Loading...
HomeMy WebLinkAboutMinor Modification to the Valley West Planned Unit Report Compiled on June 1, 2005 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Krueger, Associate Planner SUBJECT: Minor Modification to the Valley West Planned Unit Development (PUD) #Z-08020 MEETING DATE: Monday, March 3, 2007 RECOMMENDATION: That the City Commission provide comments and recommend approval with the conditions recommended by staff to the Planning Director for the proposed minor modification to the Valley West Planned Unit Development. That the City Commission provide comment to the applicant on the updated Parks Master Plan. BACKGROUND: The owners of the Valley West Subdivision propose a change in layout to a portion of the PUD master plan map. The area proposed for change is in the westernmost area of the PUD, west of Bronken Park. This area is currently undeveloped. This area includes the final phases that will be developed in the Valley West Development. Wing Lake is an existing lake in this area. Valley West is currently working on a wetland mitigation project in the Baxter Springs Natural Area, including Baxter Creek, immediately west of Bronken Park as required by the US Army Corps of Engineers. The applicant is seeking a change in layout at this time due to several factors: • Wing Lake and the adjacent wetlands are in an area that is required for wetland mitigation by the US Army Corps of Engineers. The mitigation must be completed by November 2008. • The applicant has designed mitigation improvements to the Wing Lake area and through the design has determined that an east/west orientation of Wing Lake better fits the existing topography and wetland features on site. • The applicant seeks to gain approval for the new masterplan design in the area so that they may proceed with wetland mitigation in the area in order to meet the November 2008 deadline. The proposed master plan changes enable the following improvements to the masterplan: • Parkland area is increased. • The Wing Lake park area becomes contiguous to the Baxter Springs Natural Area and Bronken Park creating a larger aggregation of contiguous parkland. • The proposed design allows Laurel Parkway to be extended north and south in the future. Laurel Parkway is required to be extended through this area. • The new park design maximizes public street frontage on the park in this area. • The design increases the buffer area adjacent to Aajker Creek along the westernmost boundary of the Valley West Development. • Increased street and pedestrian connectivity. • Provides street connectivity based upon the Norton East Ranch Master Plan. 232 Report compiled on February 27, 2008 Commission Memorandum The Development Review Committee has reviewed the proposal and is supportive of the changes. Staff has recommended the following conditions of approval to the Planning Director for consideration: 1. The modified plan is subject to the original PUD conditions of approval and any subsequent modifications that have been approved to date. 2. The applicant shall submit a master relaxations list and associated map exhibit that clearly defines which relaxations apply to each phase noted in the PUD. 3. The preliminary plats submitted for all future phases of the Valley West PUD shall conform to the regulations in Title 18, BMC unless a relaxation through the PUD process has been approved. 4. A 90 foot wide Public Street and Utility easement shall be provided for the extension of Laurel Parkway from Durston Road to the south property line. 5. Wing Lake and the associated wetlands shall not encroach in the 90 foot easement for Laurel Parkway. This area of the PUD is required to complete subdivision review prior to any street construction or any lot development. The Valley West subdivision exists today as a 14 phase subdivision. To date three phases have been subdivided and are currently under development. The phases affected by the minor modification are phases 10-14. Staff’s largest concern at this time is that we assure that the area required for Laurel Parkway be reserved at this time. All other future road connections, lot layouts, lot sizes, pedestrian connections, etc. will be reviewed at the time of preliminary plat. Due to the length of time that may elapse prior the platting of these areas of the subdivision staff anticipates that additional changes may occur to the PUD master plan due to changing conditions in the market and in the City. The Recreation and Parks Advisory Board Subdivision Review Committee (RPAB) reviewed both the minor modification and proposed changes to the Parks Master Plan that was submitted concurrently with the modification application. They are supportive of the changes and recommend approval. LOCATION: The Valley West Subdivision is generally located north of West Babcock Street, south of Durston Road, and west of Ferguson Road. The property has a mix of zoning designations including R-2 (Residential Single Household Medium Density District), R-3 (Residential Medium Density District), R-MH (Single Household Mobile Home District), and B-1 (Neighborhood Service District). 233 Report Compiled on June 1, 2005 Commission Memorandum PROCESS: The Planning Director has determined that the proposed changes to the PUD master plan map are minor in nature. Section 18.36.040.4 of the Bozeman Municipal Code says that minor amendments to a PUD will be approved by the Planning Director. The code also says that the Planning Director may seek a recommendation from advisory bodies and the City Commission on the modification. The Planning Director is seeking comment and a recommendation from the City Commission at this time. The applicant has also submitted an updated Parks Master Plan for the Valley West Subdivision that incorporates the changes proposed for approval in the minor modification. The parks plan includes additional detail on the proposed parks in the area under consideration. At this time staff is seeking comment from the Commission on the Parks Master Plan. The plan will be submitted to the Commission as a consent item in the future for final approval. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new subdivision and subsequent development. ALTERNATIVES: As suggested by the City Commission. CONTACT: Please feel free to email Brian Krueger at bkrueger@bozeman.net if you have any questions prior to the meeting. APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager Attachments: Engineering Department DRC memo Planning Department DRC memo Recreation and Parks Advisory Board memo Applicant Submittal Materials for the minor modification Updated Valley West Parks Master Plan 234 235 planning • zoning • subdivision review • annexation • historic preservation • housing • grant administration • neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net MEMORANDUM To: Development Review Committee From: Brian Krueger, Associate Planner Date: February 20, 2008 Subject: Valley West Minor PUD Modification #Z-08020 Staff has found the application to allow a minor modification to the Valley West PUD, City of Bozeman, Gallatin County, Montana, with conditions, complies with the requirements of Title 18 Bozeman Municipal Code and should not be detrimental to the health, safety and welfare of the community. The recommended conditions of approval from planning staff follow. Recommended Conditions of Approval: 1. The modified plan is subject to the original PUD conditions of approval and any subsequent modifications that have been approved to date. 2. The applicant shall submit a master relaxations list and associated map exhibit that clearly defines which relaxations apply to each phase noted in the PUD. 3. The preliminary plats submitted for all future phases of the Valley West PUD shall conform to the regulations in Title 18, BMC unless a relaxation through the PUD process has been approved. 