HomeMy WebLinkAboutStory Mansion Change Order No. 7, R&R Taylor® TM ~~: Docu ment G701 - 2001 Change Order PROJECT (Name and address): City of Bozeman -Story Mansion Interior Renovation 811 S. Willson Ave. Bozeman, MT 5971.5 CHANGE ORDER NUMBER: 007 DATE: February 20, 2009 OWNER: ARCHITECT: CONTRACTOR: FIELD: ^ OTHER: ^ TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 08-02 R&R Taylor Construction, Inc CONTRACT DATE: January 07, 2009 P.O. Box 1234 CONTRACT FOR: General Construction Bozeman, MT 59771-1234 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Provide and install the following in Prep Area/Servery 113: Remove existing drywall and plaster finishes at south, north and west walls. Provide R21 ball insulation at all exterior walls. Finish south, north and west walls with GWB, prep'ed to receive FRP See PR #008. The original Contract Sum was $ 1,071,242.00 The net change by previously authorized Change Orders $ 21,602.66 The Contract Sum prior to this Change Order was $ 1,092,844.66 The Contract Sum will be increased by this Change Order in the amount of $ 3,748.48 The new Contract Sum including this Change Order will be $ 1,096,593.14 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Comma-Q Architecture, Inc. R&R Taylor Construction, Inc ARCHITECT (Firm name) CONTRACTOR (Firm name) 109 N Rouse Ave, #1, Bozeman, MT P.O. Box 1234, Bozeman, MT 59771 59715 1234 ADDRESS A BY (Signature) (Si lure) Ben Lloyd (Typed name) ~~~ DATA Russell L. Olsen (Typed name) DATE City of Bozeman OWNER (Firm name) P.O. Box 1230, Bozeman, MT 59771 A D S$ 6 (Signature) James Goehrung (Typed name) a~~ g, aoo DATE AIA Document G701 T"" - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:08:44 on 02/24/2009 under Order No.1000388712_1 which expires on 2/17/2010, and is not for resale. User Notes: (1491057943) f .. Change O~de~ Request Proposal Request #008 ^ ^ eorvsTrruc~koN inc. To: Date: 02/16/09 Job Number: 2008-015 COMMA-Q ARCHITECTURE, INC. 109 N ROUSE AVE. #1 Job Name: STORY MANSION BOZEMAN, MT 59715 Date Accepted By: 1 /29/09 We hereby agree to make the change(s) specified below: 660 SQ FT ROCK ---DEMO. 9 HRS $35.00=$342.00 X 1 ~%_ X393.30 ---DUMP FEES $80.00 X l 5%= $92.00 ---INSULATE (SUB CONTRACTOR) $110.00 X 20%= $132.00 ---SHEETROCK LABOR $330.00 MATERIAL $330.00 = $660.00 X 15°~0- x,759.00 ---TAPE, (SUB CONTACTOR) $1800.00 X 20°,%= $2,160.00 Please sign and return one copy to our office immediately. Sub Total of Above $3,536.30 6% Contact Management Fee $212.18 Total Change Order Request $3,748.48 The C~tract Time will be increased 0 days. R&R Inc.