HomeMy WebLinkAboutResolution 4165 Alteration/Modification of Contract with Envirocon Inc.COMMISSION RESOLUTION N0.4165
A .RESOLUTION OF THE CITY COMMISSION~OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH
ENVIROCON INC., MISSOULA, MONTANA.
WHEREAS, the City Commission did, on the 13th day of October 2008, authorize the City
Manager to utilized the Alternative Delivery Method to award the bid for the CMC East Main Depot Asbestos
Cleanup, to Envirocon, Inc., Missoula, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications andLor alterations to the contract between the City of Bozeman, a
municipal corporation, and Envirocon Inc., as contained in Change Order No. 1, attached hereto, be and the
same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract
change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such
signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular
session thereof held on the 11th day of May 2009.
G~`'~
Kaaren Jacobson, ayor
ATTEST:
Stacy UI en
City Clerk
APP.ROVED~ TO FORM:
~1'S'ullivan
Attorney
Commission Memorandum
REPORT TO:
FROM:
SUBJECT:
MEETING DATE:
Honorable Mayor and City Commission
Dustin Johnson, Project Engineer
Chris Kukulski, City Manager
CMC East Main Depot Asbestos Cleanup Contract Change Order #1
Underground Tank Cleanup
May 11, 2009
RECOMMENDATION: The Commission to make a motion to adopt.
BACKGROUND: On October 13~' 2008, Commission authorized the City Manager to utilize the
alternative delivery method for awarding the contract for the CMC East Main
Depot Asbestos Cleanup. On March 16`'', 2009 a contract with Envirocon Inc,
was signed and executed. The contract was for $1,261,5978.97. In negotiations
with DEQ it was agreed that they would reimburse the City 79% of all qualified
costs of the cleanup.
Early in the project an underground tank was found on one of the contaminated
lots. The tank was found to be contaminated with asbestos and needed to be
removed. Since the tank was not identified in the original scope of the contract a
change order was necessary. The DEQ deemed the tank cleanup and removal not
reimbursable and all costs associated would be picked up by the property owner.
Since Envirocon is contracted by the City, the change order is being administered
by the City but all costs will be reimbursed by the property owner.
FISCAL EFFECTS: The entire $3,100.00 change order will be reimbursed by the property owner .
ALTERNATIVES: Approve Change Order No. 1 as detailed below.
Respectfully submitted,
Dustin Johnson, Project Engineer Chris A. Kukulski, City Manager
cc: Stacy Ulmen w/orig. enclosures
Project File
Attachments: Change Order No. 1 (3 original copies)
Commission Resolution No. 4165
Report compiled on 5/5/09
),~ / (~
«~
CIIANGE ORDER
DATE OF ISSUANCE
4/20/2009
No. 001
EFFECTIVE DATE 4/1/2009
OWNER City of Bozeman CONTRACTOR Envirocon Inc.
Contract: Envirocon Contract No. 1476801
Project: CMC East Det~ot VCP OWNER's Contract No.
ENGINEER Tetra Tech ENGINEER's Contract No.
You are directed to male the following chanties in the ConU•act Documents:
Description: Remove, sample and dispose of unidentified [1ST uncovered at Story Property.
Reason for Change Order: Changed Condition per MPWSS General Condition 4.3.2
Attachments: Envirocon letter to Engineer with scope of work, pricing and assumptions.
CHANGE IN CONTRACT PR[CE:
Original Contract Price
$ 1,261,598.97
Net Increase (Decrease) from previous Change
Orders No. to
Contract Price prior to this Change Order:
$ 1,261,598.97
Net increase (decrease) of this Change Order:
$ 3 100.00
Contract Price with all approved Change Orders:
$ 1264 698.97
r~_rnr.tr~r. rrr ~~nr.r"r-n
~n~n~~~~~ ~r~r "rrn,t~
~r
~~~t~t ae-t =1=i+~tes~-
9
r~g
i
C~
~ I
~
}~I@t~fjn :
-~
ttt
lSl •, °cm~rcr iii-
c
v
l
;
~
)
~
-I`ccxl~~-~f'j}-ttttctt-~ii~~eF•}t:
'z ays e~elates}
i~et-cha+~~-f+e+~i-~e~ietts-C-i~aiige-Brc~ets-Alo. _ to
al
e.
--~ul~s~a~itial-Ea~r3~le•; ^~:
~o
cla
Eent+a,.. T„ro~ r ,• *„ +i„~ r-~~ar t~e-9~-der~
b
(,1
• f
al-
~
e
*
-R
d
f
ot
n
p
yy~
Er
:
ea
y-
fc#a ~~dat~;}
i~8t-1 HEf2t'~Se~G'E~2~itS2 j r l~ : `-irrr~~riiii'rb~8ff1@f=
~tt~is~ei~tial-Ea+~~Iet~e;i: ~
-i~
1
-f
-~
r
=r
n
2aE
~
Ot
Hi &
Puy'ire 1
~ tla~'S3
CAf~ti=c'iC-t~--11}l }$~ed --~chan~T2-gr dC'l=S=
~tt~s
-4~ea~y-fee-€rr~~i-t~iei; *:
f clads-or-dates
ConU•actor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or
omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set
forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein
represents the cost and value for the subject work performed and the materials supplied under the terms of the
contract a t t th ntities and value were pro erly determined and are correct.
,r ~._-~ ~ ~,~
CON" C"I'OR (Authorized Signature) to
RFt,Cy;~O'MMEN ED BY:
~ ~ 0 APP OVED B~':
~~~~
'~ - I ~ -o ~
(ENGINEER - Signat e) Da e O NER (Author' 'd Signature) Date
Page 1 of 1
~)lrr)
CHANGE ORDER
No. 001
DATE OF ISSUANCE 4/20/2009 EFFEC"I'IVE DATE 4/1/2009
OWNER City of Bozeman CONTRACTOR Envirocon, Inc.
Contract: Envirocon Contract No. 1476801
Project: CMC East Degot VCP OWNER's Contract No.
ENGINEER Tetra Tech ENGINEER's Contract No.
You are directed to make the following changes in the Contract Documents:
Description: Remove, sample and dispose of unidentified [JS`f uncovered at Story Property.
Reason for Change Order: Changed Condition per MPWSS General Condition 4.3.2
Attachments: Envirocon letter to Engineer with scope of work, pricing and assumptions.
CI-IANGE [N CONTRACT PRICE:
Original Contract Price
$ 1,261,598.97
Net Increase (Decrease) from previous Change
Orders No, to
Contract Price prior to this Change Order:
$ 1,261,598.97
Net increase (decrease) of this Change Order:
$ 3,100.00
Contract Price with all approved Change Orders:
$ I ,264,698.97
ru n rtn r. mt ~nrr rn n~i
~ ~,r
~c
_
r
~
9rl~+n-a~~ ~~r~~t/t~a~et-=f-ir~~es
~~ta~~-t't-it t'`V }~Iet'~n :
-Ready--fc~+=-f+naa--}~}~er~t:
ads-er-cdate-s~
NJet-EI~a+~ge-#~tet~re~ietts-C~a+~~e-9rt~et~-Alo. _ to
T~Ye • :
---~it~s~a~i~{-~a~p~et~e ,:
~a~o'. ~
y~~.,}.
.,.,
~
~a
~
,
~
~ eta
CC)~Lrt2n* T;.,,o~ .. .. *., *I,;~ r'
e{ tAi~:
r-f
f~
d
f
al-
* tiu~be-BfE{ef'_
~ea
;
ee
tTr
pay;~~en
:
Net-i~~e-rease-(de^~ n~ *~,;~, r-
e ~~n"°~Tni~~t~Ie~+t=n
-Read
--f aI-
ei ~9 t,,,.,,.o n+det:-
b
er
p~ ~~53
Eent+a~* ~~•.,-,o~ . ,:*i, „i~ ., .,re
l-C
l~
-~
~
t-
tT vel-~1t~at~ge-9rders:
t+
s
a~
a
etr}p
e
Edaj`s-er-date-sj
Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or
omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set
forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein
represents the cost and value for the subject work performed and the materials supplied under the terms of the
contract a t t th ~ ntities and value were pro erly determined and are correct.
f' ~G (5'
CON` C'fOR (Authorized Signature} to
2~OMMEN F,D BY: ~ APP OVED B~':
~'
'~ ~~ ~-off
(ENGINEER - Signat e) Da c O NER (Author' 'd Signature) Date
Page 1 of 1
Matthew Culpo, Project Engineer
Tetra Tech
303 Irene Street
Helena, MT 59601
ENVIROCON, INC.
101 International Way
P.O. BOX 16655
MISSOULA, MT 59808-6655
(406) 523-1150
(406) 543-7987 FAX
www.envirocon.com
Envirocon, Inc proposed cost to remove the UST at the Story Property in Bozeman, MT.
is LS for $3,100.00. The cost is for the additional resources associated with the UST
removal outside the scope of the existing contract. Because the licensed UST removal
personnel is not asbestos trained, Envirocon personnel will be doing all the work inside
the exclusion zone as directed by the licensed UST remover, i.e. sampling liquid in the
tank, below tank soil sampling, and handling the hoses while the tank is being pumped.
Cost is also included for the operated excavator to excavate and remove the tank, for
loading the tank on a trailer and poly wrapping (same as the dump trucks), for
transporting the tank for disposal at the existing land fill, and for unloading and crushing
the tank with the tracked loader before backfilling with daily cover.
Below are the assumptions in developing the costs.
• Panhandler Geotechnical & Environmental to provide licensed UST removal
personnel and UST removal permit.
• Panhandler Geotechnical & Environmental to sample and dispose of liquid in
tank.
• Panhandler Geotechnical & Environmental to sample below tank after removal.
• Envirocon to dispose of tank in exiting landfill. Tank is 2000 gallon ~ 10 CY for
disposal quantities, before crushing.
• Cost assumes excavating only asbestos below the removed UST.
• No costs included for disposal of TPH soils, if present below tank.
• No costs for permits.
• All other costs associated for tank removal are included in existing line items, i.e.
backfill, etc.
If you need any further assistance, please let me know.
Sincerely,
Electronic Signature
Leonard Pickett, Project Manager
~~
A Washington Carnpany