HomeMy WebLinkAboutBID Minutes 1-21-09
Downtown Business Improvement District
Board Meeting Minutes
1/21/2009
Present
: Mike Basile, Eric Bowman, Dan Harding, Dan Himsworth, Ileana Indreland,
Kaaren Jacobson, Chris Naumann and Ellie Staley
Absent
: Buck Taylor
Eric calls the meeting to order.
Public comments
None
Minutes
ACTION: Mike Basile motions to accept the minutes from 11/19 and 12/17.
Ileana Indreland seconds the motion.
All vote in favor
Financial Report
rdth
Chris reported that he invoiced the City of Bozeman for both the 3 and 4 quarter assessment
payments which total $57,000.00. He expects that income payment to be received before the
end of January.
Other financial activity this month included the expected maintenance expenses plus some final
expenses associated with the removal of the Holiday decorations.
The board asked if Chris anticipated any expenditure related to the light pole banners. Chris
said he expects that some of the winter banners will need to replaced once they come down this
spring.
Executive Director’s Report
Business Improvement District Board
st
January 21 2009
Holiday Light Update
Once the Christmas Spiders where taken down, I was able to inventory some necessary repairs
for next year. We will need to invest approximately $500 in garland to replace damaged
sections. There is one vertical pole that has yet to be rewired, which will cost around $500.
Service Electric made several recommendations regarding the intersection wiring. First, the
plugs at each intersections are quite old and not to code. Replacing the antiquated plugs with
code approved weatherproof ones would run about $400 per intersection ($1600 total). He also
noted that the wiring that runs along the support cables is starting to show considerable wear.
He estimated that replacing the wiring at each intersection would cost about $1000 ($4000
total).
I will take this potential upgrade costs into account when I draft next year’s budget. One option
would be to replace the plugs and wiring at two intersections next year ($2800-$3000) and
replace the remainder the following year.
Parking Garage
Considerable progress is being made at the garage site. Martel is completing the retail shell in
the next few weeks with the installation of the final brick work and last windows. Upon
completion, tenant improvements can begin taking place at the owner’s discretion. Work on the
stair towers is continuing with the installation of the exterior windows and the two elevators. The
nd
parking control equipment will be installed by the manufacturer the week of February 2.
The prominent crack on the main deck is still an issue of concern. The new City Building
Inspector and the structural engineer are discussing the options for repairing the crack.
Downtown Improvement Plan
The Downtown Improvement Plan Advisory Committee selected the team of consultants led by
LMN Architects of Seattle, Washington.
The LMN team includes the following members:
Mark Hinshaw and Walt Neihoff, LMN Architects, Seattle WA (specializing in architecture, urban
design and master planning)
David Leland, Leland Consulting, Portland OR (specializing in economic and market analysis
plus implementation feasibility)
Randy Hafer, High Plains Architecture, Billings MT (specializing in historic architecture and
adaptive reuse)
David Crawford, Thomas, Dean and Hoskins Engineering, Bozeman MT (specializing in traffic
and streetscape engineering)
The planning process will include background research, analysis of existing conditions, public
input and stakeholder interviews, presentation of a draft plan, further public input, and
formulation of a final plan. The LMN team will begin working on the project in February. We
anticipate having a final plan for review and adoption no later than July 1, 2009.
Sublease and Office Improvement Update
The improvements to the sublease office space were completed last week. The completion was
delayed as a piece of tempered glass had to be ordered.
th
On Monday, January 19, I sent an “advertisement” that we have the space available for lease
to the downtown e-mail list serve (over 300 recipients). If I do not receive any inquiries, I will
place a classified ad in the Bozeman Daily Chronicle the first week in February.
Business Seminar Series
The Downtown Bozeman Partnership and MSU Extended University Leadership Program will
present a business leadership seminar series: January 20, 27, and February 3. The three
seminars will focus on productivity, customer service and business improvement. The seminar
series will be facilitated by Paul Bentley, Program Director and Instructor for the Leadership
Program at MSU’s Extended University. He has 18 years of leadership experience in private
industry, government, and non-profit.
Montana Downtown Conference
The Downtown Partnership will be hosting the Montana Downtown Conference May 7 and 8,
2009. The annual conference is a gathering of downtown organizations from around the region
to discuss current issues, learn from one another and network. Billings hosted the 2008 event
and Missoula will be the host in 2010.
Several items from the Executive Director’s report were discussed.
Chris added to his parking garage update that Martel Construction is planning to reopen Black
and Tracy Avenues in the first week of February.
Regarding the Downtown Improvement Plan, Chris said he would put together a summary of the
project (and process) to date for all of the downtown boards.
The board suggested listing the office sublease on Craig’s List.
Discussion and Decision Items
Maintenance Proposal
Chris outlined the previously discussed idea of hiring a full-time, year-round maintenance
employee. One way to pay for the increased costs associated with a full-time maintenance
employee would be to reinvest the money historically spent on the flower watering contract.
Chris emphasized that a full-time employee would allow a wider assortment of “clean and safe”
services to be offered on a consistent basis.
One area of service that would be greatly enhanced would be graffiti removal. The board
expressed some confusion about the graffiti removal program: who cleans the graffiti and how
often? Chris explained that graffiti removal has proved difficult with the current part-time staff
that does garbage collection. They typically have another full-time job and just work downtown
for 2-3 hours a day. The board discussed having a graffiti “hot-line” phone number or e-mail
address that property owners could report tags. Chris stressed that if the BID had a full-time
maintenance we wouldn’t need a “hot-line” because the tags would be removed before most
owners would ever see them.
Chris gave an overview of the financials of a full-time program. In essence, supplementing the
existing maintenance budget with the watering contract money would fund full-time maintenance
for the entire year. Chris noted that this would include an additional part-time employee during
the busy summer months, which would insure that the flower get watered 7 days a week.
The board asked Chris to provide them with a formal written proposal for them to consider and
base their decision. Eric Bowman asked when the board would need to decide in order to start
a full-time program. Chris said he would need a decision from the board at either the February
or March meeting.
Off-Main Property Benefits
Chris informed the board that he had received some calls about what the BID does for
properties within the district that are not on Main Street. The board mentioned that having a full-
time maintenance person would allow the BID to extend more services “off Main”.
With no new or old business to discuss, the meeting was adjourned.