REPORT TO: Honorable Mayor and City Commission
FROM: Brian Krueger, Associate Planner
SUBJECT: The Norton East Ranch Major Subdivision Preliminary Plat, #P-07047
MEETING DATE: Public hearing on Tuesday, January 22, 2008, at 6:00 pm
RECOMMENDATION: Staff recommends that this application be conditionally approved with
the conditions and code provisions listed in the staff report addendum dated January 16, 2008.
BACKGROUND: Norton Properties, LLC, and representative Big Sky Land Consulting, have
submitted a Major Subdivision Preliminary Plat application to subdivide 47.77 acres into 30 single-
household residential lots, 6 single family duplex lots, 15 multi-household residential lots, 73
attached single household lots, one neighborhood center, and including restricted size lots and
workforce housing lots, with the remaining area as parks, open spaces, streets and alleys. The subject
property is annexed with a preliminary zoning designation of R-4 (Residential High Density
District), and is located west of Cottonwood Road between future extensions of W. Babcock Street
and Fallon Street and is bound on the west by a future extension of Laurel Parkway. The DRC
provided a recommendation of conditional approval on December 19, 2007. The Planning Board
held a public hearing and reviewed the proposal on January 2, 2008. The Planning Board voted
unanimously to recommend conditional approval of the subdivision.
UNRESOLVED ISSUES: There are three unresolved issues remaining with the subdivision. The
issues directly relate to three recommended conditions of approval: #4, #34, and #35 that can be
found in the staff report addendum dated January 16, 2008.
Condition #4: Staff and the Planning Board recommend condition #4, which would require that
.28 acres of additional dedicated parkland be provided either: onsite, offsite, or cash in lieu with the
subdivision. There was considerable discussion with the Planning Board regarding the amount of
parkland credit that the applicant can claim for providing workforce housing. The code, Section
18.50.020.4.b.(1) BMC clearly states that “If the developer chooses to develop more than the
required number or area of workforce housing units, the additional lot area square footage above the
minimum required shall not further reduce the parkland area.” The subdivider is providing more
workforce housing lots and in some cases in a larger size than required, and per the above stated
section may not take parkland offset credit for the additional number of lots provided or for the
additional lot area square footage over the minimum required. The subdivider proposed a .75 acre
parkland credit and per the code may only claim a .47 acre credit. As such, the subdivider is
deficient in the amount of required parkland provided in the subdivision. This issue is described
further on page 15 of the staff report and in the Planning Board minutes. Some members of the
Planning Board made general comments that the applicant should be allowed to apply additional
parkland credit for workforce housing due to the proposed high level of parkland improvements
and amenities to be provided on site by the developer. Staff finds no mechanism other than code
text amendments to Section 17.02 BMC and Section 18.50 BMC that would enable the Commission
to consider such credit.
417
Condition #34: The Engineering Department has provided clarifying language to condition #34 as
written in the original staff report. This condition now identifies the portion of the roadways in
question that are along the property boundary and the portion that provides access to the
development. By code, all development shall be provided with a second means of access. Currently,
the property has no access to the existing street system. The updated language is included in
condition #34 that can be found in the staff report addendum dated January 16, 2008.
Condition #35: The Planning Board voted 4-2 to strike staff’s proposed condition #35 from their
recommendation of approval. Staff does not support this recommendation. Condition #35 would
require that prior to any issuance of building permits for the subdivision, that the remaining half of
Cottonwood Road between West Babcock Street and Fallon Street be constructed. Cottonwood
Road, designated a principal arterial roadway, is the primary north-south route through which traffic
from the Norton Subdivision will flow until a future connection, through a future phase, is made to
another north-south route, west of the development. The condition states that the roadway section
in question would have to improved, but does not assign this responsibility to any one entity,
individual, or funding source. Staff recommends that condition #35 be included in any conditional
approval for the subdivision and condition #35 is included in the conditions recommended in the
staff report addendum dated January 16, 2008.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased
property tax revenues, along with increased costs to deliver municipal services to the property, when
the property is developed.
ALTERNATIVES: As suggested by the City Commission.
CONTACT: Please feel free to email Brian Krueger at bkrueger@bozeman.net if you have any
questions prior to the public hearing.
APPROVED BY: Andrew Epple, Planning Director
Chris Kukulski, City Manager
Attachments: Staff Report Addendum January 16, 2008
Engineering Staff memo January 11, 2008
Planning Board Resolution #P-07047
Planning Board Minutes January 2, 2008
Staff Report
Aerial Map
Agency Review Comments
Public comment (1)
Applicant’s Preliminary Plat Submittal Materials
418
PLANNING BOARD & CITY COMMISSION STAFF REPORT FILE NO. #P-07047
THE NORTON EAST RANCH MAJOR SUBDIVISION PRELIMINARY PLAT
STAFF REPORT ADDENDUM JANUARY 16, 2008
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 1
RECOMMENDATION Staff recommends that this application be conditionally approved with the
conditions and code provisions listed in this staff report addendum dated January 16, 2008.
RECOMMENDED CONDITIONS OF APPROVAL
Planning Office:
1. The Final Plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform
Standards for Final Subdivision Plats and shall be accompanied by all required documents, including
certification from the City Engineer that as-built drawings for public improvements were received, a
platting certificate, and all required and corrected certificates. The Final Plat application shall include
four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two
(2) digital copies; one (1) PDF copy; and five (5) paper prints. The applicant is advised that unmet code
provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any
way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or
state law.
2. The applicant shall submit with the application for Final Plat review and approval, a written narrative
stating how each of the conditions of preliminary plat approval and noted code provisions have been
satisfactorily addressed, and shall include a digital copy (pdf) of the entire Final Plat submittal. This
narrative shall in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note,
covenant, etc. in the submittal.
3. Subject to the review and recommendation of the Recreation and Parks Advisory Board, the Parks and
Recreation Superintendent and final approval by the City Commission the proposed parkland dedication
requirements shall be met for this subdivision. Documentation of satisfaction of parkland dedication
requirements in accordance with Section 18.50.020 of the BMC shall be provided. A table showing the
computed park areas shall be included on the final plat pursuant to Section 18.78.070.D of the BMC.
This table shall include but is not limited to detention/retention areas, watercourse, wetlands,
watercourse setbacks, park land, and total area.
4. .28 acres of additional dedicated parkland shall be provided either: onsite, offsite, or cash in lieu.
5. All dedicated park lands including linear parkways shall be titled “Public Park” on the final plat. Notes
shall be included on the plat describing ownership and maintenance responsibility for both the park and
open space areas, (e.g. public park, dedicated to the city and maintained by the homeowners association
and/or future Park Maintenance District, etc.).
6. Dedicated park land shall have frontage along 100 percent of its perimeters on public or private streets,
unless otherwise noted and as reviewed and permitted under Section 18.50.060 through the construction
of pedestrian access, off street parking and improvements within the park area as approved in the
respective final park plan(s). This further implies that all streets adjacent to parkland for each phase of
the major subdivision must be improved with said phase.
419
7. The Final Park Plan(s) shall include:
a. Current and future site plan(s) for the entire property with the current plan showing developer
installed improvements and the future plan showing any planned improvements not intended to
be installed by the developer;
b. The location of watercourse setbacks, wetland delineation, and wetland fringe;
c. Park landscaping plan, prepared by a qualified landscape professional in accordance with
§18.78.100 for all parkland areas including linear parkways;
d. Trail design and construction showing compliance with adopted City standards and trail
classifications;
e. The requirement for a preconstruction meeting prior to any site work, including boardwalks,
bridges, and trails;
f. Appropriate sections from the “Design Guidelines for City of Bozeman Parks”;
g. Cost estimate and installation responsibility for all improvements;
h. A neighborhood gathering place (pavilion, community building, wetland interpretation and
viewing platforms, etc.) and playground equipment in the Neighborhood Center in addition to
the standard requirement for boulevard street trees, irrigation, seeding, sidewalks, etc.
i. A notation that a building permit will be required for any structural improvements including
bridges, boardwalks, and shelter structures.
j. Parking area, design and construction drawings showing compliance with adopted City standards
including ADA parking and signage.
8. Sidewalks along park land should be constructed to a six foot width to accommodate snow removal
equipment.
9. The subdivider in consultation with MDT, the City of Bozeman, and Streamline Transit shall locate,
design, and construct a transit stop with seating, lighting, a bike rack, and a shelter at the Neighborhood
Center per section 18.44.120 of the Bozeman Municipal Code.
10. A note shall be included on the plat for all multi family lots describing park dedication allowances; e.g.
park dedication requirements for Lot 43, Block 14 have been met for 12 dwelling units, at the time of
subsequent development, when net residential density becomes known, cash-in-lieu of park dedication
requirements shall be met by the property owner for any additional density in accordance with the BMC.
This note shall be recorded on the individual lots in a manner that will appear on a title search.
11. Fences located in the front, side or rear yard setback of properties adjacent to any park or open space
shall not exceed a maximum height of 4 feet, and shall be of an open construction designed in a manner
to be consistent along all park land and open space areas. This requirement with appropriate exhibits of
fence types shall be addressed and illustrated in the home owner’s association documents.
12. The subdivider shall provide a subdivision perimeter fencing plan to be implemented prior to final plat.
The plan shall include plans and specifications to fence the perimeter of the project including the
southern boundary of the right-of-way for Fallon Street, the north boundary of the right of way of W.
Babcock Street, the west boundary of the right of way for Laurel Parkway.
13. Hard Luck Street shall be extended east to the east property boundary of the subdivision through Lot 1
in order to provide adequate access to undeveloped land.
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 2 420
14. Buildings constructed on lots along West Babcock Street, Laurel Parkway, and Fallon Street shall either
front onto those roadways and/or have double-front architectural features facing those roads as found
on the front of the dwellings units, for example; end gables, covered porches, varied roof lines, multiple
façade materials, varied façade plane, and decorative lighting. These architectural requirements shall be
addressed and demonstrated in the covenants/development guidelines. The homeowner’s association
documents shall also specify that a maximum 4’ tall fence, with coordinated design detail, is permitted
along the back of these lots.
15. All finished floor elevations be a minimum of 18 inches above the top of the curb in front of the
residence or building. This building restriction shall be addressed and demonstrated in the
covenants/development guidelines.
16. All lots that have access to an alleyway shall use the alley for access to the lot, no driveway access from
the street is allowed. This access restriction shall be addressed and demonstrated in the
covenants/development guidelines.
17. Trees may not be located within 10 feet of sewer and water services. Sewer and water services shall be
shown on the landscaping plan of the park and open space plan, and approved by the Water/Sewer
Superintendent.
18. Homeowner’s association documents shall address the requirements for street trees, a City of Bozeman
planting permit for street trees and obtaining utility locates before any excavation begins in the City of
Bozeman right-of-way. The covenants shall include a planting note stating that the planting hole shall be
at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and
above ground, and there should be a mulch ring 3’ -4’ in diameter around each newly planted boulevard
tree.
19. Street lighting, including pathway intersection lighting, shall be installed by the subdivider. Light
locations and specifications shall be provided to the City Engineer for review and approval with the
public improvements plans and specifications. All street light poles shall be installed a minimum of 10’
from any water or sewer main or appurtenance.
20. Subdivision lighting SILD information shall be submitted to the Clerk of Commission after Preliminary
Plat approval in hard copy and digital form. The final plat will not be deemed complete until the
resolution to create the SILD has been approved by the City Commission.
21. Should historical, cultural and/or archeological materials be inadvertently discovered during
construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman Historic
Preservation Office shall be contacted immediately and construction activities shall cease.
22. Should any species of concern, as defined by the Montana Natural Heritage Program, be discovered on-
site during construction, the Montana Department of Fish, Wildlife and Parks and the Montana Natural
Heritage Program shall be contacted immediately and construction activities shall cease.
Engineering Office:
23. The proposed lift station shall be designed and built to accommodate the sewer capacity of the full
development. However, the wastewater output from the lift station shall be limited to the amount
allocated in the 1998 Valley West Sewer Report (192,816 gpd) until the trunk sewer main as shown in
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 3 421
the 2007 Wastewater Facilities Plan is installed. The lift station will be owned and operated by the City.
Maintenance costs will be paid for by the homeowners by way of a surcharge on their sewer bill.
24. Design of the lift station, including the building, will be reviewed and approved by the City Engineering
and Water/Sewer Departments. The lift station shall include a SCADA system compatible with the
City’s existing system. The lift station shall also include backup power capable of running the entire
station including all pumps.
25. A master plan and the sanitary sewer main layout for the portion of the development west and south of
Phase I shall be provided. If a sanitary sewer main and/or stubs are necessary in Laurel Parkway, from
Fallon Street to West Babcock Street, they are to be provided in this phase.
26. The lift station shall be located outside of the Baxter Creek 100 year floodplain.
27. An all-weather access must be provided to the lift station. The access, lift station, and force main must
either be on separate lots dedicated to the city, or contained within easements.
28. Any air relief valves on the sewer force main shall be accessible by the City’s flusher truck. This may
require turnout(s) to be constructed at the location of the valves.
29. Any public street rights of way for which easements have been provided (i.e. Laurel Parkway) shall be
dedicated to the City on the Final Plat for this subdivision.
30. All typical street sections, including sidewalk location within the right-of-way and provisions for
bicyclists shall be in conformance with the street standards recommended in the Greater Bozeman Area
Transportation Plan, 2001 Update, unless otherwise approved by the City Commission, or by the City
Engineer through the plan and specification review and approval process.
31. City standard curb, gutter and sidewalk shall be provided along all streets in the subdivision. 6 ft wide
sidewalk will be required in the standard location adjacent to park land. The trail and sidewalk may be
combined into one facility that is 10 ft wide and constructed of concrete. The combined walk may vary
from the standard location (i.e. meander), but at the furthest, shall be no more than 15 ft from the right-
of-way.
32. The trails shall connect to pedestrian ramps at the intersections or approved mid-block crossings.
33. A schematic signage plan for the subdivision, noting any proposed traffic calming measures, shall be
provided with the design report for review and approval by the City Engineer.
34. West Babcock Street, from Cottonwood Road to the eastern property boundary, would be required to
be improved to collector standard, as shown in the Greater Bozeman Area Transportation Plan 2001
Update, prior to issuance of any building permits for the development. Fallon Street, from Cottonwood
Road to the eastern property boundary, would be required to be improved to local standard, as shown in
the Greater Bozeman Area Transportation Plan 2001 Update, prior to issuance of any building permits
for the development. Laurel Parkway and West Babcock Street, along and within the property boundary,
shall be improved, as part of this development, to collector standard as shown in the Greater Bozeman
Area Transportation Plan 2001 Update. Fallon Street, along and within the property boundary, shall be
improved, as part of this development, to local standard as shown in the Greater Bozeman Area
Transportation Plan 2001 Update. City standard curb and gutter, and sidewalk will be required in the
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 4 422
standard location on the development’s side of the street. Detailed review of the street and intersection
design, and approval by the City Engineer will be required as part of the infrastructure plan and
specification review process.
35. Cottonwood Road is designated as a Principal Arterial in the Greater Bozeman Area Transportation
Plan. The applicant is advised the remaining half of this facility along the entire length of the
development, from West Babcock Street to Fallon Street, would be required to be constructed prior to
issuance of any building permits for the development.
36. A joint access shall be provided at Lots 123 and 124, Block 1, at Lots 121 and 122, Block 2, and at Lots
118 and 119, Block 2, that lines up with the respective alley to the south.
37. A 1 foot no access easement shall be shown on the final plat along the entire frontage of West Babcock
Street and Laurel Parkway.
38. The driving surface on the alley typical section shall be a minimum of 16 ft wide.
39. Provide 10 ft minimum clearance from the fire hydrants to street lights, junction pedestals, and signs.
40. All retention/detention ponds shown within the right-of-way shall be relocated outside of the right-of-
way and a temporary or permanent storm drainage easement provided.
Recreation and Parks Advisory Board:
41. The E-W greenway trail along Wayward West shall be a 10’ or 12’ meandering concrete shared use path
in lieu of sidewalk.
Wetland Review Board:
42. All stormwater basins/detention ponds within the subdivision shall be naturalized by creating
irregularly-shaped basins, vegetating with native grass/emergent wetland and woody species, and
limiting the use of rock in the bottom of the basins.
43. The boardwalk trail through the north end of wetland W-5 and the two viewing platforms shall be
constructed at least 24 inches above the ground surface to preserve the wetland vegetation.
44. Place educational placards along the boardwalk and on the viewing platforms
45. The WRB shall be notified and invited to attend a preconstruction meeting prior to the construction of
any platforms or boardwalks.
Code Provisions:
a. 18.42.030.D “Corner Lots” – The homeowner’s association documents shall provide language stating
that all corner lots shall have the same orientation as dwellings on lots on the interior of the block. The
final plat shall indicate the orientation of all corner lots.
b. 18.04.050 - Water rights, or cash-in-lieu thereof, as calculated by the City Engineer’s Office, is due with
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 5 423
each final plat of the major subdivision.
c. 18.42.060.B.1.a “Private Utilities” – The final plat and homeowner’s association documents shall contain
a note stating that if a utility easement is greater than the building setback required by the Title 18 of the
B.M.C. said easement shall apply.
d. 18.44.010.A. “Streets” When a proposed development adjoins undeveloped land, and access to the
undeveloped land would reasonably pass through the new development, streets within the proposed
development shall be arranged to allow suitable development of the adjoining undeveloped land. Streets
within the proposed development shall be constructed to the boundary lines of the tract to be
developed, unless prevented by topography, or other physical conditions, in which case a subdivision
variance must be approved by the City Commission.
e. 18.44.120 “Public Transportation” – Any interior and exterior development streets that are designated
as transit routes shall be designed to accommodate transit vehicles and facilities. The subdivider in
consultation with MDT, the City of Bozeman, and Streamline Transit shall locate, design, and construct
a transit stop with seating, lighting, a bike rack, and a shelter at the Neighborhood Center per section
18.44.120 of the Bozeman Municipal Code.
f. 18.46.020.B “Parking Within Structures” – The homeowners’ association documents shall include the
minimum provisions for one-stall and two-stall car garages as outlined by Administrative Policy No.
2007-03.
g. 18.50.080.D “Storm Water Detention/Retention Ponds” – The park master plan shall provide a grading
and landscape plan for any storm water facilities located in dedicated parklands. Maximum grading of
said facilities and design shall be such that the facility serves as a landscape feature and further complies
with 18.48.050.L “Maximum Allowable Slope or Grade” of the U.D.O.
h. 18.50.090, executed waivers of right to protest creation of special improvement districts (SIDs) for a
park maintenance district shall be executed and submitted with the final plat to be filed with the Gallatin
County Clerk and Recorder at the time of final plat recordation.
i. 18.78.070.D requires a Final Park Plan to be approved by the City Commission, with a recommendation
from the Bozeman Recreation and Parks Advisory Board, prior to Final Plat approval. Four bound
copies of the plan shall be submitted to the Planning Office for review prior to installation of any
improvements or prior to Final Plat submission, whichever comes first. The Park Plan shall address all
of the criteria outlined in Section 18.78.060.P of the BMC.
j. Covenants, restrictions, and articles of incorporation for the creation of a homeowners’ association shall
be submitted with the final plat application for review and approval by the Planning Office and shall
contain, but not be limited to, provisions for assessment, maintenance, repair and upkeep of common
open space areas, public parkland/open space corridors, stormwater facilities, public trails, snow
removal, and other areas common to the association pursuant to Chapter 18.72 of the Bozeman
Municipal Code.
1. These documents shall include a common area and facility maintenance plan and guarantee for the
permanent care and maintenance of open spaces, recreational areas, stormwater facilities and parking
lots in accordance with Chapter 18.72 or the Bozeman Municipal Code.
2. These documents shall be submitted to the city attorney and shall not be accepted by the city until
approved as to legal form and effect. A draft of these documents must be submitted for review and
approval by the Planning Department at least 45 working days prior to filing and recordation with the
Gallatin County Clerk and Recorder.
3. These documents shall be executed and submitted with the final plat to be filed with the Gallatin
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 6 424
County Clerk and Recorder at the time of final plat recordation.
k. Section 18.78.070.D of the BMC requires a Final Park Plan to be approved by the City Commission,
with a recommendation from the Bozeman Recreation and Parks Advisory Board, prior to Final Plat
approval. Four bound copies of the plan shall be submitted to the Planning Office for review prior to
installation of any improvements or prior to Final Plat submission, whichever comes first. The Park
Plan shall address all of the criteria outlined in Section 18.78.060.P of the BMC.
l. Pursuant to Section 18.06.040.D.6 of the BMC, conditional approval of the Preliminary Plat shall be in
force for not more than one calendar year for minor subdivisions, two years for single-phased major
subdivisions and three years for multi-phased major subdivisions. Prior to that expiration date, the
developer may submit a letter of request for the extension of the period to the Planning Director for the
City Commission’s consideration. The City Commission may, at the written request of the developer,
extend its approval for no more than one calendar year, except that the City Commission may extend its
approval for a period of more than one year if that approval period is included as a specific condition of
a written subdivision improvements agreement between the City Commission and the developer,
provided for in §18.74.060, BMC.
m. Per Section 18.42.050, utilities shall be placed underground, wherever technically and economically
feasible. If overhead utility lines are used, they shall be placed along the rear property line.
n. Per Section 18.42.120, if mail will not be to each individual lot within the development, the developer
shall provide an off-street area for mail delivery within the development in cooperation with the United
States Postal Service. It shall not be the responsibility of the City to maintain or plan any mail delivery
area constructed within a City right-of-way.
o. Section 18.48.070 requires the subdivider to install irrigation, sod and street trees on all external streets
and adjacent to public parks or other open spaces. A landscape plan shall be submitted, identifying the
location and tree species to be installed by the developer, prior to installation of the trees or by final plat,
whichever comes first.
p. All improvements are subject to Chapter 18.74 “Improvements and Guarantees.” If it is the developer’s
intent to file the plat prior to the completion of all required improvements, an Improvements
Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all
improvements in accordance with the preliminary plat submittal information and conditions of
approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply
the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the
remaining improvements.
q. The final plat must be in compliance with all requirements of Section 18.78.070 “Final Plat,” including,
but not limited to the following items:
1. Section 18.78.070.C states that a Memorandum of Understanding shall be entered into by the Weed
Control District and the subdivider for the control of county declared noxious weeds and a copy
provided to the Planning Department prior to final plat approval.
2. The final plat submittal shall include all required documents, including certification from the City
Engineer that as-built drawings for public improvements were received, a platting certificate, and all
required and corrected certificates. The final plat application shall include four (4) signed reproducible
copies on a stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high
density 3½-inch floppy disk or compact disk; and five (5) paper prints.
3. Final Park Plan. For all land used to meet parkland dedication requirements, a final park plan
shall be submitted to the City of Bozeman for review and approval prior to final plat. The installation of
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 7 425
any park improvements to meet minimum development standards or conditions of approval shall
comply with Chapter 18.74, BMC. The final park plan shall be reviewed and approved by the City
Commission, with a recommendation from the Bozeman Recreation and Parks Advisory Board. The
final park plan shall include all of the information listed in §18.78.060.P of this chapter.
4. Irrigation System As-Builts. The developer shall provided irrigation system as-builts, for all
irrigation installed in public rights-of-way and/or land used to meet parkland dedication requirements,
once the irrigation system is installed. The as-builts shall include the exact locations and type of lines,
including accurate depth, water source, heads, electric valves, quick couplers, drains and control box.
s. Stormwater Master Plan:
A Stormwater Master Plan for this phase of the subdivision for a system designed to remove solids, silt,
oils, grease and other pollutants from the runoff from the private and public streets and all lots must be
provided to and approved by the City Engineer.
The master plan must depict the maximum sized detention/retention basin location, show location of
and provide easements for adequate drainage ways within the subdivision to transport runoff to the
stormwater receiving channel. The plan shall include sufficient site grading and elevation information
(particularly for the basin sites, drainage ways and finished lot grades), typical stormwater
detention/retention basin and discharge structure details, basin sizing calculations and a stormwater
maintenance plan.
Any stormwater ponds located within a park or open space shall be designed and constructed to be
conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff
generated by the subdivision (e.g., general lot runoff, public or private streets, common open space,
parks, etc.) shall not be located in easements within privately owned lots.
While the runoff from the individual lots will be dependent on the intensity of use on each lot, the
maximum sizing of the storm retention facilities for each lot will be established based on maximum site
development. Final facility sizing may be reviewed and reduced during design review of the FSP for
each lot.
t. Plans and specifications and a detailed design report for water and sewer main extensions, streets and
storm drainage facilities, prepared by a Professional Engineer (PE) registered in the state of Montana,
shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved
by the Montana Department of Environmental Quality. The Applicant shall also provide Professional
Engineering services for Construction Inspection, Post-construction Certification, and preparation of
mylar Record Drawings.
Construction shall not be initiated on the public infrastructure improvements until the plans and
specifications have been approved and a pre-construction conference has been conducted. All plans
and specification shall comply with the current version (including all addenda) of the City of Bozeman
Design Standards and Specifications Policy and the City of Bozeman Modifications to Montana Public
Works Standard Specifications Fifth Edition that have been adopted at the time of approval of the plans
and specifications.
No building permits shall be issued prior to substantial completion and City acceptance of the
required infrastructure improvements unless all of the requirements of Section 18.74.030.D of
the Unified Development Ordinance are met to allow for concurrent construction.
u. All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets,
curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages, and
related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 8 426
to Final Plat approval.
City standard residential sidewalks shall be constructed on all public street frontages of a property prior
to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of
any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further
notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements
have been made upon the lot. This condition shall be included on the final plat for the subdivision.
v. All proposed private utilities to serve the subdivision shall be shown on the public infrastructure plans
and specifications.
w. The location of and distinction between existing and proposed sewer and water mains and all easements
shall be clearly and accurately depicted on the plans, as well as all nearby fire hydrants and proposed fire
hydrants.
x. Any easements needed for the water and sewer main extensions shall be a minimum of 30 feet in width
with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from
the edge of the easement. All necessary easements shall be provided prior to final plat approval and shall
be shown on the plat. Wherever water and/or sewer mains are not located under or accessed from
improved streets, a 12 foot wide all weather access drive shall be constructed above the utilities to
provide necessary access.
y. Street names must be approved by the Gallatin County GIS office and City Engineering office prior to
final plat approval.
z. The developer shall make arrangements with the City Engineer's office to provide addresses for all
individual lots in the subdivision prior to filing of the final plat.
aa. The location of mailboxes shall be coordinated with the City Engineering Department prior to their
installation.
bb. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of Environmental
Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any
required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to plan and
specification approval.
cc. If construction activities related to the project result in the disturbance of more than 1 acre of natural
ground, an erosion/sediment control plan may be required. The Montana Department of
Environmental Quality may need to be contacted by the Applicant to determine if a Stormwater
Discharge Permit is necessary. If a permit is required by the State, the Developer shall demonstrate to
the City full permit compliance.
dd. The applicant shall submit a construction route map dictating how materials and heavy equipment will
travel to and from the site in accordance with Section 18.74.020.A.1 of the Unified Development
Ordinance. This shall be submitted as part of the final site plan for site developments, or with the
infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the
construction traffic follows the approved routes.
ee. All construction activities shall comply with Section 18.74.020.A.2 of the Unified Development
Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets.
The City may require a guarantee as allowed for under this section at any time during the construction to
ensure any damages or cleaning that are required are complete. The developer shall be responsible to
reimburse the City for all costs associated with the work if it becomes necessary for the City to correct
any problems that are identified.
ff. Ditch relocation:
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 9 427
1. The Montana Fish, Wildlife and Parks shall be contacted by the Applicant regarding the proposed
relocation and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior
to FSP approval.
2. The Applicant shall comply with all parts of section 18.42.060.D for any ditch relocation.
Report Sent to:: Norton Properties, LLC, 63020 Lower Meadow Road Suite A, Bend, OR 97701.
