Loading...
HomeMy WebLinkAboutStory Mansion Change Order No. 6, R&R Taylor-.~• ® TM =~== Document G701 - 2001 Change Order PROJECT (Name and address): City of Bozeman -Story Mansion Interior Renovation 811 S. Willson Ave. Bozeman, MT 59715 TO CONTRACTOR (Name and address) CHANGE ORDER NUMBER: 006 DATE: February 20, 2009 OWNER: ARCHITECT: CONTRACTOR: FIELD: ^ OTHER: ^ ARCHITECT'S PROJECT NUMBER: 08-02 R&R Taylor Construction, Inc CONTRACT DATE: January 07, 2009 P.O. Box 1234 CONTRACT FOR: General Construction Bozeman, MT 59771-1234 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Provide and install additional structural items per direction in RFIs #1.1, 1.2, 1.3 & 3.1, documenting unforseen conditions behind finished ceilings and walls. See PR #006. The original Contract Sum was $ 1,071,242.00 The net change by previously authorized Change Orders $ 16,768.47 The Contract Sum prior to this Change Order was $ 1,088,010.47 The Contract Sum will be increased by this Change Order in the amount of $ 4,834.19 The new Contract Sum including this Change Order will be $ 1,092,844.66 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Comma-Q Architecture, Inc. R&R Taylor Construction, Inc City of Bozeman ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 109 N Rouse Ave, #1, Bozeman, MT P.O. Box 1234, Bozeman, MT 59771- P.O. Box 1230, Bozeman, MT 59771 59715 1234 _ RESS n _ ~'I _ \ BY (Signature) James Goehrung (Typed name) D DATE AIA Document G701 TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:08:11 on 02/24/2009 under Order No.1000388712_1 which expires on 2/17/2010, and is not for resale. User Notes: (1438825949) Ben Lloyd Russell L. Olsen (Typed name) (Typed name) 2 ~~/~I DATE DATE i.. Change Order Request Proposal Request #006(REVISED) R~~ TAY'Lt~R Ct~NSTRUa~TI'QN IN'G. To: Date: 02/09/09 Job Number: 2008-015 COMMA-Q ARCHITECTURE, INC. 109 N ROUSE AVE. #1 Job Name: STORY MANSION BOZEMAN, MT 59715 Date Accepted By: 1/29/09 We hereby agree to make the change(s) specified below: RFI 1 HANGERS/FASTENERS $1,979.00 X 1~%= $2,27~.8~ PSL >4' i~ 17.0E LF~ $920.70 X 15%= $1,058.81 LABOR $950.00 X 15°.%=$1,092.50 RFI 1.2 N/C RFI 1.3 M/aTERIAL/HANGERS $40.00 ~ 15°ro =$46.00 LABOR $76.00 X 15°,io"-$87.40 RP13? N'C Please sign and return one copy to our office immediately. Sub Total of Above 6% Contact Management Fee Total Change Order Request The Contract Time will be increased $4,560.56 $273.63 $4,834.19 0 <~` ' R & R Taylor Construction Inc.