236 237   MINOR PUD MODIFICATIONS  for  VALLEY WEST    JANUARY 2008  PREPARED BY:  BOZEMAN, MONTANA  APPLICANT:  for  BOZEMAN LAKES, LLC  238 Minor PUD Amendment Narrative   January 2008  Summary This Minor PUD Amendment Application proposes updates to the Valley West Master Plan in conjunction with modifications to the Valley West Parks Plan. The proposed updates and alterations primarily affect the area west of Baxter Creek which has always been identified as a latter phase of the overall Planned Unit Development (PUD). Please note that November 21, 2008 is the deadline for the completion of the Valley West USACE (US Army Corps of Engineers) 404 Permit wetland mitigation requirements. Because these improvements are estimated to take between 6–8 months, time is of the essence. Several factors have led to the need for PUD modifications including: the evolving design development for the park system; changing land use regulations and policies; and ongoing planning and development of adjacent properties. The Design Team believes that the resulting plan is far superior to earlier concepts in terms of both park and neighborhood quality and connectivity. These modifications are explained in greater detail in the following pages. Additional reference materials as well as the original 2002 Plan, the schematic 2005 Plan and the proposed 2008 Plan are all attached for reference. Note that all lot layouts are conceptual and will be reviewed in detail with subsequent applications. 239 Land Use Patterns The proposed plan includes more parks and open space, more street connectivity, less residential developable area and the same amount of Neighborhood Commercial area. The following chart describes the differences in acreage between the 2002 and 2008 land uses patterns: 2002 Plan 2008 Plan Parks/Open Space 94 acres 105 acres Residential 137 acres 117 acres Neighborhood Commercial 8 acres 8 acres Streets 70 acres 79 acres TOTAL 309 acres 309 acres Parks & Open Space The original Valley West PUD integrated wetlands, watercourses and critical lands into an interconnected 93-acre network of open space, parks and trails. Several wetland mitigation projects have been completed to date including Meyer’s Lake, the Baxter Creek wetland complex and the restoration and enhancement of Baxter Creek, Baxter Ditch and the Maynard-Border Ditch. All environmental permits are already in place. Please refer to the detailed description of the revisions to wetland design found in the updated Parks Plan. Please note that the overall parks and open space calculations and uses were approved by the City Commission through the PUD process back in 2002. Wetlands work-in-progress for Baxter Spring Park The revised 2008 plan respects wetlands and other critical lands but also includes larger parks with more street frontage and more desirable amenities. The park area along Baxter Creek has actually increased by 11 acres and the Wing Lake park area now includes 100 percent public street frontage. The new plan also integrates a variety of park amenities including an amphitheater, plaza, playground, parking lot, basketball courts, pavilions, bathrooms, etc. These amenities are described and shown in greater detail in the Revised Valley West Parks Plan. 240 Over the past few years, the shape of Wing Lake has continued to evolve as more detailed information has been obtained. Note that the 404 Permit requires that Wing Lake and the surrounding wetland fringe encompass at least 12 acres. The 2002 plan shows the lake with a portion extending all the way to Durston Road; the 2005 plan showed a lake with a more circular shape; and the 2008 plan proposes a lake with a narrow shape and an east/west orientation. The topography is more conducive to this orientation which will also result in less extreme grade differences at opposite banks. The section of the Laurel Parkway that bisects the lake will be designed with a unique water-crossing feature as part of a future phase. Again, please note that Wing Lake and the surrounding wetland fringe must encompass at least 12 acres. 2002 Lake Conceptual Design 2005 Lake Conceptual Design 2008 Developed Lake Design Note: All lot layouts are conceptual and will be reviewed in detail with subsequent applications. Another alteration for the Valley West open space is related to Aajker Creek which flows just west of the property. During discussions for the Norton property in the Spring of 2007, the City Commission determined that the preferred buffer for the adjacent conservation easements and Aajker Creek was a 50-foot landscaped strip and a local street. Although Aajker Creek is not actually located on the Valley West property, the Design Team felt that the open space corridor should be continued north to be more of a community amenity. Aerial Photo 2006 Aajker Creek Buffer Conservation Easement Norton Valley West Laurel Glen 241 In terms of pedestrian facilities in the parks, at the time of initial PUD approval back in 2002, the Parks Plan was approved with trails in-lieu-of perimeter sidewalks. The applicant has recently met with the Engineering Division to discuss adding pedestrian ramps to provide better connectivity between the existing standard boulevard sidewalks along the streets and the existing trails in Meyers Park (see Revised Valley West Parks Plan). Also note that future parks will have perimeter sidewalks or sidewalk/trail combination facilities as required. All future parks and open space in Valley West will meet or exceed the high standards and unique character that has already been established for the existing parks which won a City of Bozeman Beautification Award in November of 2007. Again, additional parks information can be found in the Revised Valley West Parks Plan which is being reviewed concurrently with this proposal. Photos from the Existing Valley West Parks Road & Pedestrian Connectivity More street and pedestrian connectivity serves to better incorporate adjoining neighborhoods while also decreasing overall block lengths. The revised 2008 plan shows increased road connectivity for the area west of Baxter Creek. The 2002 plan depicts three road connections to the north (now Laurel Glen), one road connection to the south (now part of the Norton project) and no connections to the west. The 2005 plan included additional connectivity with the same three connections to the north and the addition of a second connection to the south; however, still no road connections were planned to the west. The proposed 2008 plan shows even more connectivity with the same three north connections, four connections to the south, and one potential future connection to the west. The 2008 plan also includes an additional interior east/west street just south of Durston Road. Please refer to the attached plans. The other road modification is on the westernmost portion of the property. This road is shown shifted to the east to match development plans to the south and to allow for an open space buffer along the creek. No private lots or backyards will encroach into the creek setback. This road must transition from the existing road in Laurel Glen to the north and to the future planned road in the Norton project to the south. 242 In terms of pedestrian facilities in the parks, at the time of initial PUD approval back in 2002, the Parks Plan was approved with trails in-lieu-of perimeter sidewalks. The applicant has recently met with the Engineering Division to discuss adding pedestrian ramps to provide better connectivity between the existing standard boulevard sidewalks along the streets and the existing trails in Meyers Park (see Revised Valley West Parks Plan). Also note that future parks will have perimeter sidewalks or sidewalk/trail combination facilities as required. All future parks and open space in Valley West will meet or exceed the high standards and unique character that has already been established for the existing parks which won a City of Bozeman Beautification Award in November of 2007. Again, additional parks information can be found in the Revised Valley West Parks Plan which is being reviewed concurrently with this proposal. Photos from the Existing Valley West Parks Road & Pedestrian Connectivity More street and pedestrian connectivity serves to better incorporate adjoining neighborhoods while also decreasing overall block lengths. The revised 2008 plan shows increased road connectivity for the area west of Baxter Creek. The 2002 plan depicts three road connections to the north (now Laurel Glen), one road connection to the south (now part of the Norton project) and no connections to the west. The 2005 plan included additional connectivity with the same three connections to the north and the addition of a second connection to the south; however, still no road connections were planned to the west. The proposed 2008 plan shows even more connectivity with the same three north connections, four connections to the south, and one potential future connection to the west. The 2008 plan also includes an additional interior east/west street just south of Durston Road. Please refer to the attached plans. The other road modification is on the westernmost portion of the property. This road is shown shifted to the east to match development plans to the south and to allow for an open space buffer along the creek. No private lots or backyards will encroach into the creek setback. This road must transition from the existing road in Laurel Glen to the north and to the future planned road in the Norton project to the south. 243 Additional pedestrian connectivity is also included in the 2008 Plan. Due to access restrictions along Durston Road (a major arterial), Ashley Avenue cannot continue north; however, a 60-foot pedestrian greenway is provided for pedestrians and bicyclists. Also, to break up the block between Ashley Avenue and Laurel Parkway, another 60-foot greenway is proposed. This greenway can directly connect Wing Lake to the planned wetland complex and trails in the Norton project. Conclusion Since 2002, the overall design of Valley West has continued to develop and adjust to ongoing parks and wetlands design development, changing land use regulations and policies, and developing adjoining properties. As proposed, these amendments enhance the established parks and open space program and include more street and pedestrian connectivity which will result in a better overall neighborhood. Laurel Glen   Open Space   & Trails  Planned trails   & wetlands in  Norton  Open Space Corridor  along Durston Road  244 Original Valley West PUD Master Plan 2002Valley West PUD Schematic Plan 2005Valley West Modified Master Plan 2008*Note that all lot layouts are conceptual and will be reviewed in detail with subsequent applications.245 Aerial Photograph 1 May 2007 246 Aerial Photograph 2 May 2007 247 Conservation EasementsHuffineHuffineLaneLaneNorthwest Quadrant Planning ExhibitNorton Project Conceptual Layout (not formally approved)NTSLaurel ParkwayLaurel ParkwayWestgate AveWestgate AveW. Babcock StreetW. Babcock StreetDurstonDurstonRoadRoadBillion PropertyNeighborhood Commercial NodeThe Ridge PUDAajker CreekBaxter Creek BPSpring Creek VillageBronze Leaf CondosHeritage Christian SchoolBaxter CreekMaynard-Border Ditch248 Conservation EasementsHuffineHuffineLaneLaneNorthwest Quadrant Planning ExhibitNorton Project Conceptual Layout (not formally approved)NTSLaurel ParkwayLaurel ParkwayWestgate AveWestgate AveW. Babcock StreetW. Babcock StreetDurstonDurstonRoadRoadBillion PropertyNeighborhood Commercial NodeThe Ridge PUDAajker CreekBaxter Creek BPSpring Creek VillageBronze Leaf CondosHeritage Christian SchoolBaxter CreekMaynard-Border Ditch249 SCHEMATIC MASTER PLANJanuary 2008 draftNOTE: CONCEPTUAL LAYOUT SUBJECT TO CHANGE WITH DEVELOPMENTWESTWINGLAKEBAXTER CREE K WESTGATE AVENUEDURSTON ROADLAUREL PARKWAYWING DRIVENEIGHBORHOOD SERVICES3.8 ACRESBAXTER SPRINGS NATURAL AREAWESTMORLAND DRIVECASCADE STREETPERRY STREETWATERS STREETCOTTONWOOD ROADBRONKEN FIELDSVAUGHN DRIVETHEODORE STREETNEIGHBORHOOD SERVICESALEXANDER STREETNEIGHBORHOOD SERVICESBRISBIN STREETBEMBRICK STREETCLIFDEN DRIVE PERRY STREETENEBOE AVENUESTAFFORD AVENUEWATERS STREETALEXANDER STREETCASCADE STREETPRIVATE SCHOOL CAMPUSMEYERSLAKEBENEPE STREETTOOLE STREETTILTON STREETFORBES STREETBRENDEN STREETKIMBALL AVENUECLIFDEN DRIVE MONROE STREETKIMBALL AVENUECASCADE STREETCOVER STREETFERGUSON ROADMEYERSPARKHANLEY STREETWEST BABCOCK STREETBRENDEN AVENUEexisting phasesfuture phasesexisting phasesfuture phasesEASTWINGLAKEASHLEY AVENUE250 251 252 253 254 LANDSCAPE ARCHITECTURE/PLANNING/ENVIRONMENTAL DESIGN January 30, 2008 Brian Krueger City of Bozeman 20 E. Olive Street PO Box 1230 Bozeman, Montana 59771 RE: Valley West Parks Master Plan Update Dear Brian: The design team for Valley West is submitting a minor PUD amendment and park master plan update to the adopted park master plan for Valley West (2006). The purpose for the update is to fulfill the wetland mitigation requirements set forth by the United States Army Corps of Engineers (USACE). The 404 permit requires that the mitigation sites be completed by November 2008. Because any construction within park lands must comply with the park master plan, we feel that this update is necessary to accurately depict the changes necessary to fulfill our permit requirements. A full explanation of the 404 permit requirements is included in the appendix of the park master plan under “Critical Lands.” The park master plan shows the proposed mitigation area as “Wing Lake Park.” The upcoming wetland construction prompted the project team to develop the design for the wetlands and parks in greater detail to ensure that they blend seamlessly with the park plan. The program elements for the park are nearly the same. However, they have been reconfigured to provide a vastly improved design that includes 100 percent street frontage and better connectivity. The land around the park has been master planned and approved as a part of a PUD. None of that land has been submitted for preliminary plat. At this time, the applicant is completing only the construction tasks necessary to fulfill the wetland mitigation requirements. This includes the rough grading, water control structures, wetland sod placement, seeding, and containerized plant installation. As the perimeter lands are platted, detailed park construction drawings for playgrounds, irrigation systems, picnic shelters, etc. will be submitted to the City with each platted phase. A cost estimate has been prepared that shows the improvements and responsible party for each corresponding phase (see Appendix 8). The park master plan binder contains an updated project narrative outlining the important aspects of the parks system at Valley West. The narrative is very similar to the currently adopted plan; however, the section regarding Wing Lake Park has been updated to reflect the recent design development. Other modifications include the latest version of the City of Bozeman Parks Department’s design guidelines and a brief description of the park elements implemented since the last submittal. 255 Also included in the appendix are all of the construction drawings of improvements installed to date. Full-sized construction drawings have been submitted to the Park’s Department for approval with each project. The half-sized sheets have been included with this submittal for reference. The park land improvements at Valley West are a source of pride not only for the applicant and design team, but for the neighborhood and community as well. The developments implemented at Meyer’s Lake are used and appreciated by a variety of residents from the entire Bozeman community. The high standard met by Valley West’s existing parks will be replicated through the final phases, including the Wing Lake Park development. On behalf of the applicant and the project team, we would welcome the opportunity to discuss with you and the reviewing entities our goals for this project and to answer any questions. We look forward to hearing from you soon. Best regards, Jolene Rieck, ASLA Landscape Architect 256 TABLE OF CONTENTS PROJECT LOCATION AND HISTORY...........................................................................1 PROPOSED USES..............................................................................................................1 PHASED AND FLEXIBLE................................................................................................1 CONTEXT AND PLACE...................................................................................................2 SPECIFIC PARK AREAS..................................................................................................2 Meyers Park............................................................................................................2 Bronken Fields .......................................................................................................4 Baxter Springs Natural Area ..................................................................................4 Wing Lake Park......................................................................................................4 Greenways and Open Spaces .................................................................................7 ENVIRONMENTAL SUSTAINABILITY.........................................................................7 SPECIFIC SITE AMMENITIES – CITY OF BOZEMAN DESIGN GUIDELINES........7 Irrigation Systems...................................................................................................7 Playgrounds............................................................................................................8 Gravel Trails...........................................................................................................8 Bridge Crossings....................................................................................................9 Restroom Construction...........................................................................................9 Soil Preparation....................................................................................................10 Acceptable Soils...................................................................................................10 Hillside Grades.....................................................................................................10 Seeding.................................................................................................................11 Site Furniture and Amenities................................................................................11 PARKS MAINTENANCE PLAN ....................................................................................11 IMPLEMENTATION.......................................................................................................14 APPENDIX SITE PLAN FOR ENTIRE SUBDIVISION.......................................................................1 DRAINAGE AREAS..........................................................................................................2 UTILITIES PLAN...............................................................................................................3 ZONING & OWNERSHIP FOR ADJACENT PROPERTIES ..........................................4 CRITICAL LANDS............................................................................................................5 GEOLOGY, SOILS & SLOPES.........................................................................................6 PHASING PLAN................................................................................................................7 COST ESTIMATES FOR REMAINING IMPROVEMENTS...........................................8 PHASE 1 PARK CONSTRUCTION DRAWINGS ...........................................................9 PHASE 2 PARK CONSTRUCTION DRAWINGS .........................................................10 PHASE 3 PARK CONSTRUCTION DRAWINGS .........................................................11 PHASE 4/5 PARK CONSTRUCTION DRAWINGS ......................................................12 WING LAKE WETLAND MITIGATION CONSTRUCTION DRAWINGS.................13 OVERALL MASTER PLAN (EAST OF COTTONWOOD ROAD)..............................14 OVERALL MASTER PLAN (WEST OF COTTONWOOD ROAD) .............................15 257 2 ACKNOWLEDGEMENTS Applicant: The Aspen Group For: Bozeman Lakes, L.L.C. 25A Clifden Drive Bozeman, Montana 59715 Planning/Architect: Intrinsik Architecture 111 North Tracy Avenue Bozeman, Montana 59715 Landscape Architect: Peaks to Plains Design, P.C. 404 North 31st Street, Suite 405 Billings, Montana 59101 Ph. (406) 294-9499 Civil Engineer: Morrison-Maierle, Inc. 901 Technology Blvd. Bozeman, Montana 59771 Wetlands & Wetland Permitting: Environmental Design: Vaughn Environmental Confluence Consulting Inc. 8353 Saddle Mountain Rd. 1115 N. 7th Avenue Bozeman, Montana 59715 Bozeman, Montana 59715 258 1 VALLEY WEST SUBDIVISION PLANNED UNIT DEVELOPMENT Park System Master Plan Project Location and History Valley West is located south of Durston Road, west of Ferguson Road, north of West Babcock Street and is divided by Cottonwood Road in Bozeman. Valley West is a residential planned unit development (PUD) under multiple phases for construction. The initial park master plan was submitted with the overall PUD approval process and was updated in 2006. The initial master plan indicated that 94 acres of park and open space would be allocated, placed appropriately along drainage and existing creek corridors and to take advantage of the centralized placement within the development. Historically, the property consisted of agricultural lands for crops and pasture. In the far northwest corner of the PUD, a gravel pit exists, which has filled with the ground water. Ground water is very high in this area allowing for shallow water wetlands, open ponds and diverse habitats. The property is on the far west end of Bozeman, so surrounding uses are agricultural lands, a private school and private residential development. Proposed Uses The Park Master Plan for Valley West will continue to guide the landscape design, park use and maintenance. Landscape and park amenities are implemented in phases as the building lots and related infrastructure is developed. The plan describes an overall landscape concept that implemented in phases, will yield a cohesive development. Recommendations include: • Tree lined streets with consistently spaced street trees with variety in species between neighborhoods • Similar treatments of public spaces throughout the development including greenways and parks. Landscaping will include natural areas, developed parks and transitional spaces. • Consistency between overall site/paving details through out the development and details within a neighborhood. Phased and Flexible The phased improvement plan allows for logical implementation strategies that balance up front developer costs with phased improvements. Implementation strategies include construction of some landscape and park improvements by the developer concurrent with subdivision infrastructure, as adopting design guidelines and regulations requiring a certain level of landscaping as well as leaving opportunities for new residents to suggest enhancements such as play areas or sports courts. • CCR’s require owners to plant lawn and street trees in the boulevards. The type and spacing of trees will be recommended on the master plan, typically 50 feet on center on residential streets. 259 2 • CCR’s require fencing or hedges along greenways and alleys to be a maximum of 4-1/2’ in height and constructed to architectural standards. Detailed construction documents outlining specific improvement items have been and will continue to be submitted with each phase of construction. These plans have been reviewed by the Park’s Department prior to the start of park land construction. In addition, record drawings for each phase will continue to be submitted to the parks department after the current phase of park construction, but prior to the start of the next phase of park construction. Context and Place The landscape is designed to be sensitive to the place and context and consistent with new urbanism tenets. ƒ The Park and open space designs blend the informality of the ditches, drainages and natural environment with the formality of dense urban development. Informal clusters of native plants have been dispersed along the greenways and in the parks. Species within the parks and greenways will be natives or adapted natives. ƒ The existing and proposed wetlands are integrated into the overall design by varying the dimension and defining a natural edge along the minimum 100’ corridor by “contour mowing”. This will be similar to the fairway and rough edges of a golf course. ƒ Three levels of landscaping are recommended: Native, Transitional, and Traditional The landscape design creates a recognizable pattern in the landscape that orients visitors and provides clues to “way finding” ƒ Consistent and traditional planting of shade trees along arterials. ƒ Dominant planting of a theme street tree species within each neighborhood/phase. ƒ Use of Canada Red Chokecherry where pathways intersects the alleys and streets. ƒ Clusters of Aspens at focal points such as development entry or pedestrian intersection in the greenway. ƒ Consistent development of the greenways along the project perimeter. Specific Park Areas The plan shows a hierarchy of parks and open spaces to serve community and the neighborhood’s active and passive recreational needs. There are over 90 acres of park and open lands throughout the Valley West Subdivision. ƒ Meyers Park Meyers Park includes a five acre lake (Meyers Lake) that has a wetland fringe and fisheries component. A future boardwalk out the deepest area of the lake will allow for easy access for 260 3 fishing. This area provides opportunities for walking, fishing and observation and includes a full range of landscape treatments from natural areas to manicured park areas. Extensive planning and construction activities were a central focus of completing the design for a 5-acre lake. The lake has a wetland fringe around the edges. These edges received wetland sod that was harvested from nearby wetlands to provide an adequate seed source and erosion control. The shape of the lake has undulating edges to increase shore line area, but to also provide visual interest and opportunities for wildlife enhancement. A small pond was constructed on the east side of the lake and is fed by groundwater. The lake has one water control inlet and one water outlet discharging to the Maynard-Border Ditch. Meyer’s Lake was stocked in 2007 with one of Montana’s remaining native fish species, Westslope Cutthroat Trout. This public amenity has been well- received. On the east side of the Maynard-Border Ditch, a more formal park area has been developed. This area contains a sand volleyball court with benches for spectators. In addition, a future large park shelter will be available for picnics, neighborhood parties and general public use. The shelter is located in close proximity to on-street parking and will have many trash receptacles in close vicinity. An open space to the south of the shelter will allow for family games and other staging events. Meyers Park extends south of Cascade Street in an area that was completed in phase 1 and phase 2 of the PUD developments. The entire Maynard-Border Ditch corridor was enhanced extensively by planting clusters of native woody species. These wetland species are supplemented with a drip irrigation system. Other items in this park area include gravel trails, benches, bollard lighting and open space. A small playground area was installed in 2003 that contains a buck-a-bout, a slide and a swing set. In 2005, the playground was expanded with a larger, multi-functional playground structure, approved by the City Parks Department. On the west landform extending into Meyers Lake, four structures form central pavilions that are arranged in quadrants around a central seating area. The layout of pavilions allows for flexible use by small or large groups and maintains a connection with the adjacent lake access area. The architecture and 261 4 materials are consistent with other structures in the parks that accentuate the landscape and reference historical structures of the area. ƒ Bronken Fields This is an active recreational complex, dedicated to soccer. The surface is covered with turf grass that has full irrigation. The master plan shows connections from this park area to the lake with a series of trails and boardwalks. The fields are owned and operated by the City of Bozeman. Valley West provided the land for the complex. A paved parking lot was installed in 2007. A bathroom building with concession space and maintenance equipment storage area is within this complex. The soccer fields will serve as the primary active use area for the Valley West PUD as well as surrounding developments. ƒ Baxter Springs Natural Area The Baxter Springs Natural Area consists of a wetland complex created adjacent to the Baxter Creek floodplain. The wetlands complex encompasses a mosaic of shallow open water areas that provides valuable waterfowl habitat. Native woody species were planted in clusters to simulate natural conditions and to enhance the structural diversity of the complex. Pedestrian- load boardwalks were used to transverse the sensitive wetland areas. The trail system will connect the Baxter Creek complex to the remainder of the subdivision. The trails have been designed to allow for a minimum amount of human traffic through the wetlands to further enhance the wildlife habitat. As such, motorized vehicles are not allowed through the complex. ƒ Wing Lake Park Wing Lake Park will be the premier destination for neighborhood and community residents alike. The existing water body will be enlarged as gravel is extracted for use in building roads for the subdivision. Upon reclamation of the pit, the lake perimeter will be designed for active and passive recreational uses. The Lake will consist of two lobes, with the east lobe (called Wing Lake East) that encompasses more open, natural spaces that maximize wildlife use, while allowing minimal human disturbance. With fewer programmed uses, this area will provide a transition from the Baxter Springs Natural Area to Wing Lake Park’s active use areas. Natural area amenities will consist of gravel trails and boardwalks. The west lobe (called Wing Lake West) has an active recreation component with enhanced park amenities, programmed use areas and more formal park lawns. 262 5 Vegetation around Wing Lake East will consist of native trees, shrubs and grasses. A wetland fringe will be created around the entire perimeter of the east lobe providing vegetation cover and insect habitat required for the resident fish population. Due to the overwhelming popularity of the fishing at Meyer’s Lake, the applicant is working with the Montana Fish, Wildlife and Parks (MT FWP) to address the co-management of the fishery in Wing Lake. Large, flat stones will be installed at the water’s edge in several locations to provide fishing access and to improve safety and prevent erosion of the shoreline. The lake design has incorporated a natural and varied shoreline with a low transition angle and will have a maximum depth of 20-25 feet. This was a requirement of the 2006 park master plan approval. An Ambient Water Rule passed in July 2003 adopted federal standards for bathing that apply to public lakes. The Ambient Water Rule is referenced in the US Federal Register-40 CFR, Part 136, Volume 68, Number 139. The Ambient Water Rule recommends testing for Escherichia coli (E. coli) and Enterococci. A baseline will be established by sampling Wing Lake for the recommended microbiological parameters three times during the anticipated period of use from June to October. The lake will be sampled once during the summer in subsequent years. The active recreational uses are located primarily along the north shores of the Lake. This concentration of uses in a common area allows for better management strategies, including safety, related activities and combined infrastructure. According to the recent PROST plan, the community has indicated a need for basketball courts. This recreational amenity has been added to the Wing Lake East area and includes the space for two full-sized basketball courts. When constructed, they will have an asphalt pavement and four hoops. The courts are immediately adjacent to each other in order to provide for maximum flexibility if several half-court games are desired. The remaining north shore edge will consist of unprogrammed open space consisting of lawns and irrigation. Berming surrounds the courts to allow for spectator observation as well as backless benches between the trail and courts on the west side. This unprogrammed area will serve as a transition space from the nearby lots to the natural edges created by the east lobe of Wing Lake. The hub of activity at Wing Lake occurs along the north shore of Wing Lake West. Several components allow for multiple activities in a concentrated area. Due to the number of activities, the main pedestrian walkways will be sidewalks, in lieu of gravel trails. The remaining pathways will be constructed to the City of Bozeman gravel trail standards. A 24-stall off-street paved parking lot will be built off of Westmorland Drive. This parking lot 263 6 will have two two-way ingress and egress points for ease of vehicular circulation. The remaining park perimeter has over 100 parallel on-street parking spaces to accommodate use. A sign in a landscaped bed will greet users to Wing Lake Park. Next to the entry, a large “plaza” area will be available for gatherings. This grassy area, 50 feet by 50 feet will accommodate 25 tables for up to 200 people. The space will provide an opportunity for wedding receptions, birthday parties or other activities within the park. The orientation and design will still allow for other users to utilize the park if the plaza is occupied. Two picnic shelters will be placed nearby the parking lot, both taking advantage of the views across the lake and access to the other site amenities. One of the shelters will have attached a restroom facility with City water and sewer services. This facility is faced towards the street for safety and security. A tot-lot (ages 2-5) and school-age playground (ages 5-12) is sited to the west of the restroom/shelter. Its orientation allows for additional security and separation from the water’s edge. Playground equipment will comply with the City of Bozeman Design Guidelines. Berms will be