Loading...
HomeMy WebLinkAboutCMC East Main Depot Asbestos Cleanup, Envirocon Contract Change Order #1.!!(r~ °+ CHANGE ORDE12 No. 001 DATE OF ISSUANCE 4/20/2009 EFFECTIVE DATE 4/1/2009 OWNER City of Bozeman CONTRACTOR Envirocon, Inc. Contract: Envirocon Contract No. 1476801 Project: CMC East Depot VCP OWNER's Contract No. ENGINEER Tetra Tech ENGINEER's Contract No. You are directed to male the following changes in the Contract Documents: Description: Remove, sample anal dispose of unidentified [1ST uncovered at Story Property. Reason for Change Order: C1langed Condition per MPWSS General Condition 4.3.2 Attachments: Envirocon letter to Engineer with scope of work, pricing and assumptions. CI-IANGE IN CONTRACT PRICE: Original Contract Price $ 1,261,598.97 Net Increase (Decrease) from previous Change Orders No. to Contract Price prior to this Change Order: $ 1,261,598.97 Net increase (decrease) of this Change Order: $ 3,100.00 Contract Price with all approved Change Orders: $ I ,264,698.97 ru n ~.r~ r: r~.t ~n rr"rn n (''T Trn~rrr c : irucc-r-irrrc`s. -~tt135a: a~tt i al-Ce+~Iettf~ii 'Mays er-c#at~~} ~I@~-c-I3atl~e-ft9H~Fe~-teNS-C-~+i~-B~der~-4~je. _ to Ia[e. _ ---SE+~s~ant+~i~p~etEe ;: -~Z-ea~fe a }t ~ et : } da t'C7t~tfac.* T~.,.. o~ ,~ ,. t„ rr~~.. ~t~~s~at~~Plet-ten: -Read -€e #i ~I * !`h.,„,.,, nfEIC'+- b y t i ~Ry~~tetT : c1a s-c>+-dat~I Iale~-t tlC-rease-(d,~ „~ +r, ; ~, --Re f d r~ l r r, r~ ,,., ,.o n r~e+'_ b ~ a ~ e ~ -p~}~e~ - days3 C-ent~ae~l=ice -~t+bst-are ti a1-C © ~r let+ t~et-s- + p a~ -Rea~ ~-fer--f+t~al-- ~ +~ret~': y p y [days e~ dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents the cost and value for the subject work performed and the materials supplied under the terms of the contract a t t th ntities and value were pro erly determined and are correct. .~ ./ / ~ ~ f CON ~CCTOR (Authorized Signature) RFj~~OMMt1EN~ED BY: APP OVED B~': ~ ~ o ~- 5 - I I --Q (ENGINEER - Signat e) Da e O NER (Author' 'd Signature) Date Page 1 of 1 Commission Memorandum REPORT TO: FROM: SUBJECT: MEETING DATE: Honorable Mayor and City Commission Dustin Johnson, Project Engineer Chris Kukulski, City Manager CMC East Main Depot Asbestos Cleanup Contract Change Order # 1 Underground Tank Cleanup May 11, 2009 RECOMMENDATION: The Commission to make a motion to adopt. BACKGROUND: On October 13`~ 2008, Commission authorized the City Manager to utilize the alternative delivery method for awarding the contract for the CMC East Main Depot Asbestos Cleanup. On March 16"', 2009 a contract with Envirocon Inc, was signed and executed. The contract was for $1,261,5978.97. In negotiations with DEQ it was agreed that they would reimburse the City 79% of all qualified costs of the cleanup. Early in the project an underground tank was found on one of the contaminated lots. The tank was found to be contaminated with asbestos and needed to be removed. Since the tank was not identified in the original scope of the contract a change order was necessary. The DEQ deemed the tank cleanup and removal not reimbursable and all costs associated would be picked up by the property owner. Since Envirocon is contracted by the City, the change order is being administered by the City but all costs will be reimbursed by the property owner. FISCAL EFFECTS: The entire $3,100.00 change order will be reimbursed by the property owner . ALTERNATIVES: Approve Change Order No. 1 as detailed below. Respectfully submitted, Dustin Johnson, Project Engineer Chris A. Kukulski, City Manager Attachments: Change Order No. 1 (3 original copies) Commission Resolution No. 4165 Report compiled on 5/5/09 cc: Stacy Ulmen w/orig. enclosures Project File COMMISSION RESOLUTION NO. 4165 A .RESOLUTION OF THE CITY COMMISSION~OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH ENVIROCON INC., MISSOULA, MONTANA. WHEREAS, the City Commission did, on the 13th day of October 2008, authorize the City Manager to utilized the Alternative Delivery Method to award the bid forthe CMC East Main Depot Asbestos Cleanup, to Envirocon, Inc., Missoula, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and[or alterations to the contract between the City of Bozeman, a municipal corporation, and Envirocon Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 11th day of May 2009. Kaaren Jacobson, ayor ATTEST: Stacy UI en City Clerk APPROVED TO FORM: Ilivan Attorney