Loading...
HomeMy WebLinkAboutCMC East Main Depot Asbestos Cleanup Envirocon Contract Change Order #3Commission Memorandum REPORT TO: FROM: SUBJECT: MEETING DATE: Honorable Mayor and City Commission Dustin Johnson, Project Engineer Chuck Winn, Assistant City Manager CMC East Main Depot Asbestos Cleanup Contract Change Order #3 Fence replacement on Empire property May 18, 2009 RECOMMENDATION: The Commission to make a motion to adopt. BACKGROUND: On October 13th 2008, Commission authorized the City Manager to utilize the alternative delivery method for awarding the contract for the CMC East Main Depot Asbestos Cleanup. On March 16`", 2009 a contract with Envirocon Inc, was signed and executed. The contract was for $1,261,5978.97. In negotiations with DEQ it was agreed that they would reimburse the City 79% of all qualified costs of the cleanup. It was discovered that an existing fence located on the Empire property was placed in asbestos contaminated soil. The concrete anchoring the posts was poured and buried in asbestos soils. In order safely mitigate the site the fence needs to be removed and replaced. FISCAL EFFECTS: The entire $14,432.50 change order will be included with the costs of the CMC cleanup and will be eligible for the 79% reimbursement. ALTERNATIVES: Approve Change Order No. 3 as detailed below. Respectfully submitted t /„ n Dustin Johnson, P sect Engineer cc: Stacy Ulmen w/orig. enclosures Project File Chuck Winn, Assistant City Manager Attachments: Change Order No. 3 (3 original copies) Commission Resolution No. 4169 Report compiled on 5/12/09 ,`~ ChIANG~ OIZDI/R No. 003 DATE OF ISSUANCE 4/22/2009 E1~FEC'I'IVE DATE 4/22/2009 OWNER City of Bozeman CONTRACTOR Envirocon, Inc. Contract: Envirocon Contract No. 1476801 _ Project: CHIC East Depot VCP OWNER's Contract No. __ ENGINEER Tetra 't'ech ENGINEER's Contract No. You are directed to make the following changes in the Contract Documents Description: Engineer requested change in project specifications Reason for Change Order: Changes in the Work per MPWSS General Condition 10.1. Attachments: Envirocon letter to Engineer with scope of work, pricing and assumptions. CHANGE IN CON'rRAC"f PRICE: Original Contract Price $ 1 26l 598.97 Net Increase (Decrease) from previous Change Orders No. 1 to 2 • $ 40 100.00 Contract Price prior to this Change Order: $ 1.301,698.97 Net increase (decrease) of this Change Order: $ 14,432.50 Contract Price with all approved Change Orders: $ 1 316 131.47 ~Irr: lT.i!-'/l1.iTTJ .I=l~ i ~(~T'T'TT~fC'C, t- - tY b~t}ai'tVtYtfatt-Y'YtttE'' --~t+bsta~ttial-C-~t~Ietie ,'~8yti-0f Ct&Tt'i) ?atet-El~a+ ~e-€ra+~r-e~ieus-C-In~+~ge~-9tc~er 'ate ~~ v ~~tbst~r~tia-l-Eet~~let~e -I~ea~~~ €+nal-~~-rimer-r~. CC7RLS"C[GT-Y't'F~~S-~`••ri 1~ t~~~n ~'I~,n --~u~4*,..~a~na~t~let~ . ~~n -Dead-y--tern-~alta .,+. 'dat~~e~dat~ ", r.~-rn~se-(d~_. _~ „~~;~nn „se-9}-tier ~t+k~st-at~ti~l-fie ~-ead3+-fer-l=t~al-pa~r~et~': (~~Yy) Eent~ae~i}~r~l~-aTl-aP~te~+e t d-C--hanb 9tx#e~s= ~t~te +a ---Read~e~er~t: (<ia~~ i~ia~} Contractor certifies and agrees that there are no additional costs or claims for extra work, additiona( time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents t~~ull cost and value for the subject work performed and the materials supplied under the terms of the contract ar~d gat the work quantities and value were properly determined and are correct. C - ~'RACTOR (Authorized Signature) ate ZECOMMENDED BY- APPROVED BY: _ ~ o ~` ~.~ ( ~ i EER - Signa ure) D rt OWNER (Authorized Signature) S-~$-o9 Date Page 1 of 1 ~~ ENVIROCON, INC. 101 International Way P.O. BOX 16655 MISSOULA, MT 59808-6655 (406) 523-1150 (406) 543-7987 FAX www.enviracon.com Matthew Culpo, Project Engineer Tetra Tech 303 Irene Street Helena, MT 59601 Envirocon, Inc proposed price to remove and replace the 7' chain link fence and gate bordering the Empire property is $49.55 per LF up to 250 LF ($12,387.50) for the fence and $2,045.00 for the gate. Because the concrete anchoring the post is buried in potential asbestos soils they will be disposed of in the existing landfill. The posts and fence wire will be disposed of in an approved facility or recycled, if possible. The existing fence location will be measured by onsite personnel in relationship to existing structures and reinstalled in the same location. Payment will be for installed feet and one gate. Sincerely, Electronic Signature Leonard Pickett, Project Manager `?~: ,~ Uttashirrr,Jeon Cc~n~p~=any ~'y-.',