variance is to resolve a conflict between the approved West Winds Planned Unit Development (PUD) and the UDO subdivision regulations and bring the Phase 4 Subdivision into concert with the approved West Winds PUD. The West winds PUD has been found to be in conformance with the City’s growth policy. The variance will not place the subdivision in nonconformance with any other provisions of this title or with the City’s growth policy. C. Variances from Floodway Provisions Not Authorized. The City Commission may not, by subdivision variance, permit subdivision for building purposes in areas located within the floodway of a flood of 100-year frequency as defined in Title 76, Chapter 5, MCA. Any variances related to floodways shall meet the standards of §18.66.060.C.4.a, BMC. The project site is not in a floodway and the requested variance is not floodway related. D. Conditions. In granting subdivision variances, the City Commission may require such conditions as will, in its judgment, secure the objectives of this title. Any approval under this section shall be subject to the terms of the conditions designated in connection therein. Any conditions required shall be related both in purpose and scope with the relief sought through the variance. So noted; the applicant reserves the right to review the conditions prior to the public hearing and comment on the conditions during the public hearing. E. Statement of Facts. When any variance from this title is granted, the motion of approval shall contain a statement describing the variance and conditions upon which the issuance of the variance is based. It is our understanding that the motion of approval shall be provided by City. F. Planned Unit Development. Where the standards and requirements of this title are proposed to be modified through a planned unit development, the applicable process shall be a deviation rather than a variance. This variance request is for the West Winds Phase 4 Subdivision which is a component of the West Winds PUD. A primary reason for the variance is to resolve a conflict between the approved West Winds Planned Unit Development (PUD) and the UDO subdivision regulations and bring the Phase 4 Subdivision into concert with the approved West Winds PUD. G. Limitations on Approvals. For subdivision variances, the variance approval shall be null and void if the final plat is not filed within the time allowed for final approval by the City Commission decision. The West Winds Phase 4 Subdivision final plat has been filed and was filed within the prescribed approval period. 94 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 6 of 7 18.78.160 SUBMITTAL MATERIALS FOR VARIANCES A. An application for a variance shall be accompanied by a development plan showing such information as the Planning Director may reasonably require for purposes of this title. The plans shall contain sufficient information for the Commission to make a proper decision on the matter. The request shall state the exceptional physical conditions and the peculiar and practical difficulties claimed as a basis for a variance. In all cases, the application shall include, and shall not be deemed filed until, all of the following is submitted: B. Name and address of the applicant; Cascade Development, Inc., 1627 West Main Street, Ste. 223, Bozeman, MT 59715. C. The legal description of the property involved in the request for variance, including the street address, if any, of the property; West Winds Phase 4 Subdivision situated in the NW ¼ of Section 2 T2S, R5E, P.M.M., Gallatin County, Montana. D. The names and addresses of the owners of the property and any other persons having a legal interest therein; Cascade Development, Inc., 1627 West Main Street, Ste. 223, Bozeman, MT 59715. E. List of names and addresses of property owners within 150 hundred feet of the site, using the last declared county real estate tax records; See attached. F. Stamped, unsealed envelopes addressed with names of above property owners; See attached. G. A site plan drawn to scale showing the property dimensions, grading, landscaping and location of utilities, as applicable; See attached. H. Location of all existing and proposed buildings; See attached. I. Drive accesses, driveways, access roads, parking spaces, off-street loading areas and sidewalks as applicable; See attached. J. A clear description of the variance requested and the reasons for the request; The variance is a modification to Section 18.74.030 (B.) Completion Time For Subdivisions (1.)(b.)(2). the modification will allow the issuance of a building permit and subsequent occupancy of the Spring Creek Inn Alzheimer’s Assisted Care Facility. The requested variance is to resolve a conflict between the approved West Winds Planned Unit Development (PUD) and the UDO subdivision regulations and bring the Phase 4 Subdivision into concert with the approved West Winds PUD. The variance will defer and allow for the proper timing of the extension of Breeze Lane through West Winds Phase 4 Subdivision. Breeze Lane per the West Winds PUD is to be a private street reviewed by Site Plan application. To delay the issuance of a building permit until the site plan process is complete will cause undue hardship to the owner. The following effected UDO section: 18.74.030(B.)(1.)(b.)(2) B. Completion Time for Subdivisions. 1.b.2. The subdivider shall enter into an improvements agreement guaranteeing the completion of the paving, curb, gutter, storm drainage, street lighting or other street infrastructure improvements not yet completed. The improvements agreement shall be financially guaranteed, as explained in this chapter. However, at a minimum, the plans and specifications for the 95 West Winds Phase 4 Subdivision Request for Subdivision Variance June 26, 2009 Page 7 of 7 street improvements must be approved by the City Engineer prior to final plat approval. Building permits will not be issued until the street improvements are completed and accepted by the City of Bozeman unless otherwise provided for in development proposals occurring under the provisions of Chapter 18.36, BMC, Planned Unit Development (PUD), and pursuant to the criteria established in §18.74.030.D, BMC; K. Justification, in writing of subsections 1, 2, 3 and, when applicable, 4 of §18.66.060.C, BMC; See response above to Section 18.66.060. L. Evidence satisfactory to the City Commission of the ability and intention of the applicant to proceed with actual construction work in accordance with said plans within six months after issuance of permit; and Attached is a letter from RJ Development the developers of the Spring Creek Inn Alzheimer’s Assisted Living Facilities documenting their hardship and that they will proceed immediately with the construction of the facility with issuance of the building permit. M. Required filing fee. Attached is fee for $1,750.00 Please note we request that the City Commission consider refunding the application fee because this variance is to resolve a conflict between the West Winds Planned Unit Development (PUD)which was found to be in compliance and is the basis of the West Winds phased subdivisions and the UDO subdivision regulations. If you need any additional information or materials please feel free to contact our office. Sincerely DOWL HKM ______________________________ Clint Litle, P.E. Senior Project Manager CC: John Dunlap Jeff Yates Enclosures(s) 96 Table of Contents Vicinity Map Application Letter RJ Development Letter (Spring Creek Inn) Development Review application Subdivision Variance Checklist Neighborhood Recognition Ordnance Competition Certification Certificate of Adjoining Property Owners List Graphics • Location Map • Figure 6.4 Road Plan (West Winds PUD) • Phase 4 Installed Street & Utility Plan • Breeze Lane & Proposed Villa’s Development • Spring Creek Inn Alzheimer’s Site Plan 97 98