Loading...
HomeMy WebLinkAboutFire Station 3, Change Order No. 3, Martel Co.~--->. ~~-~~, Contract Administration . 1r? :,... '~"~'~` G701 Change Order (Instructions on the reverse side) PROJECT (Name and address): Bozeman Fire Station No. 3 1705 Vaquero Parkway Bozeman NI'~ziztana 59718 TO CONTRACTOR (Name and address): Martel Construction Company 1203 South Church Bozeman, MT 59715 CHANGE ORDER NUMBER: Three DATE: January 15 , 2009 ARCHITECT'S PROJECT NUMBER: 0704 CONTRACT DATE: Distribution List: Owner Architect Contractor Field Other CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Add driveway culvert for the 13inosaur Park access drive. 2. Add one light-switch in Room ~~158 3. Add twenty sprinkler heads in the apparatus day to provide for an increase in coverage from "Light Hazard" to "Ordinary Hazard':',' The original (Contract Sum) (Guaranteed Maximum Price} was ~ 2,:682, 319.00 The net change by previously authorized Change Orders $ _, 9,192. nn The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ~ ~i. 97 ~~ -) On The'(Contract Sum) (Guaranteed Maximum Price} will be (increased) (deefe~asedj (~tet?~rge~} by this Change Order in the amount of $ ~#, 532.00 The new (Contract Sum) (Guaranteed Maximum Pride) including this Change Order will be $ 2i 6gh, n43 nn The Contract Time will be (+t3efeased) (vi~;~,) (unchanged) by ( )days. The date of Substantial Completion as of the date of this Change Order therefore is t?r?rhanged Att?TE: This Change Order does nor include changes in the Contract Sum, Contract Time or Guaranteed f~raximum mice ~-vnici; have been authorizea by Construction Change Directive until the cost and Time have been agreed upon by both the Owner and .:Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Th-~-~~e Martel Construction Co.. City of Bozeman ARC C Firm n e,) CON ggCIOR (Firm nam) 0 N€R (Firm name) ~~~ ~ast ~ain Studio One ~1~U:3 South C~iurch 411 East rlain AD ESS ADDRESS ADDRESS ~ozeman, MT 59715 Bozeman, 1?~T 59715 eman MT 59715 ~~ l BY (BS~~aturPJanSOn BY ~ nature B Si na r .L1 tHi ~~avis~ Kabalin J(a~e ~oehrung (Typed name) (Typed name) (Typed name) ~ ~ ` ~.,~ DATE DATE DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures changes will not be obscured. AIA Document G701 Change Order ©2001 The American Institute of Architects • Washington, DC • www.aia.org • WARNING: Reproduction, unlicensed photocopying or substantial quotation of the material herein without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyrightQaia.org. il1~ MARTEL CONSTRUCTION, INC. MAIN OFFICE BIGFORK OFFICE 1203 South Church Avenue 305 Highway 83 Bozeman, MT 59715-5801 Bigfork, MT 59911 (406) 586-8585 Fax (406) 586-8646 (406) 837-1063 Fax (406) 837-1068 12/01 /08 Think One Architects 101 East Main Bozeman, MT ATTN: Jay Morris g ~~~ _ RECIPIENT OF 1990 NATIONAL BUILDAMERICAAWARD 1999 SBA ENTREPRENEURIAL SUCCESS AWARD 1999 MONTANA FAMILY BUSINESS OF THE YEAR AWARD 2001 MCA CONCRETE EXCELLENCEAWARD ., ..~ RE: Dinosaur Park Culvert, Light Switch Addition, Sprinklers in Appartus Bay SUBJECT: COR # 03 REFERENCE: Dinosaur Park Culvert, Light Switch Addition, Sprinklers in Appartus Bay Dear Jay, As requested, we propose to provide all labor, materials, and equipment required to perform the above mentioned work. Our breakdown of the work is attached. Our quotation is based on our interpretation of the instructions and scope of work identified by request and/or drawings. If we have misinterpreted your request in any way (omissions, etc.) please advise us prior to processing this quotation into a formal Change Order. Other wise, our interpretation shall stand as correct. We have not been directed to proceed with the work per the instructions in the Proposal Request At this time, we are hereby requesting 0 calendar days for a time extension Please note this proposal is valid for (14) calendar days from this date and our proposal is based on receipt of a signed Change Order within (30) calendar days. We are requesting a Change Order for the amount of.~ $a,s32 If you have any questions, please call me at (406) 586-8585 Sincerely, MARTEL CONSTRUCTION, INC. Kabaiin Enclosure(s) COM~i~e RESIDENTIAL INSTITUTIONAL INDUSTRIAL ~'a°calied 1 X60