Big Sky Land Consulting, PLLC, 5530 Burnt Road, Belgrade, MT 59714
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report Addendum 10428
429
The Norton East Ranch Subdivision
1
RESOLUTION #P-07047
RESOLUTION OF THE CITY OF BOZEMAN PLANNING BOARD REGARDING A
MAJOR SUBDIVISION PRELIMINARY PLAT APPLICATION, TO SUBDIVIDE 47.77
ACRES, LOCATED WEST OF COTTONWOOD ROAD BETWEEN FUTURE
EXTENSIONS OF W. BABCOCK STREET, FALLON STREET, AND LAUREL PARKWAY
INTO 30 SINGLE-HOUSEHOLD RESIDENTIAL LOTS, 6 DUPLEX SINGLE
HOUSEHOLD LOTS, 15 MULTI-HOUSEHOLD RESIDENTIAL LOTS, 1
NEIGHBORHOOD CENTER, 73 ATTACHED SINGLE HOUSEHOLD LOTS,
INCLUDING RESTRICTED SIZE LOTS AND WORKFORCE HOUSING LOTS AND
THE REMAINING AREA AS PARKS, OPEN SPACES, STREETS AND ALLEYS ON
PROPERTY DESCRIBED AS THE NE ¼ OF THE SW ¼ AND THE NW ¼ OF THE SE ¼
, OF SECTION 9, T2S, R5E, P.M.M., GALLATIN COUNTY, MONTANA.
WHEREAS, the City of Bozeman has adopted a growth policy pursuant to Section 76-1-601,
M.C.A.; and
WHEREAS, the City of Bozeman Planning Board has been created by Resolution of the
Bozeman City Commission as provided for in Title 76-1-101, M.C.A.; and
WHEREAS, the property owner, Norton Properties, LLC, and representative, Big Sky Land
Consulting, submitted a Major Subdivision Preliminary Plat Application to subdivide 47.77 acres, located
west of Cottonwood Road between future extensions of W. Babcock Street, Fallon Street, and Laurel
Parkway into 30 single-household residential lots, 6 duplex single household lots, 15 multi-household
residential lots, 1 neighborhood center, 73 attached single household lots, including restricted size lots
and workforce housing lots and the remaining area as parks, open spaces, streets and alleys on property
legally described as the NE ¼ of the SW ¼ and the NW ¼ of the SE ¼ , of Section 9, T2S, R5E,
P.M.M., Gallatin County, Montana; and
WHEREAS, the proposed Major Subdivision Preliminary Plat Application has been properly
submitted, reviewed, and advertised in accordance with the procedures of Section 18.04 of the Bozeman
Unified Development Ordinance; and
WHEREAS, the City of Bozeman Planning Board held a public hearing on Wednesday, January
2, 2008, to review the application and any written public testimony on the request for said Major
Subdivision Preliminary Plat Application; and
WHEREAS, one member of the public provided testimony expressing concern regarding the
need for a parks maintenance district, the need for fences to catch debris, the need for fencing to
separate residential and agricultural uses, the need for additional storm drainage infrastructure, the need
for weed control, concern about impacts to Huffine Lane, and a question regarding the source of
irrigation water; and
430
The Norton East Ranch Subdivision
2
WHEREAS, members of the City of Bozeman Planning Board discussed the poroposed staff
condition regarding Cottonwood Road, the workforce housing plan, and the deficiency in dedicated
parkland; and
WHEREAS, the City of Bozeman Planning Board passed a motion to strike recommended
condition number #35; and
WHEREAS, the City of Bozeman Planning Board reviewed the application against the
requirements of the Montana Subdivision and Platting Act and found that, with conditions, the Major
Subdivision Preliminary Plat Application would comply with those requirements; and
NOW, THEREFORE, BE IT RESOLVED, that the City of Bozeman Planning Board, upon a
vote of 6-0, recommends to the Bozeman City Commission that the application to subdivide 47.77
acres, located west of Cottonwood Road between future extensions of W. Babcock Street, Fallon Street,
and Laurel Parkway into 30 single-household residential lots, 6 duplex single household lots, 15 multi-
household residential lots, 1 neighborhood center, 73 attached single household lots, including restricted
size lots and workforce housing lots and the remaining area as parks, open spaces, streets and alleys on
property legally described as the NE ¼ of the SW ¼ and the NW ¼ of the SE ¼ , of Section 9, T2S,
R5E, P.M.M., Gallatin County, Montana, be conditionally approved subject to the following conditions:
Planning Office:
1. The Final Plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform
Standards for Final Subdivision Plats and shall be accompanied by all required documents, including
certification from the City Engineer that as-built drawings for public improvements were received, a
platting certificate, and all required and corrected certificates. The Final Plat application shall
include four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or
equivalent); two (2) digital copies; one (1) PDF copy; and five (5) paper prints. The applicant is
advised that unmet code provisions, or code provisions that are not specifically listed as conditions
of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of
the Bozeman Municipal Code or state law.
2. The applicant shall submit with the application for Final Plat review and approval, a written
narrative stating how each of the conditions of preliminary plat approval and noted code provisions
have been satisfactorily addressed, and shall include a digital copy (pdf) of the entire Final Plat
submittal. This narrative shall in sufficient detail to direct the reviewer to the appropriate plat, plan,
sheet, note, covenant, etc. in the submittal.
3. Subject to the review and recommendation of the Recreation and Parks Advisory Board, the Parks
and Recreation Superintendent and final approval by the City Commission the proposed parkland
dedication requirements shall be met for this subdivision. Documentation of satisfaction of
parkland dedication requirements in accordance with Section 18.50.020 of the BMC shall be
provided. A table showing the computed park areas shall be included on the final plat pursuant to
Section 18.78.070.D of the BMC. This table shall include but is not limited to detention/retention
areas, watercourse, wetlands, watercourse setbacks, park land, and total area.
431
The Norton East Ranch Subdivision
3
4. .28 acres of additional dedicated parkland shall be provided either: onsite, offsite, or cash in lieu.
5. All dedicated park lands including linear parkways shall be titled “Public Park” on the final plat.
Notes shall be included on the plat describing ownership and maintenance responsibility for both
the park and open space areas, (e.g. public park, dedicated to the city and maintained by the
homeowners association and/or future Park Maintenance District, etc.).
6. Dedicated park land shall have frontage along 100 percent of its perimeters on public or private
streets, unless otherwise noted and as reviewed and permitted under Section 18.50.060 through the
construction of pedestrian access, off street parking and improvements within the park area as
approved in the respective final park plan(s). This further implies that all streets adjacent to parkland
for each phase of the major subdivision must be improved with said phase.
7. The Final Park Plan(s) shall include:
a. Current and future site plan(s) for the entire property with the current plan showing developer
installed improvements and the future plan showing any planned improvements not
intended to be installed by the developer;
b. The location of watercourse setbacks, wetland delineation, and wetland fringe;
c. Park landscaping plan, prepared by a qualified landscape professional in accordance with
§18.78.100 for all parkland areas including linear parkways;
d. Trail design and construction showing compliance with adopted City standards and trail
classifications;
e. The requirement for a preconstruction meeting prior to any site work, including boardwalks,
bridges, and trails;
f. Appropriate sections from the “Design Guidelines for City of Bozeman Parks”;
g. Cost estimate and installation responsibility for all improvements;
h. A neighborhood gathering place (pavilion, community building, wetland interpretation and
viewing platforms, etc.) and playground equipment in the Neighborhood Center in addition
to the standard requirement for boulevard street trees, irrigation, seeding, sidewalks, etc.
i. A notation that a building permit will be required for any structural improvements including
bridges, boardwalks, and shelter structures.
j. Parking area, design and construction drawings showing compliance with adopted City
standards including ADA parking and signage.
8. Sidewalks along park land should be constructed to a six foot width to accommodate snow removal
equipment.
9. The subdivider in consultation with MDT, the City of Bozeman, and Streamline Transit shall locate,
design, and construct a transit stop with seating, lighting, a bike rack, and a shelter at the
Neighborhood Center per section 18.44.120 of the Bozeman Municipal Code.
10. A note shall be included on the plat for all multi family lots describing park dedication allowances;
e.g. park dedication requirements for Lot 43, Block 14 have been met for 12 dwelling units, at the
time of subsequent development, when net residential density becomes known, cash-in-lieu of park
dedication requirements shall be met by the property owner for any additional density in accordance
432
The Norton East Ranch Subdivision
4
with the BMC. This note shall be recorded on the individual lots in a manner that will appear on a
title search.
11. Fences located in the front, side or rear yard setback of properties adjacent to any park or open
space shall not exceed a maximum height of 4 feet, and shall be of an open construction designed in
a manner to be consistent along all park land and open space areas. This requirement with
appropriate exhibits of fence types shall be addressed and illustrated in the home owner’s association
documents.
12. The subdivider shall provide a subdivision perimeter fencing plan to be implemented prior to final
plat. The plan shall include plans and specifications to fence the perimeter of the project including
the southern boundary of the right-of-way for Fallon Street, the north boundary of the right of way
of W. Babcock Street, the west boundary of the right of way for Laurel Parkway.
13. Hard Luck Street shall be extended east to the east property boundary of the subdivision through
Lot 1 in order to provide adequate access to undeveloped land.
14. Buildings constructed on lots along West Babcock Street, Laurel Parkway, and Fallon Street shall
either front onto those roadways and/or have double-front architectural features facing those roads
as found on the front of the dwellings units, for example; end gables, covered porches, varied roof
lines, multiple façade materials, varied façade plane, and decorative lighting. These architectural
requirements shall be addressed and demonstrated in the covenants/development guidelines. The
homeowner’s association documents shall also specify that a maximum 4’ tall fence, with
coordinated design detail, is permitted along the back of these lots.
15. All finished floor elevations be a minimum of 18 inches above the top of the curb in front of the
residence or building. This building restriction shall be addressed and demonstrated in the
covenants/development guidelines.
16. All lots that have access to an alleyway shall use the alley for access to the lot, no driveway access
from the street is allowed. This access restriction shall be addressed and demonstrated in the
covenants/development guidelines.
17. Trees may not be located within 10 feet of sewer and water services. Sewer and water services shall
be shown on the landscaping plan of the park and open space plan, and approved by the
Water/Sewer Superintendent.
18. Homeowner’s association documents shall address the requirements for street trees, a City of
Bozeman planting permit for street trees and obtaining utility locates before any excavation begins
in the City of Bozeman right-of-way. The covenants shall include a planting note stating that the
planting hole shall be at least twice the diameter of the root ball, that the root flare of the newly
planted tree is visible and above ground, and there should be a mulch ring 3’ -4’ in diameter around
each newly planted boulevard tree.
19. Street lighting, including pathway intersection lighting, shall be installed by the subdivider. Light
locations and specifications shall be provided to the City Engineer for review and approval with the
433
The Norton East Ranch Subdivision
5
public improvements plans and specifications. All street light poles shall be installed a minimum of
10’ from any water or sewer main or appurtenance.
20. Subdivision lighting SILD information shall be submitted to the Clerk of Commission after
Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete
until the resolution to create the SILD has been approved by the City Commission.
21. Should historical, cultural and/or archeological materials be inadvertently discovered during
construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman
Historic Preservation Office shall be contacted immediately and construction activities shall cease.
22. Should any species of concern, as defined by the Montana Natural Heritage Program, be discovered
on-site during construction, the Montana Department of Fish, Wildlife and Parks and the Montana
Natural Heritage Program shall be contacted immediately and construction activities shall cease.
Engineering Office:
23. The proposed lift station shall be designed and built to accommodate the sewer capacity of the full
development. However, the wastewater output from the lift station shall be limited to the amount
allocated in the 1998 Valley West Sewer Report (192,816 gpd) until the trunk sewer main as shown
in the 2007 Wastewater Facilities Plan is installed. The lift station will be owned and operated by the
City. Maintenance costs will be paid for by the homeowners by way of a surcharge on their sewer
bill.
24. Design of the lift station, including the building, will be reviewed and approved by the City
Engineering and Water/Sewer Departments. The lift station shall include a SCADA system
compatible with the City’s existing system. The lift station shall also include backup power capable
of running the entire station including all pumps.
25. A master plan and the sanitary sewer main layout for the portion of the development west and south
of Phase I shall be provided. If a sanitary sewer main and/or stubs are necessary in Laurel Parkway,
from Fallon Street to West Babcock Street, they are to be provided in this phase.
26. The lift station shall be located outside of the Baxter Creek 100 year floodplain.
27. An all-weather access must be provided to the lift station. The access, lift station, and force main
must either be on separate lots dedicated to the city, or contained within easements.
28. Any air relief valves on the sewer force main shall be accessible by the City’s flusher truck. This may
require turnout(s) to be constructed at the location of the valves.
29. Any public street rights of way for which easements have been provided (i.e. Laurel Parkway) shall
be dedicated to the City on the Final Plat for this subdivision.
30. All typical street sections, including sidewalk location within the right-of-way and provisions for
bicyclists shall be in conformance with the street standards recommended in the Greater Bozeman
434
The Norton East Ranch Subdivision
6
Area Transportation Plan, 2001 Update, unless otherwise approved by the City Commission, or by the
City Engineer through the plan and specification review and approval process.
31. City standard curb, gutter and sidewalk shall be provided along all streets in the subdivision. 6 ft
wide sidewalk will be required in the standard location adjacent to park land. The trail and sidewalk
may be combined into one facility that is 10 ft wide and constructed of concrete. The combined
walk may vary from the standard location (i.e. meander), but at the furthest, shall be no more than
15 ft from the right-of-way.
32. The trails shall connect to pedestrian ramps at the intersections or approved mid-block crossings.
33. A schematic signage plan for the subdivision, noting any proposed traffic calming measures, shall be
provided with the design report for review and approval by the City Engineer.
34. West Babcock Street, from Cottonwood Road to the eastern property boundary, would be required
to be improved to collector standard, as shown in the Greater Bozeman Area Transportation Plan
2001 Update, prior to issuance of any building permits for the development. Fallon Street, from
Cottonwood Road to the eastern property boundary, would be required to be improved to local
standard, as shown in the Greater Bozeman Area Transportation Plan 2001 Update, prior to
issuance of any building permits for the development. Laurel Parkway and West Babcock Street,
along and within the property boundary, shall be improved, as part of this development, to collector
standard as shown in the Greater Bozeman Area Transportation Plan 2001 Update. Fallon Street,
along and within the property boundary, shall be improved, as part of this development, to local
standard as shown in the Greater Bozeman Area Transportation Plan 2001 Update. City standard
curb and gutter, and sidewalk will be required in the standard location on the development’s side of
the street. Detailed review of the street and intersection design, and approval by the City Engineer
will be required as part of the infrastructure plan and specification review process.
