Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Fire Station 3, Change Order No. 4, Martel Co.
1~~~> ._ ®.--e ~i-vs Change Order Document G701'~ - 2001 PROJECT: (Name and address) Bozeman Fire Station No. 3 1705 Vaquero Parkway Bozeman, MT 59718 TO CONTRACTOR: (Name and address) Mantel Construction Company 1203 South"Church Bozeman,' rIT 59715 CHANGE ORDER NUMBER: Four DATE: February 17, 2009 ARCHITECT'S PROJECT NUMBER: 0704 CONTRACT DATE: CONTRACT FOR: General Construction OWNER ^ ARCHITECT ^ CONTRACTOR ^ FIELD ^ OTHER ^ The Contract is changed as follows: (Include. ~ti~here applicable, an~~ undisputed amount attributable to previously executed Construction Change Directives) l.) Brick upgrade to standard sized brick. 2.) Electrical upgrades to add TVSS system and fully rated panels. 3.) Access doors for attic access and miscellaneous framing changes. 4.) Add power for fire station lighting. 5.) Add insulation above apparatus bay doors. 6.) riscellaneous electrical credit items. The original (Contract Sum) (Guaranteed Maximutxi Price} was The net change by preciously authorized Change Orders S .2,682,31,9.00 g 13,724.00 The (Contract Sum) (Guaranteed Ma;cilnum Price) prior to this Change Order was $ 2,$96', 043.00 The (Contract Sum) (Gu~~anteod Maximum Price) will be (increased) (dtet~zrsc~-1•) ~) by this Change Order in the amount of ~ 10, 814.00 The new (Contract Suni) (Guaranteed Maximum Price) including this Change Order will be $ 2 706, 857.00 The Contract Time will be (-i~e~eftse~ ~ di=._r_ti?_ ~j (unchanged) by ~ ( ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged (Note: Tlris Change Order does notinclude changes in the Contract Sum, Contract Time orGuaranteedMaximum Price ~rhich bare been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Gontracto~~, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.. ThinkOne Martel Construction Co. City of Bozeman ARCHITECT (Firm name) CONTRACTOR (Firm name). 101 E Main Studio One 1203 South Church Roseman MT 52715 Bozeman - M'r'__59715 ADD~jSS ' ADDRESS T- _~/~ _~" BY (Signature) BY (~gna ure) Bill Hanson (Typed riarrie) DATE Travis Kabalin (Typed name) DA OWNER (Firm name) 411 .East Main R_o~?man, DTI' _-_ ADD SS ~, / BY (Signature} James Goehrun~ (T}ped name) ~lg lao~~ DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701 TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, a-mail The American Institute of Architects' legal counsel, copyright@aia.org. MARTEL CONSTRUCTION, INC. MAIN OFFICE 1203 South Church Avenue Bozeman, MT 59715-5801 (406) 586-8585 Fax (406) 586-8646 01 /26/09 Think One Architects 101 East Main Bozeman, MT ATTN: Jay Morris RE: See attached Backup SUBJECT: COR # 04 REFERENCE: See attached Backup Dear Jay, ~ ~~ ~~ r As requested, we propose to provide all labor, materials, and equipment required to perform the above mentioned work. Our breakdown of the work is attached. Our quotation is based on our interpretation of the instructions and scope of work identified by request and/or drawings. If we have misinterpreted your request in any way (omissions, etc.) please advise us prior to processing this quotation into a formal Change Order. Other wise, our interpretation shall stand as correct. We have not been directed to proceed with the work per the instructions in the Proposal Request At this time, we are hereby requesting 0 calendar days for a time extension Please note this proposal is valid for (14) calendar days from this date and our proposal is based on receipt of a signed Change Order within (30) calendar days. We are requesting a Change Order for the amount of.• If you have any questions, please call me at (406) 586-8585 Sincerely, MARTEL CONSTRUCTION, INC. ®~i6~_ Travis Kabalin Enclosure(s) $10,814 COMI~fA~ RESIDENTIAL ® INSTITUTIONAL ® INDUSTRIAL BIGFORK OFFICE 305 Highway 83 Bigfork, MT 59911 (406) 837-1063 Fax (406) 837-1068 ~~ u~U ~~ RECIPIENT OF 1990 NATIONAL BUILDAMERICAAWARD 1999 SBA ENTREPRENEURIAL SUCCESSAWARD 1999 MONTANA FAMILY BUSINESS OF THE YEAR AWARD 2001 MCA CONCRETE EXCELLENCE AWARD ~~-V 1 S rrn ~ DA's ,~~C.~ ~ U f..!) 2•l3•v9 ~~~~a(~d 1 X360 Think One Architects 01 /26/09 Page 2 RE: See attached Backup SUBJECT: COR # 04 DESCRIPTION: See attached Backup BID BREAKDOWN: Revisions To Contractors Work See attached Backup 10,004.00 Subtotal 10,004.00 Fee Structure: Construction Management Fee 5.5% 550.22 Subtotal 10,554.22 Bonds & Insurance 1.45% 153.04 Subtotal 10,707.26 GRT Tax on all items 1 % 107.07 Calculated Proposal Request 10,814.33 TOTAL CHANGE ORDER REQUESTED: $10,814 REMARKS AND QUALIFICATIONS: