HomeMy WebLinkAboutChange Order No. 1, Water Reclamation Facility with HDR~ t Mot~usoN CHANGE ORDER DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Bozeman CONTRACTOR Williams Brother Construction. , LLC Contract: Bozeman WRF Phase 1 Improvements Project: Bozeman Water Reclamation Facility OWNER's Contract No. SRF C303105-01 ENGINEER HDR/MMI ENGINEER'S Contract No. 00..60746 You are directed to make the following changes in the Contract Documents: Description: Substitute stainless steel mechanisms on the mechanisms for the two secondary clarifiers and the fermenter in lieu of steel as specified in the contract documents. Details provided in Change Proposal Request No. 007. Reason for Change Order: The stainless steel mechanisms will have a longer life expectancy and will result in reduced maintenance costs over the life of the facility. Attachments: Change Proposal Request No. 007. CHANGE IN CONTRACT PRICE: Original Contract Price $ 36,362,223.00 Net Increase (Decrease) from previous Change Orders No. 0 to 0 $ 0.00 Contract Price prior to this Change Order: $ 36,362,223.00 Net increase (decrease) of this Change Order: $ 18 000.00 Contract Price with all approved Change Orders: $ 36,380,223.00 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: October 5, 201 I Ready for final payment: Januar~8, 201.2 (da s or dates Net change from previous Change Orders No. 0 to No. 0 Substantial Completion: 0 Ready for final payment: 0 da s Contract Times prior to this Change Order: Substantial Completion: October 5, 201.1. Ready for final payment: Januar~8, 2012 da s or dates Net increase (decrease) this Change Order: Substantial Completion: 0 Ready for final payment: 0 (days) Contract Times with all approved Change Orders: Substantial Completion.: October 5, 2011 Ready for final payment: January 8, 2012 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated. otherwise in the Change Order. And further, that the price agreed-upon herein represents tl 1 cost anal value for the subject work performed and the materials supplied under the terms of the contract e work quantities and value were properly determined and are correct. 5--~ s =~i T CTOR (Authorized. Signature) Date RECOMMENDED BY: PPROVED B ~- - .S ~~ O'r/ - (ENGiNEER -Signature) Date OWNER (Authorized Signature) 5-28-49 Date EJCDC 1910-8-B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and. endorsed. by The Associated General Contractors of America and the Construction Specifications Institute. „ -, CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times shou d be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been. listed in the Agreement, any effect of a Change Order thereon. should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used.. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from. Owner, or both. Once Engineer has completed. and signed the form, all copies should. be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. 1 . MORRISOIV CHANGE PROPOSAL REQUEST ~~ MAIERLE,INC (Not a Change Order} Project: Bozeman WRF Phase 1 Improvements CPR No.: 007 CPR Date: 4/22/2009 Date Sent to Contractor: 4/22/2009 Date Recd from Contractor: TO: Williams Brother Construction Please furnish your proposal for executing the following change(s): Delete the requirement for coatings in accordance with Section 09905 involving the fermenter and two seconds clarifier mechanisms, and modify the mechanism construction materials to 304 and 304E stainless steel. Utilize 304E stainless steel on all welded members. NACE inspection will still be required on the tank coating itself, but any NACE inspection requirement for the mechanisms is removed. To Article 1.1 C. 3 : Delete reference to Section 09905-Painting and Protective Coatings. To Article 2.2: Add paragraph C: "C. Materials of construction for the fermenter mechanism shall be stainless steel 304 and 304E for all welded members." To Article 2.4 H 5: Delete in its entirety. To Article 2.4 I: Delete in its entirety. To Article 2.4: Add paragraph K: "K. Stainless steel welding procedure: 1. After welding, remove heat tint by an acidic brush-on paste or gel restoring the corrosion resistant properties of the stainless steel." To Section 11125: To Article 1.1 C. 4 ;Delete reference to Section 09905-Painting and Protective Coatings. To Article 1.2 A. 7: Delete reference to NACE standards. To Article 1.2 B. 3: Delete paragraph in its entirety. To Article 1.4. 