35. Cottonwood Road is designated as a Principal Arterial in the Greater Bozeman Area Transportation
Plan. The applicant is advised the remaining half of this facility along the entire length of the
development, from West Babcock Street to Fallon Street, would be required to be constructed prior
to issuance of any building permits for the development.
36. A joint access shall be provided at Lots 123 and 124, Block 1, at Lots 121 and 122, Block 2, and at
Lots 118 and 119, Block 2, that lines up with the respective alley to the south.
37. A 1 foot no access easement shall be shown on the final plat along the entire frontage of West
Babcock Street and Laurel Parkway.
38. The driving surface on the alley typical section shall be a minimum of 16 ft wide.
39. Provide 10 ft minimum clearance from the fire hydrants to street lights, junction pedestals, and
signs.
40. All retention/detention ponds shown within the right-of-way shall be relocated outside of the right-
of-way and a temporary or permanent storm drainage easement provided.
435
The Norton East Ranch Subdivision
7
Recreation and Parks Advisory Board:
41. The E-W greenway trail along Wayward West shall be a 10’ or 12’ meandering concrete shared use
path in lieu of sidewalk.
Wetland Review Board:
42. All stormwater basins/detention ponds within the subdivision shall be naturalized by creating
irregularly-shaped basins, vegetating with native grass/emergent wetland and woody species, and
limiting the use of rock in the bottom of the basins.
43. The boardwalk trail through the north end of wetland W-5 and the two viewing platforms shall be
constructed at least 24 inches above the ground surface to preserve the wetland vegetation.
44. Place educational placards along the boardwalk and on the viewing platforms
45. The WRB shall be notified and invited to attend a preconstruction meeting prior to the construction
of any platforms or boardwalks.
DATED THIS DAY OF , 2008 Resolution #P-07047
_____________________________ ____________________________
Andrew C. Epple, Planning Director JP Pomnichowski, President
Department of Planning & Community Development City of Bozeman Planning Board
436
MINUTES
CITY OF BOZEMAN PLANNING BOARD,
WEDNESDAY, JANUARY 2, 2008
7:30 P.M.
ITEM 1. CALL TO ORDER AND ATTENDANCE
Vice President Erik Henyon called the regular meeting of the Planning Board to order at 7:34
p.m. and directed the secretary to take attendance.
Members present: Members Absent:
Erik Henyon JP Pomnichowski, President (excused)
William Quinn Kaaren Jacobson (excused)
Brian Caldwell Randy Carpenter (unexcused)
Edward Sypinski
Eric Roset
Caren Roberty
Staff Present: Guests Present:
Brian Krueger, Associate Planner Al Lien
Shoni Dykstra, Planning Secretary Marvin Howren
Sean Becker, Commissioner Liaison Tom Henesh
Ryan Gaser
Dan Simeu
Lynn Bacon
Susan Kozub
ITEM 2. PUBLIC COMMENT (0-15 MINUTES)
{Limited to any public matter within the jurisdiction of the Planning Board and
not scheduled on this agenda. Three-minute time limit per speaker.}
Seeing there was none, Vice President Henyon closed this portion of the meeting.
ITEM 3. PROJECT REVIEW
1. Subdivision Preliminary Plat Application #P-07047 (Norton East Ranch
MaSub) - A Major Subdivision Preliminary Plat Application on behalf of the
owner, Norton Properties, LLC, and the representative, Big Sky Land Consulting,
PLLC, to allow the subdivision of 47.77 acres into 127 lots for R-4 (Residential
High Density District) development and one community center lot. The property
is legally described as the SE4NW4, SW4NE4, NE4SW4, SE4SW4, NW4SE4,
SW4SE4, & 41’ x 1230’ WS of SE4SE4 City of Bozeman, Gallatin County,
Montana. (Krueger)
Staff Report:
City of Bozeman Planning Board Minutes – January 2, 2008 Page 1
437
Associate Planner Brian Krueger presented the Staff Report for the Norton East Ranch Major
Subdivision Preliminary Plat. He noted the current phase is 47.77 acres and the entire project is
approximately 240 acres. He noted the plat contained 30 single household lots, 73 attached
single household residences, and 15 multi-household lots. He noted the City Commission’s early
guidance to provide amenities for the wetlands in order to accept them as parkland. He noted the
Recreation and Parks Board recommended the combination of the City Standard sidewalk and
the meandering trails in the linear park to ease maintenance requirements. He also noted the
condition requiring the provision of a Streamline transit stop along with amenities close to the
proposed neighborhood center. He noted the plat did contain multi-household double fronted
lots. He noted that Staff is neutral on the issue as long as a provision is made in the covenants for
the double fronted design.
Planner Krueger noted that currently there is only one east-west road connection that connects to
the east property boundary. He noted Staff is currently asking for additional improvements to be
made to the property line with the intent of connection with the development of the adjoining
property. He further noted conditions forwarded by the Wetland Review Board to mitigate there
preservation concerns. He noted the project fell under the workforce housing ordinance and the
applicant had provided an additional five units to be “banked.” Planner Krueger noted the
applicant still needed to make up .28 acres of parkland as they were only able to offset .46 acres
under the Workforce Housing Ordinance. He noted the condition was to mitigate the difference
when they came back for final plat approval. He also noted public comment which had come in.
Staff is recommending approval with the listed conditions and code provisions in the Staff
Report.
Applicant Presentation
Tom Henesh of Big Sky Land Consulting presented on behalf of Norton Properties LLC. He
noted the property would be accessed from the improved Laurel Parkway which will eventually
connect at Laurel Glen and Durston. He noted amenities and access points to the wetlands. He
also showed slides demonstrating some of the proposed park structures and proposed
multifamily houses to be placed on the double fronted lots. He noted the applicant was willing to
extend the local streets on the east, and generally concurred with the conditions listed in the Staff
Report.
Questions for Applicant and Staff
Caren Roberty asked Mr. Henesh if he had responded positively to all the Staff’s conditions. Mr.
Henesh noted he was concerned about condition 35 which required the build out of Cottonwood
Road before construction could commence. He noted Cottonwood is a quarter mile to the West,
and he would like to see an SID set up for the improvements. Mr. Quinn agreed with Ms.
Roberty and would like to see some cost share for the improvements. Mr. Sypinski sought
clarification on Laurel Parkway. Planner Krueger noted the parkway would be a collector street
from Durston to Huffine.
City of Bozeman Planning Board Minutes – January 2, 2008 Page 2
438
Edward Sypinski wondered how the applicant was planning for subsequent phases and how the
applicant was planning on mitigating the high level water to alleviate the impact on surrounding
areas. Mr. Henesh noted he anticipated dams within the drain tiles to mitigate the loss of ground
level water. Vice President Henyon asked how the applicant planned on mitigating the building
of basements with the high water table since there was no notation in the narrative. Mr. Henesh
stated the applicant did not intend to allow basements and adding a notation to the plat would not
be a problem.
Mr. Caldwell addressed the parkland offsets from the workforce housing. Bill Quinn noted the
extra parkland could be made up by crediting for the extra five workforce housing units
provided. Mr. Henesh noted that he did not know how he had calculated differently than Staff.
Ms. Roberty stated the parkland requirement was to mitigate the placing of the required
workforce housing in a particular area within a development by “banking” units for future
phases. Mr. Henesh noted that the number of units provided was to show his support of the new
ordinance.
Mr. Sypinski sought clarification on how wastewater was being mitigated. Planner Krueger
noted a lift station was going to be necessary for the current proposal as there was currently
capacity for this development. He also noted there would be limitations on future phases in the
area until a sewer trunk main was installed.
Vice President Henyon sought clarification on the Recreation and Parks Board condition of the
combination of sidewalk and the linear park trail. Planner Krueger noted it was for one of the
linear parks and that it did meet UDO requirements. Vice President Henyon noted the City
Commission denied a similar combination recently. Planner Krueger noted the denied shared use
pathway bordered a higher capacity roadway. Mr. Henesh noted Ted Lange from Gallatin Valley
Land Trust recommended the same mitigation as the Recreation and Parks Board.
Public Comment
Vice President Henyon opened public comment.
Lynn Bacon representing the Wetlands Review Board noted the mitigation the Board was asking
for on the naturalizing of the stormwater basins throughout the property site. She noted the
boardwalks are a nice amenity, but that the Board requested to be involved in the preconstruction
meetings for the boardwalks. She also noted the Board was pleased with the applicant’s
agreement to use the opportunity to educate the public about wetlands. The Board commended
the applicant and the owners as they were pleased with the presented package.
Lynn Bacon who works at 3810 Suite 4 Valley Commons Drive noted the high ground water
levels on the property. She noted the applicant had included storm water basins and she would
like to see them utilized as retention ponds. She encouraged the applicant to make sure the
control structure is set high enough for the pollutants to fall out before being able to leave the
basin.
Al Lein resides at 8507 Huffine Lane and represented himself as well as the Happel
City of Bozeman Planning Board Minutes – January 2, 2008 Page 3
439
Conservation Easement. He referenced the letter he had submitted earlier to the Planning
Department regarding the project. He noted he would like to see the parks under City jurisdiction
rather than that of an HOA. He asked the applicant to share their plan for local water irrigation.
He would like to see perimeter fencing especially along the western boundary to mitigate any
east wind blown refuse as well as to protect livestock from dogs. He also noted his concern about
permanent groundwater dewatering in the area. He noted that Mr. Happel also had certified hay
and he was concerned about weed mitigation for the area while it was under construction. He
also noted his concern about the inconsistency of the speed limit along Huffine Lane.
Vice President Henyon closed public comment.
Further Questions for Applicant and Staff
Mr. Henesh responded to Mr. Lien and noted his compliance with the UDO and DEQ to meet
retention pond requirements. He further noted his understanding of the concern and stated the
ponds were not just going to be discharge ponds. He noted that the weed concern would also
affect the property owner as the future phases were going to continue in agricultural use through
the development of the current phase. He also noted the irrigation ditches would not be affected
by this particular phase. He also noted there would be breaks and dams to prevent conduits along
the water and sewer lines.
Vice President Henyon asked what weed and trash mitigation was planned for the proposal. Mr.
Henesh responded there was an approved weed plan for the plat. He noted that through the
construction process there would be mitigation in place for storm water management and
erosion.
Discussion
Mr. Quinn stated that to lessen the impact of the Cottonwood improvement for this development
the developer should look at a way to share the cost with adjacent developments to the East. He
noted he would like to consider the allowance of the full offset of the parkland due to the
additional 5 workforce housing units provided.
Mr. Caldwell noted the 2020 Plan Land Use Principals addressed integration between the
development and undeveloped areas. He stated the overall project could be more mindful of the
adjoining undeveloped areas. He stated that the parkland requirement was not unreasonable. He
noted he would like to forward the staff report as written to the City Commission. He noted the
developer may be eligible for impact fee credits, and he also noted that improvements to existing
infrastructure was usually included as an expense of building on the developed boundary. He
also noted the condition in the workforce housing ordinance to only allow for the minimum
amount of parkland credit was a disincentive to prevent high densities of workforce housing
units in a particular phase.
Eric Roset agreed with Mr. Quinn on condition four due to the amenities provided. He stated he
would like to see impact fees help alleviate the cost for improvements on Cottonwood Road.
City of Bozeman Planning Board Minutes – January 2, 2008 Page 4
440
Ms. Roberty agreed with Mr. Caldwell on the parkland requirement. She noted that since the
applicant had donated the land for Cottonwood to begin with she was not in favor of Condition
35.
Mr. Sypinski noted his main concern about the proposal was the wetlands and the possible
impact on the high ground level water. He agreed with Ms. Roberty and Mr. Caldwell about
leaving in condition 4 as he feels even the credit of the wetlands towards parkland requirements
is questionable. He noted the burden should be shared on the improvements towards
Cottonwood, but further noted he does not have a problem with having the condition in the
report.
Vice President Henyon noted he liked condition 13 which addressed the connectivity of Hard
Luck Street. He stated he agreed with Mr. Roset that condition 35 was a good place to use
impact fees rather than an SID. He noted the use of wetlands to fulfill parkland credits was
complete and unique. He still is going to recommend the awarding of parkland credits for each
proposed unit and the striking of condition 4.
Ms. Roberty noted the City Commission might want to consider other incentives for providing
more affordable housing units as parkland credits are not always the best option.
Motion and Vote
It was moved by Ms. Roberty, seconded by Mr. Quinn, to recommend striking condition 35 from
the Staff Report with the recommended mitigation to look at a way to share the cost as
Cottonwood is not adjacent to the property. Those voting Aye being Mr. Quinn, Ms. Roberty,
and Vice President Henyon. Those voting No being Mr. Roset, Mr. Sypinski, and Mr. Caldwell.
The motion failed 3-3.
It was moved by Mr. Roset, seconded by Ms. Roberty, to recommend the striking of condition
35 from the Staff Report with the recommended mitigation to fund improvements through
impact fees. Those voting Aye being Mr. Roset. Those voting No being Mr. Quinn, Ms. Roberty,
Vice President Henyon, Mr. Sypinski, and Mr. Caldwell. The motion failed 1-5.
It was moved by Ms. Roberty, seconded by Mr. Roset, to recommend the striking of condition
35 from the Staff Report. Those voting Aye being Mr. Quinn, Ms. Roberty, Mr. Roset, and Vice
President Henyon. Those voting No being Mr. Sypinski and Mr. Caldwell. The motion carried 4-
2.
It was moved by Vice President Henyon, seconded by Mr. Roset, to recommend striking
condition 4 from the Staff Report. Those voting Aye being Vice President Henyon, Mr. Quinn,
and Mr. Roset. Those voting No being Ms. Roberty, Mr. Sypinski, and Mr. Caldwell. The
motion failed 3-3.
It was moved by Mr. Quinn, seconded by Mr. Sypinski, to recommend approval of the Norton
East Ranch Major Subdivision Preliminary Plat Application #P-07047 to the City Commission
as outlined in the Staff Report and amended by the Planning Board. Those voting Aye being Mr.
