HomeMy WebLinkAboutStory Mansion Change Order No. 1, R & R Taylor, 2009. ~ TM
~== Document G701 - 2aa1
Change Order
PROJECT (Name acrd address):
City of Bozeman -Story Mansion
Interior Renovation
8l 1 S. Willson Ave.
Bozeman, MT 597 I S
CHANGE ORDER NUMBER: 001
DATE: February 03, 2009
OWNER:
ARCHITECT:
CflNTRACT4R;
~IELa: ^
OTHER: ^
TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 08-02
R&R Taylor Construction, hie CONTRACT DATE: January 07, 2009
P.Q. Box 1234 CONTRACT FOR: General Construction
Bozeman, MT 5977! - 1234
THE CONTRACT IS CHANGED AS FOLLOWS:
(IrrtrCrrde, inhere applicable, arry undrs/ruler! umamrt critrrbtrtabfe to /ar•caiarsly erecured Ctrrrstrttctiarr Change L)irr'crrver)
Change Qrder Request associated with Proposal Request 002 - to provide ?.S~fn inhibit glycol for the heating water system
The origins] Contract Sum was $ 1,071,24.2.00
T7ie net change by previously authorized Change Orders $ ~~ 0.00
Tlic Contract Sum prior to this C.hangc Order was $ 1,071,242.00
The ConU•act Sum will be increased by this Change Qrder in the amount of $ 932.80
The new Contract Sum including this Change Qrder will be $ I ,072,174.80
The CauU•act Time will be increased by Zero (0) days.
The date of Substantial Completion as of Qie date of this Change Order therefore is
NOTE: This Change Order does not include changes in the Contract Sutn, Contract Timc or Guaranteed Maximum Price which
have been authorized by Crnistrirction Change Directive until the cost and time have been agreed upon by both the Qwner and
Contractor, in which case a Change Qrder is executed to supersede the Construction Change. Directive.
NOT VALIO UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Comma-Q Architecture, Ina R&R Taylor Construction, Inc City o(' Bozeman
ARCHITECT (Finn name) CONTRACTOR (Finn Warne) OWNER {Firer Warne)
109 N Rouse Ave, # I ,Bozeman, MT P.Q. Box 1234, Bozeman, MT 59771- P.O. Box 1230, Borman, MT 59771
RESS -- .-~~ -___.
Y (Sigaaahue) .~-_~~~--
James Goehrung
(7}sped aacrnae)
DATE
AIA Document 6701 TM' - 2lN)1. l;opyright ®1979, 1967, 2000 and 2001 by The American Institute of Architects. AIt rights reserved. WARt~IINC: Ttris AtA"
Doearoent is pratacted ~y t1.S. Copyright Lbw and tnSernatlarrat Trestles. Unaufhanzed reproduction ar dtstrlbutian at this AtA~ Docranient, ar any .
portion of it, [nay result in severe ct4tt and oNrninat penelttas, and vvitl ire prosecuted to the maximum extent passible under the ieva~ This documont
was produced by AIA software a1 10:06:16 on 02lOAl2009 under Order No.t1700379510_1 which expires on 11/25/2009, and is not for resale,
User Notes: (1930815116)
Patrick I,arum Russell L. Qlseu
(7yyped ncnne) (7yped name}
DATE DATE
Change Order Re uest
q
Proposal Request #002
CONSTRt1CTlUN INS.
To: Date: 01126!09
Job Number: 2008-015
CUMMA-Q ARCHITECTURE, INC.
109 N ROUSE AVC. #I l Job Name: STORY MANSION
B071~MAN, MT S9715
Date Accepted By: 2103!09
Vt~e hereby agree to make the change(s) specified below: `------- --_.__-_.____ .Wr.._.___.___.~..__. _--------
I Iii' C'"1N-f[2d~C`~I'C)ti ~1(t~l.L !'ROVII)E A ?~4-o IN}11F31`t' Gl.~r''CC71.. ~~f)R ~l lll-: [lf_.:1T1NCi 41A~~ER
4YS`t"ta1~1. [N111t311~1U (:;1_,Yt~'C)t. PI1 ~(#AL_I EE, C'OOR171N~ 1-1?I~ ! U T! 1(~ .%~P['RO1.'Ri.~ I C 1_,I:~;VF1. l~(:)R
_ _____~ -- _ -___ _.-__. _____ -------___.-- ___1
13t>IL-E?[Z {11~:A'( F~XC:II~NUER. ~~PI'Rt)X1Mi11°E HEs\T1NC~ W~1~TL1~ ~YSI k~i~'1 ~~t>l lJ~°11:, IS (~0 1
E.-------------_..~_-.____________-_____ ~ ___v..~____---- _.__.--------- __~-..
Ciitl,(-,(1Nti 't9ateritrl `S>: i
Lahar i~0
t ii"tlt'.t~l) kZec~. 1 i t1
t)v~rrh.u~i <~: P~~rlit 1~"> {('tr~7t~<1i•tc~ri
Please sign and return one copy to our office immediately.
Sub ~["otal of Above $880.00
&% Contact Management Iiee $52.80
Total Change Order Request $932.80
The Contract _~" ~e will be increased _ _ 0 days.
rr'
~.~ ..
~~; -~_
12 & R Tay~nsh•uctiou Inc. t Date
~..___
• •
1 ll~~1S
Plumbing • Heating ®Utilities
Integrity Commitment • Community
January 26, 2009
R&R Taylor Canstructian
Attn: Russ Olsen
PO Box 1234
Bozeman, MT 59711
FAX # 406.586.7508
Story Mansion Renovation #$637
RFP 001 -Add Glycol to Heating System
Add 25% glycol solution to the 60 gallon capacity heat system. A credit for the original ET-1 is
included.
Subcontractors:
HVAC-100
TEMP CONTROLS-101
TEST t~ BAL-102
1NSUL.-105
FIRE SPRINKLER-106
Subtotal-Subs
Overhead Subs
Subtotal-Subs-w OH
Profit Subs
Subtotal-Subs-w OH & Profit
Material
Labor
Direct Jab Costs
Subtotal
Overhead
Subtotal w OH
Profit
Subtotal w OH & Profit
Subtotal Subs & Material, Labor, Direct Jab Costs
BOND
GROSS REC TAX
rota i
Sincerely
~LIC~Ie ~1IG~Bt5617
Project Manager
10.00% -
5.00% -
533
Hours 2 90
12.
635
10.00°Jo 63
698
5.00% 35
733
733
0.00% -
0.00% -
733
Williams Plumbing, Heating Utilities, Inc. 80X t0 2i 31 Industrial Drive Bozeman, MT 59715
406587-0969 FAX 406-585-9458