Loading...
HomeMy WebLinkAboutStory Mansion Change Order No. 3, R&R Taylor Co. =a== Docu ment G701 TM - 2001 Change Order PROJECT (Name and address): City of Bozeman -Story Mansion Interior Renovation 811 S. Willson Ave. Bozeman, MT 59715 CHANGE ORDER NUMBER: 003 DATE: February 20, 2009 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 08-02 R&R Taylor Construction, Inc CONTRACT DATE: January 07, 2009 P.O. Box 1234 CONTRACT FOR: General Construction Bozeman, MT 59771-1234 OWNER: ARCHITECT: CONTRACTOR: FIELD: ^ OTHER: ^ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Provide and install revised water service entrance revision as required by the City of Bozeman Water Department. Repair damaged sod and/or building surfaces to match the existing condition. See PR #001. The original Contract Sum was $ 1,071,242.00 The net change by previously authorized Change Orders $ 2,006.86 The Contract Sum prior to this Change Order was $ 1,073,248.86 The Contract Sum will be increased by this Change Order in the amount of $ 5,049.84 The new Contract Sum including this Change Order will be $ 1,078,298.70 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2009 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Comma-Q Architecture, Inc. R&R Taylor Construction, Inc City of Bozeman ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 109 N Rouse Ave, #I, Bozeman, MT P.O. Box 1234, Bozeman, MT 59771- P.O. Box 1230, Bozeman, MT 59771 59715 1234 ADDRESS ~ ~ ADDRESS n ,. 11 . BY (Signature) ~ ~ I~,~f,Si~ature) BY (Signature) Ben Lloyd (Typed name) z/2¢/oq DATE Russell L. Olsen (Typed name) DATE James Goehrung (Ty ed name) Q o I DATE AIA Document G701 TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the laws This document was produced by AIA software at 10:05:18 on 02/24/2009 under Order No.1000388712_i which expires on 2/17/2010, and is not for resale. User Notes: (3732200868) Change O~de~ Request Proposal Request #001 ^ ^ ~&~ TAY~.C3R Gt7NSTRUCTI®N II~C. To: Date: O 1 /22/09 Job Number: 2008-01 S COMMA-Q ARCHITECTURE, INC. 109 N ROUSE AVE. #1 Job Name: STORY MANSION BOZEMAN, MT 5971 S Date Accepted By: 1/29/09 We hereby agree to make the change(s) specified below: PROVIDE. AND INS"TALL REVISED WA"1'ER SERVICE ENTRANCE REVISION AS REQUIRED E3Y i~HE CITY OE BOZEMAN WATER DEPARTMENT' PER THE AT"TACHED CONSTRUCTION SKETCH MSD31a (SHEET 1 OF 1). REPAIR DAMAGED SOD AND/OR BUILDING SURFACES TO MATCH THE EXISTING CONDITION. (SEE ATTACHED) EXPLORE & EXCAVATE EXISTING 2'' SERVICE $650.00 OH&P $794.00 CUT & CAP EXISTING 2" SERVICE IN PLACE $365.00 REDUCE 2'' TO LS COPPER/CORE WALL $1,595.00 BEDDING & BACI{FILL. $510.00 REPAIR LAWN ~ SOD $850.00 Please sign and return one copy to our office immediately. Sub Total of Above 6% Contact Management Fee Total Change Order Request The Cox~act Time will be increased $4,764.00 $285.84 $5,049.84 0 days. C~' Inc. .~ f Pro osal ~~~~~ ~ Excr+.vm~seo~a, n~ec_ From: Walker Excavation Inc. Project: 0903 270 Ftoss Flat Road, Suite B Description: Story Mansion- 2" Water Belgrade, MT 59714 service reduce to 1.5" Phone: 406-388-5834 Bid Date: 1-29-09 Fax: 406-388-5837 ITEM !_DESCRIPTION BID QTY U1M UNIT BID AMOUNT 010 1.000 LS 650.00 $650.00 Explore & excavate existing 2"service 015 1.000 LS 3&5.00 $365.00 Cut and Cap existing 2" service in place 020 1.000 LS 1,595.00 $1,595.00 Reduce 2" to 1.5" copper/ core wall and install new 1.5" cooper /with angle meter stop 025 1.000 LS 510.00 $510.00 Bedding & backfill 030 1.000 LS 850.00 $850.00 Repair lawn & sod Subtotal: $3,970.00 TOTAL BID: $3,970.00 1. 1 % tax is included. 2. We have included foam insulation over the new 1.5" service. 3. COB Meter by others.