City of Bozeman Planning Board Minutes – January 2, 2008 Page 5
441
Quinn, Ms. Roberty, Mr. Roset, Vice President Henyon, Mr. Sypinski, and Mr. Caldwell. The
motion carried 6-0.
ITEM 4. NEW BUSINESS
1. Planning Board By-Laws
The members of the Planning Board discussed various changes they would like to see made to
the Planning Board by-laws which they then submitted in writing.
ITEM 5. ADJOURNMENT
There being no further business to come before the Planning Board at this time, Vice President
Vice President Henyon adjourned the meeting at 9:28 p.m.
_________________________________ ___________________________________
Erik Henyon, Vice President Andrew C. Epple, Director
Planning Board Planning & Community Development
City of Bozeman City of Bozeman
City of Bozeman Planning Board Minutes – January 2, 2008 Page 6
442
PLANNING BOARD & CITY COMMISSION STAFF REPORT FILE NO. #P-07047
THE NORTON EAST RANCH MAJOR SUBDIVISION PRELIMINARY PLAT
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 1
Item: Subdivision Preliminary Plat Application #P-07047, to subdivide 47.77
acres, located west of Cottonwood Road between future extensions of
W. Babcock Street, Fallon Street, and Laurel Parkway into 30 single-
household residential lots, 6 duplex single household lots, 15 multi-
household residential lots, 1 neighborhood center, 73 attached single
household lots, including restricted size lots and workforce housing
lots and the remaining area as parks, open spaces, streets and alleys.
Property Owner/ Norton Properties, LLC
Applicant: 63020 Lower Meadow Road Suite A
Bend, OR 97701
Representative: Big Sky Land Consulting
5530 Burnt Road
Belgrade, MT 59714
Date/Time: Before the Bozeman Planning Board on Wednesday, January 2, 2008 at
7:00 PM and before the Bozeman City Commission on Tuesday,
January 22, 2008 at 6:00 PM, both in the Community Room, Gallatin
County Courthouse, 311 West Main Street, Bozeman, Montana
Report By: Brian Krueger, Associate Planner
Recommendation: Conditional Approval
___________________________________________________________________________________
PROJECT LOCATION
The subject property is located west of Cottonwood Road between future extensions of W. Babcock Street
and Fallon Street and is bound on the west by a future extension of Laurel Parkway and is legally described
as the NE ¼ of the SW ¼ and the NW ¼ of the SE ¼ , of Section 9, T2S, R5E, P.M.M., Gallatin County,
Montana.
The property is annexed with a preliminary zoning designation of R-4 (Residential High Density District)
Please refer to the vicinity map on Page 2 of this report.
443
PROPOSAL
Norton Properties, LLC., represented by Big Sky Land Consulting, has submitted a Major Subdivision
Preliminary Plat application to allow 47.77 acres, located west of Cottonwood Road between future
extensions of Fallon Street and West Babcock Street, to be subdivided into 30 single-household residential
lots, 6 duplex single household lots, 15 multi-household residential lots, 1 neighborhood center, 73 attached
single household lots, including restricted size lots and workforce housing lots and the remaining area as
parks, open spaces, streets and alleys.
This property is a portion of the 241 acre Norton Annexation which was approved by the City Commission
in August of 2006.
Access to the subdivision will be provided by three perimeter streets, two of which will connect to
Cottonwood Road. The proposed subdivision is bound on the west by Laurel Parkway (collector), on the
north by West Babcock St. (collector) and on the south by Fallon Street (local). There are several dedicated
parkland areas proposed as part of this development including an extensive non jurisdictional wetland, a
neighborhood center park, linear parkways and a neighborhood “tot lot” park. The proposed neighborhood
center includes pavilions, a transit stop and boardwalk connections to the wetlands area.
No variances have been requested with this application.
RECOMMENDED CONDITIONS OF APPROVAL
The recommended conditions of approval do not include code requirements identified in the staff findings.
Mandatory compliance with the explicit terms of Title 18, BMC does not constitute conditions of approval.
The conditions of approval may require compliance with more than the minimum standards in order to
conform to the physical and economic development of the City, and to the safety and general welfare of the
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 2 444
future lot owners and of the community at large. The applicant must comply with all provisions of the
Bozeman Municipal Code which are applicable to this project.
The Development Review Committee finds that the Preliminary Plat application, with conditions, is in
general compliance with the adopted growth policy, the Montana Subdivision and Platting Act and the
Unified Development Ordinance. The Planning Board may provide advice and comments on the following
recommended conditions of approval:
Planning Office:
1. The Final Plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform
Standards for Final Subdivision Plats and shall be accompanied by all required documents, including
certification from the City Engineer that as-built drawings for public improvements were received, a
platting certificate, and all required and corrected certificates. The Final Plat application shall include
four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two
(2) digital copies; one (1) PDF copy; and five (5) paper prints. The applicant is advised that unmet code
provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any
way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or
state law.
2. The applicant shall submit with the application for Final Plat review and approval, a written narrative
stating how each of the conditions of preliminary plat approval and noted code provisions have been
satisfactorily addressed, and shall include a digital copy (pdf) of the entire Final Plat submittal. This
narrative shall in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note,
covenant, etc. in the submittal.
3. Subject to the review and recommendation of the Recreation and Parks Advisory Board, the Parks and
Recreation Superintendent and final approval by the City Commission the proposed parkland dedication
requirements shall be met for this subdivision. Documentation of satisfaction of parkland dedication
requirements in accordance with Section 18.50.020 of the BMC shall be provided. A table showing the
computed park areas shall be included on the final plat pursuant to Section 18.78.070.D of the BMC.
This table shall include but is not limited to detention/retention areas, watercourse, wetlands,
watercourse setbacks, park land, and total area.
4. .28 acres of additional dedicated parkland shall be provided either: onsite, offsite, or cash in lieu.
5. All dedicated park lands including linear parkways shall be titled “Public Park” on the final plat. Notes
shall be included on the plat describing ownership and maintenance responsibility for both the park and
open space areas, (e.g. public park, dedicated to the city and maintained by the homeowners association
and/or future Park Maintenance District, etc.).
6. Dedicated park land shall have frontage along 100 percent of its perimeters on public or private streets,
unless otherwise noted and as reviewed and permitted under Section 18.50.060 through the construction
of pedestrian access, off street parking and improvements within the park area as approved in the
respective final park plan(s). This further implies that all streets adjacent to parkland for each phase of
the major subdivision must be improved with said phase.
7. The Final Park Plan(s) shall include:
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 3 445
a. Current and future site plan(s) for the entire property with the current plan showing developer
installed improvements and the future plan showing any planned improvements not intended to
be installed by the developer;
b. The location of watercourse setbacks, wetland delineation, and wetland fringe;
c. Park landscaping plan, prepared by a qualified landscape professional in accordance with
§18.78.100 for all parkland areas including linear parkways;
d. Trail design and construction showing compliance with adopted City standards and trail
classifications;
e. The requirement for a preconstruction meeting prior to any site work, including boardwalks,
bridges, and trails;
f. Appropriate sections from the “Design Guidelines for City of Bozeman Parks”;
g. Cost estimate and installation responsibility for all improvements;
h. A neighborhood gathering place (pavilion, community building, wetland interpretation and
viewing platforms, etc.) and playground equipment in the Neighborhood Center in addition to
the standard requirement for boulevard street trees, irrigation, seeding, sidewalks, etc.
i. A notation that a building permit will be required for any structural improvements including
bridges, boardwalks, and shelter structures.
j. Parking area, design and construction drawings showing compliance with adopted City standards
including ADA parking and signage.
8. Sidewalks along park land should be constructed to a six foot width to accommodate snow removal
equipment.
9. The subdivider in consultation with MDT, the City of Bozeman, and Streamline Transit shall locate,
design, and construct a transit stop with seating, lighting, a bike rack, and a shelter at the Neighborhood
Center per section 18.44.120 of the Bozeman Municipal Code.
10. A note shall be included on the plat for all multi family lots describing park dedication allowances; e.g.
park dedication requirements for Lot 43, Block 14 have been met for 12 dwelling units, at the time of
subsequent development, when net residential density becomes known, cash-in-lieu of park dedication
requirements shall be met by the property owner for any additional density in accordance with the BMC.
This note shall be recorded on the individual lots in a manner that will appear on a title search.
11. Fences located in the front, side or rear yard setback of properties adjacent to any park or open space
shall not exceed a maximum height of 4 feet, and shall be of an open construction designed in a manner
to be consistent along all park land and open space areas. This requirement with appropriate exhibits of
fence types shall be addressed and illustrated in the home owner’s association documents.
12. The subdivider shall provide a subdivision perimeter fencing plan to be implemented prior to final plat.
The plan shall include plans and specifications to fence the perimeter of the project including the
southern boundary of the right-of-way for Fallon Street, the north boundary of the right of way of W.
Babcock Street, the west boundary of the right of way for Laurel Parkway.
13. Hard Luck Street shall be extended east to the east property boundary of the subdivision through Lot 1
in order to provide adequate access to undeveloped land.
14. Buildings constructed on lots along West Babcock Street, Laurel Parkway, and Fallon Street shall either
front onto those roadways and/or have double-front architectural features facing those roads as found
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 4 446
on the front of the dwellings units, for example; end gables, covered porches, varied roof lines, multiple
façade materials, varied façade plane, and decorative lighting. These architectural requirements shall be
addressed and demonstrated in the covenants/development guidelines. The homeowner’s association
documents shall also specify that a maximum 4’ tall fence, with coordinated design detail, is permitted
along the back of these lots.
15. All finished floor elevations be a minimum of 18 inches above the top of the curb in front of the
residence or building. This building restriction shall be addressed and demonstrated in the
covenants/development guidelines.
16. All lots that have access to an alleyway shall use the alley for access to the lot, no driveway access from
the street is allowed. This access restriction shall be addressed and demonstrated in the
covenants/development guidelines.
17. Trees may not be located within 10 feet of sewer and water services. Sewer and water services shall be
shown on the landscaping plan of the park and open space plan, and approved by the Water/Sewer
Superintendent.
18. Homeowner’s association documents shall address the requirements for street trees, a City of Bozeman
planting permit for street trees and obtaining utility locates before any excavation begins in the City of
Bozeman right-of-way. The covenants shall include a planting note stating that the planting hole shall be
at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and
above ground, and there should be a mulch ring 3’ -4’ in diameter around each newly planted boulevard
tree.
19. Street lighting, including pathway intersection lighting, shall be installed by the subdivider. Light
locations and specifications shall be provided to the City Engineer for review and approval with the
public improvements plans and specifications. All street light poles shall be installed a minimum of 10’
from any water or sewer main or appurtenance.
20. Subdivision lighting SILD information shall be submitted to the Clerk of Commission after Preliminary
Plat approval in hard copy and digital form. The final plat will not be deemed complete until the
resolution to create the SILD has been approved by the City Commission.
21. Should historical, cultural and/or archeological materials be inadvertently discovered during
construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman Historic
Preservation Office shall be contacted immediately and construction activities shall cease.
22. Should any species of concern, as defined by the Montana Natural Heritage Program, be discovered on-
site during construction, the Montana Department of Fish, Wildlife and Parks and the Montana Natural
Heritage Program shall be contacted immediately and construction activities shall cease.
Engineering Office:
23. The proposed lift station shall be designed and built to accommodate the sewer capacity of the full
development. However, the wastewater output from the lift station shall be limited to the amount
allocated in the 1998 Valley West Sewer Report (192,816 gpd) until the trunk sewer main as shown in
the 2007 Wastewater Facilities Plan is installed. The lift station will be owned and operated by the City.
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 5 447
Maintenance costs will be paid for by the homeowners by way of a surcharge on their sewer bill.
24. Design of the lift station, including the building, will be reviewed and approved by the City Engineering
and Water/Sewer Departments. The lift station shall include a SCADA system compatible with the
City’s existing system. The lift station shall also include backup power capable of running the entire
station including all pumps.
25. A master plan and the sanitary sewer main layout for the portion of the development west and south of
Phase I shall be provided. If a sanitary sewer main and/or stubs are necessary in Laurel Parkway, from
Fallon Street to West Babcock Street, they are to be provided in this phase.
26. The lift station shall be located outside of the Baxter Creek 100 year floodplain.
27. An all-weather access must be provided to the lift station. The access, lift station, and force main must
either be on separate lots dedicated to the city, or contained within easements.
28. Any air relief valves on the sewer force main shall be accessible by the City’s flusher truck. This may
require turnout(s) to be constructed at the location of the valves.
29. Any public street rights of way for which easements have been provided (i.e. Laurel Parkway) shall be
dedicated to the City on the Final Plat for this subdivision.
30. All typical street sections, including sidewalk location within the right-of-way and provisions for
bicyclists shall be in conformance with the street standards recommended in the Greater Bozeman Area
Transportation Plan, 2001 Update, unless otherwise approved by the City Commission, or by the City
Engineer through the plan and specification review and approval process.
31. City standard curb, gutter and sidewalk shall be provided along all streets in the subdivision. 6 ft wide
sidewalk will be required in the standard location adjacent to park land. The trail and sidewalk may be
combined into one facility that is 10 ft wide and constructed of concrete. The combined walk may vary
from the standard location (i.e. meander), but at the furthest, shall be no more than 15 ft from the right-
of-way.
32. The trails shall connect to pedestrian ramps at the intersections or approved mid-block crossings.
33. A schematic signage plan for the subdivision, noting any proposed traffic calming measures, shall be
provided with the design report for review and approval by the City Engineer.
34. West Babcock Street, from Cottonwood Road to the eastern property boundary, would be required to
be improved to collector standard, as shown in the Greater Bozeman Area Transportation Plan 2001
Update, prior to issuance of any building permits for the development. Fallon Street, from Cottonwood
Road to the eastern property boundary, would be required to be improved to local standard, as shown in
the Greater Bozeman Area Transportation Plan 2001 Update, prior to issuance of any building permits
for the development. Laurel Parkway and West Babcock Street, along and within the property boundary,
shall be improved, as part of this development, to collector standard as shown in the Greater Bozeman
Area Transportation Plan 2001 Update. Fallon Street, along and within the property boundary, shall be
improved, as part of this development, to local standard as shown in the Greater Bozeman Area
Transportation Plan 2001 Update. City standard curb and gutter, and sidewalk will be required in the
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 6 448
standard location on the development’s side of the street. Detailed review of the street and intersection
design, and approval by the City Engineer will be required as part of the infrastructure plan and
specification review process.
35. Cottonwood Road is designated as a Principal Arterial in the Greater Bozeman Area Transportation
Plan. The applicant is advised the remaining half of this facility along the entire length of the
development, from West Babcock Street to Fallon Street, would be required to be constructed prior to
issuance of any building permits for the development.
36. A joint access shall be provided at Lots 123 and 124, Block 1, at Lots 121 and 122, Block 2, and at Lots
118 and 119, Block 2, that lines up with the respective alley to the south.
37. A 1 foot no access easement shall be shown on the final plat along the entire frontage of West Babcock
Street and Laurel Parkway.
38. The driving surface on the alley typical section shall be a minimum of 16 ft wide.
39. Provide 10 ft minimum clearance from the fire hydrants to street lights, junction pedestals, and signs.
40. All retention/detention ponds shown within the right-of-way shall be relocated outside of the right-of-
way and a temporary or permanent storm drainage easement provided.
Recreation and Parks Advisory Board:
41. The E-W greenway trail along Wayward West shall be a 10’ or 12’ meandering concrete shared use path
in lieu of sidewalk.
Wetland Review Board:
42. All stormwater basins/detention ponds within the subdivision shall be naturalized by creating
irregularly-shaped basins, vegetating with native grass/emergent wetland and woody species, and
limiting the use of rock in the bottom of the basins.
43. The boardwalk trail through the north end of wetland W-5 and the two viewing platforms shall be
constructed at least 24 inches above the ground surface to preserve the wetland vegetation.
44. Place educational placards along the boardwalk and on the viewing platforms
45. The WRB shall be notified and invited to attend a preconstruction meeting prior to the construction of
any platforms or boardwalks.
ZONING DESIGNATION & LAND USES
The subject property is currently vacant and was annexed to the City in 2006. The property was given an
initial zoning designation of R-4 (Residential High Density District).
The intent of the R-4 is to provide for high density residential development through a variety of housing
types within the City with associated service functions. This will provide a variety of compatible housing
types to serve the varying needs of the community’s residents. The net density, as defined in Chapter 18.80,
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 7 449
BMC, for new developments shall be 8 dwelling units per acre or greater.
The following land uses and zoning are adjacent to the subject property:
North: Vacant and/or used for agriculture; zoned R-4;
South: Vacant and/or used for agriculture; zoned R-O;
The intent of the R-O (Residential-Office District) is to provide for and encourage the development of
multi-household and apartment development, and compatible professional offices and businesses, that
would blend well with adjacent land uses. The primary use of a lot, as measured by building area, permitted
in the R-O district is determined by the underlying growth policy land use designation. Where the district
lies over a Residential growth policy designation the primary use shall be non-office uses; where the district
lies over a non-residential designation the primary use shall be office and other non-residential uses. Primary
use shall be measured by percentage of building floor area
East: Vacant and/or used for agriculture; zoned R-4;
West: Vacant and/or used for agriculture; zoned R-3.
The intent of the R-3 (Residential Medium Density District) is to provide for the development of one- to
five-household residential structures near service facilities within the City. It should provide for a variety of
housing types to serve the varied needs of households of different size, age and character, while reducing
the adverse effect of nonresidential uses.
GROWTH POLICY DESIGNATION
The 47.77 acres proposed for subdivision under this application is wholly surrounded by areas designated
residential on the Growth Policy Land Use Map within the 2020 Plan.
Residential. This category designates places where the primary activity is urban density living quarters.
Other uses which complement residences are also acceptable such as parks, low intensity home based
occupations, fire stations, churches, and schools. The residential designation also indicates that it is
expected that development will occur within municipal boundaries which may require annexation prior to
development. The dwelling unit density expected within this classification varies. It is expected that areas of
higher density housing would be likely to be located in proximity to commercial centers to facilitate the
broadest range of feasible transportation options for the greatest number of individuals and support
businesses within commercial centers. Low density areas should have an average minimum density of six
units per net acre. Medium density areas should have an average minimum density of twelve units per net
acre. High density areas should have an average minimum density of eighteen units per net acre. A variety
of housing types should be blended to achieve the desired density with large areas of single type housing
being discouraged. In limited instances the strong presence of constraints and natural features such as
floodplains may cause an area to be designated for development at a lower density than normally expected
within this classification.
All residential housing should be arranged with consideration given to the existing character of adjacent
development, any natural constraints such as steep slopes, and in a fashion which advances the overall goals
of the Bozeman 2020 Community Plan. The residential designation is intended to provide the principal
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 8 450
locations for additional housing within the Planning Area.
The following growth policy designations are adjacent to the subject property:
North: Vacant and/or used for agriculture; designated residential;
South: Vacant and/or used for agriculture; designated residential;
East: Vacant and/or used for agriculture; designated residential;
West: Vacant and/or used for agriculture; designated residential.
PRELIMINARY PLAT SUPPLEMENTS
A subdivision pre-application review for this project was completed by the Development Review
Committee on May 30, 2007, the Planning Board on June 5, 2007, and the City Commission on June
25, 2007.
During the pre-application review, no waivers were requested from Section 18.78.060, Additional
Subdivision Preliminary Plat Supplements, and the following supplemental items have been provided as part
of this preliminary plat application:
18.78.060.A Surface Water
Surface water resources found within the subdivision boundaries include an underground
drain/irrigation ditch that discharges to Baxter Creek in the NE corner of the property and an
irrigation ditch that discharges to Baxter Ditch outside the SE corner of the property. The road
extensions of W. Babcock Street and Fallon Street will also cross Baxter Creek, a tributary of the
East Gallatin River, which is classified as a perennial stream by the Gallatin County Conservation
District. The W. Babcock and Fallon Street Crossing are planned extensions of the Bozeman Area
Street Network as identified in the 2001 Transportation Plan.
There are six areas in the proposed subdivision area that meet the wetland criteria. There are two
wetland areas that are under the jurisdiction of the US Army Corps of Engineers and four wetlands
that are classified as non-jurisdictional and are under the purview of the City of Bozeman.
Surface water and wetland information is also found in Section 4 of the primary subdivision binder
and the Wetland Mitigation Plan and Delineation Report included in the applicant’s submittal
materials.
18.78.060.B Floodplains
The subject property is located outside of any identified floodplain areas, although the Flood Hazard
Evaluation performed for Baxter Creek recommends that all finished floor elevations be a minimum
of 18 inches above the top of the curb in front of the residence.
18.78.060.C Groundwater
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 9 451
The entire subdivision includes areas of shallow ground water. Static water levels within the test
wells are between 2 and 8 feet below the surface. A more detailed soils and groundwater report will
be completed at the time of engineering design. Additional information is provided in Section 12 of
the applicant’s submittal materials
18.78.060.D Geology, Soils and Slopes
The subject property does not contain any geologic hazards or any unusual soil, topographic or
geologic conditions that would preclude construction in the proposed development locations. The
applicants provided a geotechnical investigation report, soils maps and reports from the Natural
Resource Conservation Service. Cuts and fills in excess of 3 feet are not anticipated. This
information is provided in Section 13 of the applicant’s submittal materials. The Building
Department will require a soils analysis to be provided with each application for a building permit
within the proposed subdivision.
18.78.060.E Vegetation
The majority of the property has been historically used for agricultural cultivation (e.g. mixed grains
and hay crops and livestock pasture) with the balance in native species within the wetland areas.
There are some trees and shrubs in the protected open space areas primarily in association with the
identified wetland areas. There are some noxious weeds present and a Memorandum of
Understanding for a weed control plan with the County Weed District is required with the Final
Plat.
18.78.060.F Wildlife
According to the preliminary wildlife assessment there are no known endangered species or critical
game ranges on site. Deer are commonly seen on the property along with small animals, rodents and
birds. Comments by the Montana Department of Fish, Wildlife and Parks have been received and
only include generic subdivision comments that relate to impacts to the local waterways from road
building, drainage within the subdivision and sediment release due to construction disturbance. See
section 16 of the application materials for additional information.
18.78.060.G Historical Features
The applicant sent a letter to the State Historical Preservation Office requesting a cultural resource
file search. A copy of SHPO’s response is included in Section 16 of the applicant’s submittal
materials which indicated that there is a low likelihood cultural properties will be impacted and a
cultural resource inventory is unwarranted at this time. Anthro Research conducted a cultural
resource evaluation on the property. The study indicated that no evidence of cultural resources was
found. Should historical, cultural and/or archeological materials be inadvertently discovered during
construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman
Historic Preservation Office shall be contacted immediately and construction activities shall cease.
18.78.060.H Agriculture
The majority of this property has been used for agricultural purposes in the past. The property is
currently used for livestock pasture and has been fenced to protect the surrounding rotational crops.
Staff recommends a condition that the subdivider provide a perimeter fencing plan for review
approval, and implementation prior to final plat.
18.78.060.I Agricultural Water User Facilities
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 10452
Baxter Ditch and Baxter Creek are the only conveying water sources that may be impacted by the
subdivision. The only disturbance to these water sources is from the installation of culverts due to
the extensions of W. Babcock Street and Fallon Street. All alterations and culvert installations are
permitted and will be required to be monitored and inspected as installation occurs. No impacts to
water users are anticipated.
18.78.060.J Water and Sewer
Existing water mains in the vicinity of the property will be extended throughout the development to
serve the individual lots and includes capacity to serve the proposed development. In addition, larger
main extensions will be provided to Cottonwood Road in order to serve future development and the
Engineering Department has made specific sizing conditions for these mains as noted in the City’s
Water Facility Plan. A lift station for sewer service is required with the subdivision infrastructure.
Water for domestic and fire use will be provided by a connection to existing 12” water main within
Cottonwood Road.
Sewer will flow north from the subdivision along the future Laurel Parkway to a point where a lift
station will be constructed which will pump the sewage north to Durston Road and then east to the
intersection of Durston Road and Cottonwood Road where the sewage will continue north to the
City Waste Treatment Plant.
Water and Sewer infrastructure is also addressed in the preliminary engineering design report in
Section 24 of the applicant’s submittal materials.
18.78.060.K Stormwater Management
Stormwater management utilities will be constructed in accordance with the City of Bozeman’s
current design standards. The preliminary engineering report provides a detailed stormwater runoff
analysis of the proposed development including detention requirements to limit runoff to pre-
development 10-year recurrence flows. Additional detailed analysis will be prepared for stormwater
utilities to be constructed to serve development and manage runoff in accordance with the City’s
requirements during specific engineering design for the subdivision.
Stormwater management is also addressed in the preliminary stormwater report in Section 23 of the
applicant’s submittal materials.
18.78.060.L Streets, Roads and Alleys
The subject property is currently not directly adjacent to the City’s constructed road system the
primary access to the new subdivision will be from Cottonwood Road (a principal arterial).
Extensions of West Babcock Street (a collector) and Fallon Street (a local) to the west will provide
the north and south boundaries of the subdivision. The subdivision will be bound on the west a
section of Laurel Parkway that will connect West Babcock Street and Fallon Street to provide a
looped access to the subdivision. All major roads within the subdivision are anticipated to be
extended with future subdivisions within the Norton Property.
Section 18.44.010.A. BMC “Streets” Requires that “when a proposed development adjoins
undeveloped land, and access to the undeveloped land would reasonably pass through the new
development, streets within the proposed development shall be arranged to allow suitable
development of the adjoining undeveloped land. Streets within the proposed development shall be
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 11453
constructed to the boundary lines of the tract to be developed, unless prevented by topography, or
other physical conditions, in which case a subdivision variance must be approved by the City
Commission.” Staff has identified a deficiency within the street connectivity to adjacent land. Staff
recommends that Hard Luck Street be extended to the east property boundary. This is proposed in
order to provide a future connection to property zoned R-4 (High Density Residential) to the east of
the subdivision. This property is bound by Baxter Creek on the east and will have little road access
opportunities that would meet city intersection spacing standards along W. Babcock Street. Staff
recommends the Hard Luck Street extension in order to provide a logical looped road access back
to Wayward West Street, which extends to the east property boundary to the south.
The applicant proposes to construct the local streets to a width of 33 feet with a five foot sidewalk
and a 7.5’ boulevard. All sidewalks adjacent to parkland is required to be constructed to a six foot
width. The subdivision provides extensive use of alleyways for access to the individual lots. Alleys
will be constructed to a sixteen foot wide paved surface within a 20 foot right of way.
This project also proposes an extensive trail system throughout the subdivision with significant east
west connections to the future north south trail system anticipated within the Baxter Creek
watercourse setback on adjacent land to the east.
No lots in the subdivision will have direct access to West Babcock (collector) or Laurel Parkway
(collector).
West Babcock Street, Fallon Street, Laurel Parkway will be constructed to the full width adjacent to
the project in accordance with the Bozeman Transportation Plan and the Traffic Impact Study
completed by Engineering Inc. for this project. The Engineering Department is also recommending
that the west side of Cottonwood Road between West Babcock Street and Fallon Street be upgraded
to the current required standards.
Additional details for the proposed roads and alleys are included in Section 21 of the applicant’s
submittal materials including the Traffic Impact Study (TIS) completed by Engineering Inc.
18.78.060.M Utilities
The applicants have included letters from Bresnan Communications and Northwestern Energy
regarding their ability to serve the project. The applicants have requested a letter from Qwest but no
letter has been provided regarding phone service.
The utility providers responding indicated that private utilities can be provided to this subdivision.
Northwestern Energy will be providing services in the alleyways with additional easements provided
along other front and side lot lines as required.
For additional information regarding these utilities, see Section 18 of the applicant’s submittal
materials.
18.78.060.N Educational Facilities
Ed Sondeno, Director of Facilities, Bozeman Public Schools, notes in his correspondence of January
February 13, 2007 that the proposed subdivision would generate the following students: K-5 – 37
students, 6-8 – 19 students and 9-12 – 25 students. Mr. Sondeno responded that there is not current
classroom space for K-5 students and 9-12 students, although the District is currently planning and
constructing new facilities. Mr. Sondeno further indicated that their existing bus system can
accommodate the additional students.
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 12454
18.78.060.O Land Use
This proposal includes 30 single-household residential lots, 6 duplex single household lots, 15 multi-
household residential lots, 1 neighborhood center, 73 attached single household lots, including
restricted size lots and workforce housing lots and the remaining area as parks, open spaces, streets
and alleys.
The location of the proposed land uses are in general compliance with the City of Bozeman zoning
map. The overall density of this project satisfies the requirement for a net residential density of 8
dwelling units per acre as anticipated in the R-4 Residential High Density District. The proposal is
also consistent with the Restricted Size Lot requirements of Section 18.42.180 and the workforce
housing requirements of Chapter 17.02 BMC. The applicant’s proposal was reviewed by the
Community Affordable Housing Advisory Board (CAHAB) on December 5, 2007 where the
proposal received a positive recommendation.
As this subdivision will have double frontage lots located along collector and local streets, (West
Babcock Street and Laurel Parkway), staff has included a suggested condition of approval to address
these proposed “double fronted lots” to require double fronted home designs, including having a
true front presentation towards the arterials with porches, front doors, no garage fronts, and
coordinated 4’ tall (maximum) fencing with gates/openings and walkway connections providing
access to the streetscape and sidewalk system. This is intended to assure an attractive presentation to
these perimeter roadways.
18.78.060.P Parks and Recreation Facilities
The preliminary Parks and Trails Master Plan is provided as a standalone document provided with
of the applicant’s submittal materials.
Based on 322 dwelling units at 0.03 acres of parkland per dwelling unit, 9.66 acres of dedicated
parkland is required with this major subdivision. The applicant has proposed approximately 9.68
acres of parkland identified in their application as “Dedicated Parks” (8.37 acres) and a
Neighborhood Center which will be dedicated as parkland (1.00 acre). There are .45 acres of
detention ponds located within the proposed parkland that must be deducted from the 8.37 acres.
The applicant is also requesting a .76 acre parkland credit per the workforce housing program in
Chapter 17.02 BMC.
Staff has analyzed the request for parkland credit and it appears the applicant is asking for parkland
credit above what is allowed by Chapter 17.02 BMC. The applicant may only take credit for the
required workforce units at the minimum lot size allowed, even though the applicant is proposing
additional workforce units above and beyond the minimum requirement and in lot sizes that are
larger than required by the program.
The dedicated park areas proposed are the neighborhood center (1.00 acre), the wetland area (4.02
acres) and the park area to the south and east of the wetland (2.77 acres), the neighborhood “tot
lot”(.47 acres) and the linear parkways (1.1 acres). The total parkland to be dedicated is thus 9.36
acres. Out of that area .45 acres must be deducted for the stormwater detention ponds located
within the 2.77 acre park area to the south and east of the wetland area. With the detention pond
area deducted 8.91 acres are provided. The applicant had requested a .76 acre credit for workforce
housing. According to staff’s calculation the applicant may only take a .47 acre credit for the 8
required workforce units (3 detached single family @ 2,700 square feet and 5 attached single family
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 13455
@ 2,500 square feet). With the workforce credit applied the applicant is providing 9.38 acres of
parkland and is required to provide 9.66 acres of parkland. Staff has added a proposed condition to
the subdivision that .28 acres of additional parkland shall be provided: onsite, offsite, or cash in lieu.
Additional discussion of the parks and trails proposed for this project, and the phasing of these
amenities, is discussed further in the Staff Findings/Review Criteria section of this report.
18.78.060.Q Neighborhood Center Plan
The proposed preliminary plat identifies the development of the 1 acre park area bound by the
wetland, Laurel Parkway, and West Babcock Street as a neighborhood center. This area is proposed
to contain pavilions picnic shelters, and seating. ADA accessible trails including a bridge and
boardwalk will lead from the parking area to the neighborhood center. A transit stop is proposed
along Laurel Parkway with direct sidewalk access to the neighborhood center. City approval of a
final park plan will be required for this neighborhood center area.
18.78.060.R Lighting Plan
The applicant’s proposed lighting plan is provided in Section 19 of their submittal materials. Street
lights are proposed for perimeter roadways and the intersections of local streets with additional
lighting at trail and street intersections.
STAFF FINDINGS/REVIEW CRITERIA
The basis for the City Commission’s decision to approve, conditionally approve or disapprove the
subdivision shall be whether the preliminary plat, public hearing if required, Planning Board advice and
recommendation, and additional information demonstrate that development of the subdivision complies
with this title, the City’s growth policy, the Montana Subdivision and Platting Act, and other adopted state
and local ordinances, including, but not limited to, applicable zoning requirements. The Montana
Subdivision and Platting Act, Section 76-3-608, establishes the following primary review criteria for the
governing body to consider when evaluating subdivisions. Planning Staff, the DRC, and other reviewing
agencies have made comments in relation to those and other criteria as described below, and have
recommended conditions as outlined at the beginning of this staff report.
A. Primary Review Criteria
1. Effects on Agriculture
The property has been previously annexed and, while a significant portion has remained
under cultivation, has been zoned and master planned for residential and parks uses.
2. Effects on Agricultural Water User Facilities
No effects on agricultural water user facilities have been identified for this project.
3. Effects on Local Services
The Bozeman 2020 Community Plan identifies this property as lying within the “Capital
Facilities Overlay District” (Figure 6-2). The “Capital Facilities Overlay District” is intended
to establish a priority area for development within the larger scope of the Bozeman 2020
Community Plan future land use plan. This is an area within the long-range growth area of
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 14456
the City where services would be most efficiently provided in the near term and where
development in the near term would advance the goals of the 2020 Plan.
Water/Sewer. Water and sewer main extensions and upgrades will be required to serve this
development. Therefore, the standard code requirements apply, including the requirements
for plans and specifications, detailed design reports, and engineering services for
construction inspection, post-construction certification and preparation of mylar record
drawings applies. No building permits will be issued prior to substantial completion and
City acceptance of required water and sewer infrastructure improvements.
The Engineering Department has recommended conditions requiring that the lift station
proposed shall be constructed to accommodate the sewer capacity of the full development.
The wastewater output from the lift station is conditioned to be restructured until a trunk
sewer is installed per the 2007 Wastewater Facilities Plan.
Pursuant to section 18.42.070.3 of the UDO, sewer and water mains shall be stubbed out to
the boundary of the subdivision to provide future service to adjoining undeveloped land.
Police/Fire. The property is located within the City’s Police and Fire emergency response
area. The subdivider must obtain addresses for the new lots from the City Engineering
Division prior to filing of the final plat to facilitate fire and police response to the site.
In November of 2006, the City Commission adopted the Bozeman Fire Protection Master
Plan. The Fire Master Plan identified current and future service delivery deficiencies and
outlined timetables for future facilities and staffing to address the growing community. The
plan does not identify any specific improvements required with this development.
Streets. Several new and existing street improvements will be required to accommodate this
development. This includes improvements of West Babcock Street, Fallon Street, Laurel
Parkway, and Cottonwood Road as analyzed in the Traffic Impact Study (TIS) completed for
this project by Engineering, Inc.
The standard code requirements apply, including the requirements for plans and
specifications, detailed design reports, and engineering services for construction inspection,
post-construction certification and preparation of mylar record drawings. No building
permits (except the lift station) will be issued prior to substantial completion and City
acceptance of required street infrastructure improvements (with the exception of sidewalks).
Stormwater. The standard requirement for a detailed review of the final grading and
drainage plan, and approval by the City Engineer, will be required as part of the
infrastructure plan and specification review process. Provisions for routing of major storm
events (100 year) either through pipe, surface flow, or a combination thereof shall be
provided for any major drainage courses that are being cut off.
Parks/Trails. Based on 322 dwelling units at 0.03 acres of parkland per dwelling unit, 9.66
acres of dedicated parkland is required with this major subdivision The dedicated park areas
proposed are the neighborhood center (1.00 acre), the wetland area (4.02 acres) and the park
area to the south and east of the wetland (2.77 acres), the neighborhood “tot lot”(.47 acres)
and the linear parkways (1.1 acres). The total parkland to be dedicated is thus 9.36 acres.
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 15457
Out of that area .45 acres must be deducted for the stormwater detention ponds located
within the 2.77 acre park area to the south and east of the wetland area. With the detention
pond area deducted 8.91 acres are provided. The applicant had requested a .75 acre credit
for workforce housing. According to staff’s calculation the applicant may only take a .47
acre credit for the 8 required workforce units (3 detached single family @ 2,700 square feet
and 5 attached single family @ 2,500 square feet). With the workforce credit applied the
applicant is providing 9.38 acres of parkland and is required to provide 9.66 acres of
parkland. Staff has added a proposed condition to the subdivision that .28 acres of
additional parkland shall be provided: onsite, offsite, or cash in lieu.
The Recreation and Parks Advisory Board reviewed the proposal on November 30, 2007
and generally recommends approval of the parks master plan. The RPAB recommends that
the applicant provide a 10’ meandering concrete shared use path along Wayward West in lieu
of the standard city boulevard and sidewalk and additional trail proposed in this location.
The Final Park and Trail Master Plan must provide an improvements schedule that outlines
those improvements to be installed by the developer, by the home owner’s association,
and/or by others, as well as the improvements schedule for completion.
Utilities. The subdivider will be responsible to extend power, cable and phone utilities to the
subdivision location. Private utilities are in the vicinity, but extensions will be needed. The
preliminary plat shows utility easements being provided along the alleyways and in the fronts
of the lots without alley access. Letters from the applicable utility companies, excluding
Qwest, were provided indicating that service can be provided to this new development.
4. Effects on the Natural Environment
As required, an approved noxious weed management and re-vegetation plan was provided
with the preliminary plat application (see Section 17 of the applicant’s submittal materials).
A Memorandum of Understanding must be entered into with the County Weed Board prior
to submittal of the final plat.
The location of the wetlands and significant vegetation are located in subdivision has already
been discussed by staff. The City Wetland Review Board has reviewed the proposed impacts
to the non-jurisdictional wetlands and is generally in favor of the proposed subdivision. The
WRB has proposed two conditions to mitigate the impacts of the development on the
wetland areas. See conditions 42-45. All roadway crossings of the Baxter Creek and Baxter
Ditch and associated wetland areas will occur only with the approval of 310 and/or 404
Permits from the Gallatin County Conservation District and the Army Corp of Engineers.
Groundwater quality will be protected by the installation of municipal sewer systems.
Finally, the applicants provided a letter from the State Historic Preservation Office regarding
cultural resources on the subject property. The letter from SHPO indicates that there is a
low likelihood that cultural properties will be impacted. The applicant also contracted with
Anthro Research to conduct a cultural resource survey of the property. The study indicated
that no evidence of cultural resources was found. Staff is recommending a condition
requiring that should historical, cultural and/or archeological materials be inadvertently
discovered during construction of this project, the State Historical Preservation Office
(SHPO) and the Bozeman Historic Preservation Office shall be contacted immediately and
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 16458
construction activities shall cease.
5. Effects on Wildlife and Wildlife Habitat
According to the preliminary wildlife assessment there are no known endangered species or
critical game ranges on site. Deer are commonly seen on the property along with small
animals, rodents and birds. Comments by the Montana Department of Fish, Wildlife and
Parks have been received and only include generic subdivision comments that relate to
impacts to the local waterways from road building, drainage within the subdivision and
sediment release due to construction disturbance. The required permitting for the roadway
crossings and for any wetland fill or sediment discharge to local waters should prevent of
mitigate any impacts to local waters.
Staff is recommending a condition that should any species of concern, as defined by the
Montana Natural Heritage Program, be discovered on-site during construction, the Montana
Department of Fish, Wildlife and Parks and the Montana Natural Heritage Program shall be
contacted immediately and construction activities shall cease.
6. Effects on Public Health and Safety
The intent of the regulations in the Title 18 of the Bozeman Municipal Code is to protect
the public health, safety and general welfare. The subdivision has been reviewed by the
Bozeman Development Review Committee (DRC) which has determined that it is in general
compliance with the title. Any other conditions deemed necessary to ensure compliance
have been noted throughout this staff report.
B. Compliance with the survey requirements provided for in Part 4 of the Montana Subdivision
and Platting Act.
The property in question has been surveyed and platted in conformance with the Montana
Subdivision and Platting Act and filed as a preliminary plat in accordance with the state statute and
the Bozeman Municipal Code.
C. Compliance with the Bozeman Unified Development Ordinance.
The following requirements are standards of the Unified Development Ordinance and shall be
addressed with the final plat submittal:
a. 18.42.030.D “Corner Lots” – The homeowner’s association documents shall provide language
stating that all corner lots shall have the same orientation as dwellings on lots on the interior of the
block. The final plat shall indicate the orientation of all corner lots.
b. 18.04.050 - Water rights, or cash-in-lieu thereof, as calculated by the City Engineer’s Office, is due
with each final plat of the major subdivision.
c. 18.42.060.B.1.a “Private Utilities” – The final plat and homeowner’s association documents shall
contain a note stating that if a utility easement is greater than the building setback required by the
Title 18 of the B.M.C. said easement shall apply.
d. 18.44.010.A. “Streets” When a proposed development adjoins undeveloped land, and access to the
undeveloped land would reasonably pass through the new development, streets within the proposed
development shall be arranged to allow suitable development of the adjoining undeveloped land.
Streets within the proposed development shall be constructed to the boundary lines of the tract to
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 17459
be developed, unless prevented by topography, or other physical conditions, in which case a
subdivision variance must be approved by the City Commission.
e. 18.44.120 “Public Transportation” – Any interior and exterior development streets that are
designated as transit routes shall be designed to accommodate transit vehicles and facilities. The
subdivider in consultation with MDT, the City of Bozeman, and Streamline Transit shall locate,
design, and construct a transit stop with seating, lighting, a bike rack, and a shelter at the
Neighborhood Center per section 18.44.120 of the Bozeman Municipal Code.
f. 18.46.020.B “Parking Within Structures” – The homeowners’ association documents shall include
the minimum provisions for one-stall and two-stall car garages as outlined by Administrative Policy
No. 2007-03.
g. 18.50.080.D “Storm Water Detention/Retention Ponds” – The park master plan shall provide a
grading and landscape plan for any storm water facilities located in dedicated parklands. Maximum
grading of said facilities and design shall be such that the facility serves as a landscape feature and
further complies with 18.48.050.L “Maximum Allowable Slope or Grade” of the U.D.O.
h. 18.50.090, executed waivers of right to protest creation of special improvement districts (SIDs) for a
park maintenance district shall be executed and submitted with the final plat to be filed with the
Gallatin County Clerk and Recorder at the time of final plat recordation.
i. 18.78.070.D requires a Final Park Plan to be approved by the City Commission, with a
recommendation from the Bozeman Recreation and Parks Advisory Board, prior to Final Plat
approval. Four bound copies of the plan shall be submitted to the Planning Office for review prior
to installation of any improvements or prior to Final Plat submission, whichever comes first. The
Park Plan shall address all of the criteria outlined in Section 18.78.060.P of the BMC.
j. Covenants, restrictions, and articles of incorporation for the creation of a homeowners’ association
shall be submitted with the final plat application for review and approval by the Planning Office and
shall contain, but not be limited to, provisions for assessment, maintenance, repair and upkeep of
common open space areas, public parkland/open space corridors, stormwater facilities, public trails,
snow removal, and other areas common to the association pursuant to Chapter 18.72 of the
Bozeman Municipal Code.
1. These documents shall include a common area and facility maintenance plan and guarantee
for the permanent care and maintenance of open spaces, recreational areas, stormwater facilities and
parking lots in accordance with Chapter 18.72 or the Bozeman Municipal Code.
2. These documents shall be submitted to the city attorney and shall not be accepted by the city
until approved as to legal form and effect. A draft of these documents must be submitted for review
and approval by the Planning Department at least 45 working days prior to filing and recordation
with the Gallatin County Clerk and Recorder.
3. These documents shall be executed and submitted with the final plat to be filed with the
Gallatin County Clerk and Recorder at the time of final plat recordation.
k. Section 18.78.070.D of the BMC requires a Final Park Plan to be approved by the City Commission,
with a recommendation from the Bozeman Recreation and Parks Advisory Board, prior to Final Plat
approval. Four bound copies of the plan shall be submitted to the Planning Office for review prior
to installation of any improvements or prior to Final Plat submission, whichever comes first. The
Park Plan shall address all of the criteria outlined in Section 18.78.060.P of the BMC.
l. Pursuant to Section 18.06.040.D.6 of the BMC, conditional approval of the Preliminary Plat shall be
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 18460
in force for not more than one calendar year for minor subdivisions, two years for single-phased
major subdivisions and three years for multi-phased major subdivisions. Prior to that expiration
date, the developer may submit a letter of request for the extension of the period to the Planning
Director for the City Commission’s consideration. The City Commission may, at the written request
of the developer, extend its approval for no more than one calendar year, except that the City
Commission may extend its approval for a period of more than one year if that approval period is
included as a specific condition of a written subdivision improvements agreement between the City
Commission and the developer, provided for in §18.74.060, BMC.
m. Per Section 18.42.050, utilities shall be placed underground, wherever technically and economically
feasible. If overhead utility lines are used, they shall be placed along the rear property line.
n. Per Section 18.42.120, if mail will not be to each individual lot within the development, the
developer shall provide an off-street area for mail delivery within the development in cooperation
with the United States Postal Service. It shall not be the responsibility of the City to maintain or
plan any mail delivery area constructed within a City right-of-way.
o. Section 18.48.070 requires the subdivider to install irrigation, sod and street trees on all external
streets and adjacent to public parks or other open spaces. A landscape plan shall be submitted,
identifying the location and tree species to be installed by the developer, prior to installation of the
trees or by final plat, whichever comes first.
p. All improvements are subject to Chapter 18.74 “Improvements and Guarantees.” If it is the
developer’s intent to file the plat prior to the completion of all required improvements, an
Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the
completion of all improvements in accordance with the preliminary plat submittal information and
conditions of approval. If the final plat is filed prior to the installation of all improvements, the
developer shall supply the City of Bozeman with an acceptable method of security equal to 150
percent of the cost of the remaining improvements.
q. The final plat must be in compliance with all requirements of Section 18.78.070 “Final Plat,”
including, but not limited to the following items:
1. Section 18.78.070.C states that a Memorandum of Understanding shall be entered into by
the Weed Control District and the subdivider for the control of county declared noxious weeds and
a copy provided to the Planning Department prior to final plat approval.
2. The final plat submittal shall include all required documents, including certification from the City
Engineer that as-built drawings for public improvements were received, a platting certificate, and all
required and corrected certificates. The final plat application shall include four (4) signed
reproducible copies on a stable base polyester film (or equivalent); two (2) digital copies on a
double-sided, high density 3½-inch floppy disk or compact disk; and five (5) paper prints.
3. Final Park Plan. For all land used to meet parkland dedication requirements, a final park plan
shall be submitted to the City of Bozeman for review and approval prior to final plat. The
installation of any park improvements to meet minimum development standards or conditions of
approval shall comply with Chapter 18.74, BMC. The final park plan shall be reviewed and
approved by the City Commission, with a recommendation from the Bozeman Recreation and Parks
Advisory Board. The final park plan shall include all of the information listed in §18.78.060.P of this
chapter.
4. Irrigation System As-Builts. The developer shall provided irrigation system as-builts, for all
irrigation installed in public rights-of-way and/or land used to meet parkland dedication
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 19461
requirements, once the irrigation system is installed. The as-builts shall include the exact locations
and type of lines, including accurate depth, water source, heads, electric valves, quick couplers,
drains and control box.
s. Stormwater Master Plan:
A Stormwater Master Plan for this phase of the subdivision for a system designed to remove solids,
silt, oils, grease and other pollutants from the runoff from the private and public streets and all lots
must be provided to and approved by the City Engineer.
The master plan must depict the maximum sized detention/retention basin location, show location
of and provide easements for adequate drainage ways within the subdivision to transport runoff to
the stormwater receiving channel. The plan shall include sufficient site grading and elevation
information (particularly for the basin sites, drainage ways and finished lot grades), typical
stormwater detention/retention basin and discharge structure details, basin sizing calculations and a
stormwater maintenance plan.
Any stormwater ponds located within a park or open space shall be designed and constructed to be
conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff
generated by the subdivision (e.g., general lot runoff, public or private streets, common open space,
parks, etc.) shall not be located in easements within privately owned lots.
While the runoff from the individual lots will be dependent on the intensity of use on each lot, the
maximum sizing of the storm retention facilities for each lot will be established based on maximum
site development. Final facility sizing may be reviewed and reduced during design review of the FSP
for each lot.
t. Plans and specifications and a detailed design report for water and sewer main extensions, streets
and storm drainage facilities, prepared by a Professional Engineer (PE) registered in the state of
Montana, shall be provided to and approved by the City Engineer. Water and sewer plans shall also
be approved by the Montana Department of Environmental Quality. The Applicant shall also
provide Professional Engineering services for Construction Inspection, Post-construction
Certification, and preparation of mylar Record Drawings.
Construction shall not be initiated on the public infrastructure improvements until the plans and
specifications have been approved and a pre-construction conference has been conducted. All plans
and specification shall comply with the current version (including all addenda) of the City of
Bozeman Design Standards and Specifications Policy and the City of Bozeman Modifications to
Montana Public Works Standard Specifications Fifth Edition that have been adopted at the time of
approval of the plans and specifications.
No building permits shall be issued prior to substantial completion and City acceptance of
the required infrastructure improvements unless all of the requirements of Section
18.74.030.D of the Unified Development Ordinance are met to allow for concurrent
construction.
u. All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets,
curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages,
and related storm drainage infrastructure improvements shall be financially guaranteed or
constructed prior to Final Plat approval.
City standard residential sidewalks shall be constructed on all public street frontages of a property
prior to occupancy of any structure on the property. Upon the third anniversary of the plat
recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 20462
shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of
whether other improvements have been made upon the lot. This condition shall be included on the
final plat for the subdivision.
v. All proposed private utilities to serve the subdivision shall be shown on the public infrastructure
plans and specifications.
w. The location of and distinction between existing and proposed sewer and water mains and all
easements shall be clearly and accurately depicted on the plans, as well as all nearby fire hydrants and
proposed fire hydrants.
x. Any easements needed for the water and sewer main extensions shall be a minimum of 30 feet in
width with the utility located in the center of the easement. In no case shall the utility be less than 10
feet from the edge of the easement. All necessary easements shall be provided prior to final plat
approval and shall be shown on the plat. Wherever water and/or sewer mains are not located under
or accessed from improved streets, a 12 foot wide all weather access drive shall be constructed
above the utilities to provide necessary access.
y. Street names must be approved by the Gallatin County GIS office and City Engineering office prior
to final plat approval.
z. The developer shall make arrangements with the City Engineer's office to provide addresses for all
individual lots in the subdivision prior to filing of the final plat.
aa. The location of mailboxes shall be coordinated with the City Engineering Department prior to their
installation.
bb. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of Environmental
Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any
required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to plan and
specification approval.
cc. If construction activities related to the project result in the disturbance of more than 1 acre of
natural ground, an erosion/sediment control plan may be required. The Montana Department of
Environmental Quality may need to be contacted by the Applicant to determine if a Stormwater
Discharge Permit is necessary. If a permit is required by the State, the Developer shall demonstrate
to the City full permit compliance.
dd. The applicant shall submit a construction route map dictating how materials and heavy equipment
will travel to and from the site in accordance with Section 18.74.020.A.1 of the Unified
Development Ordinance. This shall be submitted as part of the final site plan for site developments,
or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to
ensure that the construction traffic follows the approved routes.
ee. All construction activities shall comply with Section 18.74.020.A.2 of the Unified Development
Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent
streets. The City may require a guarantee as allowed for under this section at any time during the
construction to ensure any damages or cleaning that are required are complete. The developer shall
be responsible to reimburse the City for all costs associated with the work if it becomes necessary
for the City to correct any problems that are identified.
ff. Ditch relocation:
1. The Montana Fish, Wildlife and Parks shall be contacted by the Applicant regarding the
proposed relocation and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 21463
obtained prior to FSP approval.
2. The Applicant shall comply with all parts of section 18.42.060.D for any ditch relocation.
D. Compliance with the required subdivision review process.
The public hearings before the Planning Board and City Commission have been property noticed as
required by Title 18, BMC. The notice was mailed to all adjoining property owners by certified mail
and noticed in the Bozeman Daily Chronicle. Based on the recommendation of the DRC and other
applicable review agencies, as well as any public testimony received on the matter, the Bozeman
Planning Board shall forward a recommendation in a Resolution to the Bozeman City Commission
who will make the final decision on the applicant’s request.
E. Provision of easements for the location and installation of any planned utilities.
All utilities and necessary utility easements will be provided and depicted accordingly on the final
plat for each phase.
F. Provision of legal and physical access to each parcel.
The proposed lots will gain access from frontage on internal local streets or alleys. The final plat
shall include a public access easement for all areas labeled as “open space” and for all streets/alleys if
they are not dedicated to the public in order to comply with Section 18.44.090.B of the UDO.
PUBLIC COMMENT
No public comments have been received by the Planning Department as of the writing of this report. Any
comments received after the writing of this Staff Report will be distributed to the Commissioners at the
public hearing.
CONCLUSION/RECOMMENDATION
Pursuant to Section 18.06.040.D of the Title 18, BMC, the Planning Board shall review the preliminary plat
and supplementary information to determine if the proposed plat is in compliance or noncompliance with
the adopted Growth Policy. The Planning Board shall act to recommend approval, conditional approval or
denial of the preliminary plat application. The Board shall then provide advice and comments to the
Bozeman City Commission for its consideration at its Tuesday, January 22, 2007 hearing which begins at
6:00 PM. The Planning Board Resolution #P-07047 and minutes from the Planning Board’s meeting will be
forwarded to the City Commission and made a part of the Commission’s record.
AS AN APPLICATION FOR A MAJOR SUBDIVISION, THE PLANNING BOARD WILL
MAKE A RECOMMENDATION TO THE CITY COMMISSION. THE CITY COMMISSION
SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF
THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET
FORTH IN SECTION 18.66, BMC.
Attachments: Agency Review Comments
Applicant’s Preliminary Plat Submittal Materials
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 22464
Mailed to: Norton Properties, LLC, 63020 Lower Meadow Road Suite A, Bend, OR 97701.
Big Sky Land Consulting, PLLC, 5530 Burnt Road, Belgrade, MT 59714
#P-07047 The Norton East Ranch Major Subdivision Preliminary Plat Staff Report 23465
¯
1 inch equals 283 feet
Norton East Ranch
Subdivision CottonwoodDurston
Huffine
Bronken Park
Subject Property
Legend
Trails
Parcels
Streams
Streams
WetlandsConservationEasementsLoyalGardenBillionPUDLaurelGlenValleyWestBaxter CreekValleyWestW. Babcock St.
Fallon St.
466
467
468
Brian Krueger
From: Caren Roberty [croberty@hrdc9.org]
Sent: Monday, January 07, 2008 12:39 PM
To: Brian Krueger
Subject: FW: Norton East Ranch Subdivision Preliminary Plat Application
Page 1 of 1
1/9/2008
The Community Affordable Housing Advisory Board (CAHAB) met on December 5, 2007 to review the Norton
East Ranch Subdivision Preliminary Plat Application with Tom Henesch, engineer representing the owners of
Norton East Ranch.
There were 22 RSL/RSU’s supplied by the project in a configuration of 8 single family detached, 3 duplexes, and
2 four plexes. The property also provided 3 single family detached homes and 2 five-plexes for a total of 13
units. Since the Workforce Housing Ordinance would only require eight affordable homes the owners were
asking to bank five homes for future phases.
The CAHAB voted to recommend that the commission accept the Norton East Ranch Subdivision’s housing plan
which included the ability to bank the 5 extra units.
The CAHAB commended the developer for their efforts to ensure their subdivision was in compliance with the
housing plan.
Caren Roberty
HRDC Development Director 32 S. Tracy Ave.
Bozeman, MT 59715
croberty@hrdc9.org 406.585.4866
406.585.3538 (Fax)
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
921
922
923
924
925
926
927
928
929
930
931
933
935
937
939
941
943
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102