6.2.1: Delete line in its entirety. To Article 2.2: Delete reference to "Steel ASTM A36" in paragraphs C, B, D, E. F, T, U. X and Y.2. Replace with reference to: "Stainless Steel 304 and 304E for all welded members." To Article 2.6 O: Delete in its entirety, replace with the following: "O. Stainless steel welding procedure: 1. After welding, remove heat tint by an acidic brush-on paste or gel restoring the corrosion resistant properties of the stainless steel." HDR/MMI '/""~` ~ "'"'"~~ Date: 4/22/2009 TO: HDR Engineering, Inc. /Morrison Maierle, Inc. Proposal: Cost 18 000 Credit (A time extension is no re fo is modification unless otherwise detailed and justified:) Contract Date ~~~s~o9 TO: Accepted/Not Accepted Accepted/Not Accepted HDR/MMI: Date Owner: Date 2 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Phase 1 Improvements -Change Order No MEETING DATE: 5/26/2009 RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign the change order. BACKGROUND: Attached is a copy, of change order number 1 for the above referenced project. This Change Order covers substituting stainless steel mechanisms for the two secondary clarifiers and the fermenter in lieu of steel as specified in the contract documents. The reason for making this change is that the substitution provides for long term maintenance cost savings for the facility (See attached memo for life cycle cost analysis). Stainless steel is not normally specified in this type of application as historically the costs have been too high, due to a number of factors the stainless steel option is favorably priced at this time. Please refer to the attached Change Order No. 1 and Change Proposal Request No. 007 for a detailed listing of the involved items and costs. No increase in contract time is being provided with this change. Overall this change order increases the contract amount by $18,000.00 from $36,362,223.00 to $36,380,223.00. This will reduce the contingency on the project from $4,172,000.00 to $4,154,000.00. The Substantial and Final Completion Contract Times are not changed. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. FISCAL EFFECTS: None ALTERNATIVES: Disapprove Respectfully submitted, Robert J. urray Jr., Pr sect Engineer Chuck Winn, Assistant City Manager Attachments: Change Order 1 & Resolution 4170 Report compiled on 5/20/09 s>~~ t''~w ea+°fi Memo -~°~ MORRISON '~ ~. ~, MAIERLE, arc. ~~~- ~-. To: Bob Murray 1=rom: James Nickelson Project: Bozeman WRF Phase 1 Improvements Project ~~ Tom Adams Date: April 20, 2009 HDR Job No: 00...88486-00123/4.1 Subject: Clarifier and Fermenter Mechanisms -Stainless Steel Option Williams Brother Construction, LLC has approached us to consider upgrading the two Secondary Clarifier and the Fermenter mechanisms to stainless steel. The increase in cost to the project would be $6,000 per mechanism, or a total of $18,000. The long term advantage is that these mechanisms would not need to be recoated as they would if the specified material is utilized. Stainless steel is not normally utilized in these applications, as it is normally cost prohibitive. It is our understanding that the supplier of the mechanism is in a position to provide the stainless steel mechanisms on this project at a much reduced cost due to the availability of stainless steel and the general state of the economy. The Contractor is also interested in pursuing this option to avoid potential coating issues that he has experienced on past projects. This substitution will greatly reduce maintenance costs associated with recoating the mechanisms. The mechanisms need to be recoated approximately every 20 years, at a total cost of approximately $165,000 plus the cost associated with shutting down and cleaning the basins and mechanisms. The present worth value of one coating at 20 years, based on $165,000 and 3% inflation, is $91,000, much more than the $18,000 investment for the upgrade. Actual present worth value is much more if shut down and cleaning costs are included and if a second coating at 40 years is included. The supplier is in need of a response this week in order to procure the materials to fabricate the assemblies at this cost. Please advise if this option should be pursued and we will proceed with a formal Change Proposal Request (CPR). HDR Engineering, Inc. 1715 S. Reserve Street Phone: 406-532-2200 Page 1 of 1 Suite C Fax: 406-532-2241 Missoula, MT 59801-4708 www.hdrinc.com Bozeman WRF Phase 1 Construction HDR Project No.: 88486 File No.: