HomeMy WebLinkAboutBid Award for the Remodel of the Old Library into a new City Hall Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chris Kukulski, City Manager SUBJECT: Award of Bid for the Remodel of the old Library into a new City Hall MEETING DATE: February 4, 2008 RECOMMENDATION: Authorize the City Manager to sign the award of bid for the remodel of the new City Hall with Construction Manager Dick Anderson Construction in the amount of $1,711,019.00. (Please note that there are items outside the scope of the construction contract that will result in a total project cost of $2,138,726.00, explanation of these items are detailed below.) BACKGROUND: The bids were opened for the remodel on January 23 and January 25 for the 21 construction division categories. Prices were very competitive for the bidding on this project. There are some items that still need to be negotiated on the contract before the contract is formalized. The award includes the base bid and 7 alternates. The 7 alternates are: Alt. 1, the Commission Room Addition; Alt. 2, Changing out the Air Conditioner; Alt.3, Conversion of the DX coil to a 92 Chilled Water coil on the Air Conditioner; Alt. 4, Repair of the Glass Skylight; Alt. 5, Manual Window Shades; Alt. 6, New Meeting Room Dias and Case Work; Alt. 7, Change out some Windows to Operable Units. There are a number of items that are outside the scope of the contract so that we can have more direct control of the award and that will be bid separately. These items are: A project contingency of $150,000; the back-up generator at $75,000.00; The Fire Alarm System at $25,000; the Security System at $12,000; the Teledata system at $55,000; The Commission Room Audio System at $30,323; The Commission Room Video System at $24,864; the Building Commissioning Agent at $20,520, (a LEED requirement); and our match of the grant from Northwestern Energy for a solar panel array $35,000. FISCAL EFFECTS: Money for this project was originally budgeted at $2 million. Identified funding sources for this project are: General fund reserves; the Special Projects Fund, (old Valley Unit Money); and from the sale of the current City Hall building at 411 East Main. The recent appraisal for the 411 East Main property came in at $1.6 million. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, _________________________________ ____________________________ James Goehrung Chris A. Kukulski, City Manager Director of Facility Services Attachments: Award Letter from Dick Anderson Construction Report compiled on January 30, 2008 93 94 95