CMC East Main Depot Asbestos Cleanup Contract Change Order #3
Fence replacement on Empire property
May 18, 2009
RECOMMENDATION: The Commission to make a motion to adopt.
BACKGROUND: On October 13th 2008, Commission authorized the City Manager to utilize the
alternative delivery method for awarding the contract for the CMC East Main
Depot Asbestos Cleanup. On March 16`", 2009 a contract with Envirocon Inc,
was signed and executed. The contract was for $1,261,5978.97. In negotiations
with DEQ it was agreed that they would reimburse the City 79% of all qualified
costs of the cleanup.
It was discovered that an existing fence located on the Empire property was
placed in asbestos contaminated soil. The concrete anchoring the posts was
poured and buried in asbestos soils. In order safely mitigate the site the fence
needs to be removed and replaced.
FISCAL EFFECTS: The entire $14,432.50 change order will be included with the costs of the
CMC cleanup and will be eligible for the 79% reimbursement.
ALTERNATIVES: Approve Change Order No. 3 as detailed below.
Respectfully submitted
t /„
n
Dustin Johnson, P sect Engineer
cc: Stacy Ulmen w/orig. enclosures
Project File
Chuck Winn, Assistant City Manager
Attachments: Change Order No. 3 (3 original copies)
Commission Resolution No. 4169
Report compiled on 5/12/09
,`~
ChIANG~ OIZDI/R
No. 003
DATE OF ISSUANCE 4/22/2009 E1~FEC'I'IVE DATE 4/22/2009
OWNER City of Bozeman CONTRACTOR Envirocon, Inc.
Contract: Envirocon Contract No. 1476801 _
Project: CHIC East Depot VCP OWNER's Contract No. __
ENGINEER Tetra 't'ech ENGINEER's Contract No.
You are directed to make the following changes in the Contract Documents
Description: Engineer requested change in project specifications
Reason for Change Order: Changes in the Work per MPWSS General Condition 10.1.
Attachments: Envirocon letter to Engineer with scope of work, pricing and assumptions.
CHANGE IN CON'rRAC"f PRICE:
Original Contract Price
$ 1 26l 598.97
Net Increase (Decrease) from previous Change
Orders No. 1 to 2 •
$ 40 100.00
Contract Price prior to this Change Order:
$ 1.301,698.97
Net increase (decrease) of this Change Order:
$ 14,432.50
Contract Price with all approved Change Orders:
$ 1 316 131.47
~Irr: lT.i!-'/l1.iTTJ
.I=l~
i ~(~T'T'TT~fC'C,
t-
-
tY b~t}ai'tVtYtfatt-Y'YtttE''
--~t+bsta~ttial-C-~t~Ietie
,'~8yti-0f Ct&Tt'i)
?atet-El~a+ ~e-€ra+~r-e~ieus-C-In~+~ge~-9tc~er 'ate
~~
v
~~tbst~r~tia-l-Eet~~let~e
-I~ea~~~ €+nal-~~-rimer-r~.
CC7RLS"C[GT-Y't'F~~S-~`••ri 1~ t~~~n ~'I~,n
--~u~4*,..~a~na~t~let~ . ~~n
-Dead-y--tern-~alta .,+.
'dat~~e~dat~
", r.~-rn~se-(d~_. _~ „~~;~nn „se-9}-tier
~t+k~st-at~ti~l-fie
~-ead3+-fer-l=t~al-pa~r~et~':
(~~Yy)
Eent~ae~i}~r~l~-aTl-aP~te~+e
t d-C--hanb 9tx#e~s=
~t~te
+a
---Read~e~er~t:
(<ia~~ i~ia~}
Contractor certifies and agrees that there are no additional costs or claims for extra work, additiona( time, delays or
omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set
forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein
represents t~~ull cost and value for the subject work performed and the materials supplied under the terms of the
contract ar~d gat the work quantities and value were properly determined and are correct.
C - ~'RACTOR (Authorized Signature) ate
ZECOMMENDED BY- APPROVED BY:
_ ~ o ~` ~.~
( ~ i EER - Signa ure) D rt OWNER (Authorized Signature)
S-~$-o9
Date
Page 1 of 1
~~
ENVIROCON, INC.
101 International Way
P.O. BOX 16655
MISSOULA, MT 59808-6655
(406) 523-1150
(406) 543-7987 FAX
www.enviracon.com
Matthew Culpo, Project Engineer
Tetra Tech
303 Irene Street
Helena, MT 59601
Envirocon, Inc proposed price to remove and replace the 7' chain link fence and gate
bordering the Empire property is $49.55 per LF up to 250 LF ($12,387.50) for the fence
and $2,045.00 for the gate. Because the concrete anchoring the post is buried in
potential asbestos soils they will be disposed of in the existing landfill. The posts and
fence wire will be disposed of in an approved facility or recycled, if possible. The
existing fence location will be measured by onsite personnel in relationship to existing
structures and reinstalled in the same location. Payment will be for installed feet and
one gate.
Sincerely,
Electronic Signature
Leonard Pickett, Project Manager
`?~: