Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Fire Station 3, Change Order No. 2, Martel Co.
~1+~I~, Contract Administration .: ~~;d :,o.. ''-~'~~ G701 Change Order (instructions on the reverse side) PROJECT (Name and address): Bozeman Fire Station No. 3 1705 Vaquero Parkway Bozeman, Montana 5971$ TO CONTRACTOR (Name and address): Martel Construction Company 1203 South Chur~.ch Bozeman, Montana 59715 P flfl "~"~'1~ 1 Distribution List: CHANGE ORDER NUMBER DATE Owner Architect Contractor Field Other Sao (Fire) November 18, 2008 ARCHITECT'S PROJECT NUMBER: 0704 CONTRACT DATE: CONTRACT FOR: General Constniction- THE CONTRACT IS CHANGED AS FOLLOWS: (include, where app/icable, any undisputed amount attributable to previously executed Construction Change DirF^*ir , 1. Door hardware modifications, add trilogy electronic hardw~~rf~ 2. Add operable windows in sleeping rooms and kitchen 3. Deb"e~tr~ three'~i~e alarm pull locations 4. Add structural steel framing for training manhole at mez7al~_i_nc The original (Contract Sum) (Guaranteed Maximum Price) was ~' , r,8~~ ; 31 ~ ~ . 0(~ The net change by previously authorized Change Orders ~' , ~ "~~i . UU The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ~ I' ~~-'_, ~ ~ ~ lid The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (desfaased.) ~e~ by this Change Order in the amount of ~ (~ , ~!~ . Or ) The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ~ ~~~] 2 ; ~ t ,Ili The Contract Tirne will be (+~e~as~e~) (~esre~ss~ (unchanged) by I,, The date of Substantial Completion as of the date of this Change Order therefore is unchan<;r~d NOTE This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed ~ Construction Change Directive until the cost and time have been agreed upon by both the Owner to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ThinkOne ~fiCH1~GT Fir~na~)~d10 One gMt~aratel Constreu~)ction Company Guu~tti~ of Bo~cman ~1G~.i~T~o~trhm ~ntirch ~4~~~ 'Eas ~ i'1, i n DDRESS A RESS ozeman, MT 59715 ~ozeman, MT 59715 ,~'s~ ~'J ~i~' BY (Signature) BY (Signature) Ri 11 Han~nn Trav-i ~ Kahn] in (Typed name) (Typed name) DATE DATE AgpRESS t ozem~ln , ~~I"i' > ~~ ,1 -~ BY (ignatur .Tamar t^nah~LUi_~_ (Typed name) ___~~ q~~~o9 DATE CAUTION: You should sign an original AIA Contract Document; on which this teat appears in RED. An original assures changes will not be obscured. AIA Document G701 Change Order ©2001 The American Institute of Architects • Washington, DC • www.aia.org • WARNING: Reproduction, unlicensed photocopying or substantial quotation of the material herein without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyrighfQaia.org. MARTEL CONSTRUCTION, INC. ~~~ y MAIN OFFICE BIGFORK OFFICE ~M~ .,,, ~ ~ '""`""" 1203 South Church Avenue Bozeman, MT 59715-5801 (406) 586-8585 fax (406) 586-8646 305 Highway 83 Bigfork, MT 59911 (406) 837-1063 Fax (406) 837-1068 RECIPIENT OF 1990 NATIONAL BUILD AMERICAAWARD 1999 SBA ENTREPRENEURIAL SUCCESSAWARD 1999 MONTANA FAMILY BUSINESS OF THE YEAR AWARD 2001 MCA CONCRETE EXCELLENCEAWARD 11 /12/08 Think One Architects 101 East Main Bozeman, MT ATTN: Jay Morris RE: Door Hardware, Steel at Mezzanine, Fire Alarm Pulls, Operable Windows SUBJECT: COR # 02 REFERENCE: Door Hardware, Steel at Mezzanine, Fire Alarm Pulls, Operable Windows Dear Jay, As requested, we propose to provide all labor, materials, and equipment required to perform the above mentioned work. Our breakdown of the work is attached. Our quotation is based on our interpretation of the instructions and scope of work identified by request and/or drawings. If we have misinterpreted your request in any way (omissions, etc.) please advise us prior to processing this quotation into a formal Change Order. Other wise, our interpretation shall stand as correct. We have not been directed to proceed with the work per the instructions in the Proposal Request At this time, we are hereby requesting 0 calendar days for a time extension Please note this proposal is valid for (14) calendar days from this date and our proposal is based on receipt of a signed Change Order within (30) calendar days. We are requesting a Change Order for the amount of.• $s,354 If you have any questions, please call meat (406) 586-8585 Sincerely, MARTEL CONSTRUCTION, INC. Kaba Enclosure(s) CC. COIVINt~FiF~~AL ® RESIDENTIAL ® INSTITUTIONAL ~ INDUSTRIAL ~¢~~zB~laed 1 X60