Loading...
HomeMy WebLinkAboutApprove Resolution No.4170, Alteration of Contract with Williams Brother Co., Change Order No. 1 WRF, Phase 1 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 1 MEETING DATE: 5/26/2009 RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign the change order. BACKGROUND: Attached is a copy, of change order number 1 for the above referenced project. This Change Order covers substituting stainless steel mechanisms for the two secondary clarifiers and the fermenter in lieu of steel as specified in the contract documents. The reason for making this change is that the substitution provides for long term maintenance cost savings for the facility (See attached memo for life cycle cost analysis). Stainless steel is not normally specified in this type of application as historically the costs have been too high, due to a number of factors the stainless steel option is favorably priced at this time. Please refer to the attached Change Order No. 1 and Change Proposal Request No. 007 for a detailed listing of the involved items and costs. No increase in contract time is being provided with this change. FISCAL EFFECTS: Overall this change order increases the contract amount by $18,000.00 from $36,362,223.00 to $36,380,223.00. This will reduce the contingency on the project from $4,172,000.00 to $4,154,000.00. The Substantial and Final Completion Contract Times are not changed. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. ALTERNATIVES: Disapprove Attachments: Change Order No. 1 & Resolution No. 4170 Report compiled on 5/20/09 38 COMMISSION RESOLUTION NO. 4170 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 26th day of May 2009. __________________________________________ KAAREN JACOBSON Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________ GREG SULLIVAN City Attorney 39 40 41 42 43 44