placed around the playground for spectator viewing. A hopscotch board will be imprinted into the surrounding concrete for an added play value. A play structure has not been selected, but will be submitted for approval by the City. A large amphitheater that will seat over 200 people will be built along the water’s edge. The spectators will overlook Wing Lake. The stage is an open stage, but the surrounding space will allow for a temporary band shell. The purpose of this feature is to provide daytime opportunities for outdoor concerts, impromptu gatherings and serve as an educational area regarding the lake. A dock will provide fishing access for this area of the Lake. It is designed to allow for four tables with seating as well as a fishing platform that conforms to ADA guidelines. Additional water access is provided to the west of the amphitheater. This gradual grade with a safety shelf is free of woody species for water access. Through the wetland construction, several fishing access points, constructed of natural materials, are incorporated into the shoreline. The remaining areas along Westmorland Drive allow for unprogrammed open space with lawns and irrigation. A flat, open space is purposefully placed to the east of the plaza and is surrounded by berms for recreational use. 264 7 ƒ Greenways and Open Spaces The initial phases of the parks and open spaces include landscaped greenways and natural parks. The improvements already implemented provide pedestrian connections to the City’s trail system as well as connections between streets throughout neighborhood. The greenway provides a variety of passive and active recreational uses and built in opportunity for additions by future residences. Environmental Sustainability The landscape concept is environmentally responsible, sustainable and well integrated with infrastructure. ƒ Plantings in drainage swales will be informal and placed to take advantage of supplemental moisture. ƒ A hierarchy of landscaping is proposed requiring various levels of maintenance and water. - Natural wetland areas are enhanced with streamside and waters edge plantings. The native grass cover in existing wetlands will remain undisturbed. Areas disturbed by construction will be reseeded. Grass in these areas will receive not supplemental irrigation. Woody plants were temporarily irrigated to aid in establishment. Maintenance requirements will be minimal once the grass is established. - Transitional areas will be seeded with a broad-spectrum seed mix of native and adapted sod forming species. These areas will receive supplemental water from an automatic, spray irrigation system. These areas occur along park edges. The level of refinement will be determined by maintenance practices. More frequent mowing and watering will yield a more refined appearing landscape. Maintenance will consist of some watering and periodic mowing. The trees in these areas will be drip irrigated, as the amount of water the transitional grass areas will receive will be less than required to establish healthy trees. - Traditional Landscape Areas will be seeded with turf grasses (or sodded). These areas will be automatically irrigated using spray irrigation. The appearance will be traditionally suburban in style. Maintenance will consist of regularly mowing and watering. Visually, these area will relate to the expected style of landscaping of properties through out the development Specific Site Amenities – City of Bozeman Design Guidelines (Updated 02/01/07) Irrigation Systems Irrigation systems will be compatible with Maxicom systems. [Please note that approval was given by the Parks Department to utilize Hunter Controllers at Valley West]. All irrigation lines shall be schedule 40 PVC. Pipe shall be installed at a minimum depth of twelve inches, main lines at eighteen inch minimum depth, with 4 inches of sand shall be 265 8 placed beneath pipe and four inches of sand above the pipe to prevent compaction and settling. No stacking of irrigation lines shall be permitted. Sprinkler heads will be installed on manufactured swing joints (Schedule 80 with o-rings). Heads to be installed must be approved by the Parks Division and shall be gear driven, with interchangeable nozzle sizes, unless noted otherwise, and shall be capable of producing the specified GPM and coverage area and shall be set to the manufacturers’ specifications. Electrical locate tape shall be installed along all lines. Upon completion of installation, all warranty and maintenance information, as well as well logs and pump warranties and information, if applicable, and an “as-built” drawing will be supplied to the City of Bozeman Parks Division. The water sources for these parks are wells that are located throughout the subdivision. The wells have been drilled to an average of 60 feet in depth. The maximum output of water is 35 gallons per minute as allotted by the State of Montana DNRC for water rights. Additional water rights were pursued; however, the time and expense associated with attempting to gain these rights outweighed the costs for additional wells. Playgrounds Playgrounds must be installed on property owned by the City of Bozeman. All playgrounds must be approved by a Certified Playground Safety Inspector (CPSI) and meet ASTM F1487- 01, CPSC and ADA guidelines and specifications. Playgrounds shall be age appropriate, for area served, and be signed accordingly. There must be an adequate use zone area around equipment, approved material in use zone, which meets impact attenuation criteria as specified in ASTM 1292, and adequate drainage. All installation plans, materials list, construction guidelines, maintenance information and manufacturer’s name must be supplied to the City of Bozeman’s Parks Division, upon completion of playground installation. All work will be overseen and approved by a CPSI. No wooden structures will be approved. Gravel Trails All gravel trails located within the subdivision will be constructed to meet the City of Bozeman trail standards. Class II trails shall be a minimum of 72 inches in width. The trail bed must be excavated six inches deep, prior to installation of tread mix. Tread mix shall be installed in two parts. The first 3 inch lift shall be of ¾ inch road mix, compacted. The second 3 inch lift shall be 3/8 inch minus gravel (natural fines). Natural fines used for these trails shall consist of 80 percent sand, 10 percent silt and 10 percent clay. If the material falls outside of these parameters, the City of Bozeman Parks Division must be consulted for approval or modification. If the natural fines tread mix does not contain enough clay or silt binder, additional binder must be mixed in. Alternative soil stabilizer products are acceptable, but must be approved by the City of Bozeman Parks Division. 266 9 The trail bed must be filled up to original surface along both edges with a cross slope of no less than 2 percent and no more than 5 percent to provide for water drainage. Tread mix must be rolled flat and compacted after installation, maintaining said cross slope. Where terrain allows, slope of trail shall not exceed 12:1 with a gross slope no greater than 20:1 (5%) to provide for ADA accessibility. All damage to surrounding features and/or vegetation shall be reclaimed immediately. Encroaching weeds, due to trail construction, shall be treated and controlled for a minimum of 2 years after the trail section is completed. Minimum overhead clearance shall be 96 inches for pedestrian and bike traffic and 120 inches for equestrian traffic. Bridge Crossings Bridges shall have a minimum width of 96 inches to allow for wheelchair turn around and passing. Height of bridge is measured from the bridge deck to the bottom of the stream or river. If the deck is more than 30 inches high, a protective rail is required. Rails are to be 42 inches high, with at least one mid- rail at 34 inches, to also be used as a handrail. A protective barrier must be installed along the length of the rail system with either solid paneling or vertical bars. Spacing between the bars shall be no greater than 3.5 inches or less than 9 inches. All bridges to be installed on public lands must be certified by an engineer and must have a building permit. If the bridge does not require a rail, it must have a 3 inch high curb on both sides, along the entire length of bridge. The deck should be constructed of slip- resistant material. Deck of bridge shall not exceed a 12:1 slope along any part of its length. The deck and ends of bridge must have no abrupt change in surface level great than ½ inch and a cross slope not exceeding 2 percent. Bridges must be rated for a minimum load of 12,500 pounds and display a permanent label indicating the load limit, year it was built and the manufacturer. Restroom Construction The restroom buildings, plumbing, electrical and general construction must meet or exceed all City, County, State and Federal building codes. Restrooms must meet or exceed all ADA and ADAAG guidelines. A building permit must be secured for construction. The restroom building exterior and interior walls must be of CMU construction. All exterior walls must be insulated. The building will have a metal roof and rain gutters with down spouts. Security lights will be installed on two sides of the building. The building will consist of a women’s and men’s restroom with each one having fluorescent lighting and ventilation fan activated by a motion sensor switch. Each restroom will consist of three (3) stalls. The women’s will have three toilets and the men’s will have two toilets and one urinal. Each restroom will have one sink, one soap dispense and one hand dries and/or one towel dispenser. Any windows will be of glass blocks. The 267 10 building will have a utility room between the men’s and women’s restrooms measuring no less than four feet wide and run the length of the restrooms. All plumbing and water lines will be within the utility room and easily accessible. The water meter will be located in the utility room. The building’s water lines will be copper. The size of the main feed line to the building will be determined by the City of Bozeman. The floors in each restroom will have either a single four inch floor drain or a trench drain. The utility room will also have a floor drain. The floor will slope to the drain with no low or flat areas that hold water. All of the restroom’s toilets, sinks, and urinals must be stainless steel. Each toilet and urinal will have a motion sensor flush valve. The building will have a heating system large enough to keep each restroom and utility room from freezing during winter months. Locate the heating unit in the utility room. Drinking fountains, showers and other amenities will be at the discretion of the City of Bozeman. Soil Preparation All soils to be used on public park land shall be inspected by and meet the approval of City of Bozeman Parks Division Staff prior to installation and shall meet the minimum depth requirement of 10 inches. All rock in excess of 1 inch in diameter shall be removed. Soil tests (a sieve analysis and soil analysis) shall be performed prior to planting to determine the classification and texture of the soils, along with any nutrient deficiencies. The classification and texture will determine what amendments, if any, are needed, while the soil analysis will help correct any nutrient problems with a pre-plant fertilization. Acceptable Soils The soil will be deemed acceptable if it is less than 35 percent clay and less than 70 percent sand and 70 percent silt. The pH must not exceed 8.4. The soil will be screened at 1 inch minus for rocks and debris; topsoil depth will be at least ten inches. The sub base, after grading, will be scarified to a depth of twelve inches to insure drainage throughout the profile. Amendments may vary depending on existing soils, but will generally consist of 60 percent coarse sand (generally concrete sand), 20 percent organics (C: N ratio below 30) and 20 percent approved native soil. Soils will be mixed, prior to installation, with a screener / mixer machine, or applied in layers on site and mixed thoroughly with a deep rototiller. Depth of amended soil will be a minimum of ten inches. There will be no compaction following the grading process. Fertilizer, and the rate at which it will be applied, should be dictated by the soil test report. Hillside Grades Hillside grades within park landscapes shall be 7:1 when achievable and no steeper than 5:1, to allow for maintenance equipment access and to minimize soil runoff. Appropriate measures such as hydroseeding, erosion control matting or other approved measures shall be taken to stabilize and allow for the specified revegetation of all disturbed parkland areas, regardless of slope. 268 11 Seeding Seeding ratios and mixes will be approved by the City of Bozeman Parks Division. Seeding will be applied with a slit-type or drill-type seeder to insure good soil to seed contact. Before seeding, the soil shall be loosened to a minimum depth of six inches in order to improve initial root development. The soil will not be compacted in any manner. Sufficient compaction is readily achieved through the grading process and normal rainfall. Fertilizer should be applied prior to planting to insure healthy plant development. Generally, a seed mix combination of Bluegrasses and Rye are used in formally maintained Parks. Some low maintenance Kentucky bluegrasses that perform well are: Kenblue, Park, Plush, Vantage, Victa, Vanessa, Barblue, Parade and S-21. Perennial ryegrass will be used opposed to annual ryegrass. Athletic fields will be planted with new-improved Kentucky bluegrass types and new cultivars of perennial rye. Examples of some of the new, aggressive types of Kentucky Blue Grasses are as follows: Award, Total Eclipse, Midnight, Nustar, Ram I, Limousine and Touchdown. Lower maintenance parkland may require different seed mixes, and will be specified by the Parks Division. [Note that native upland seeding and wetland seeding have different requirements and their mixes and application methods are approved on a project by project basis.] Site Furnishings & Amenities Valley West has furnishings that is unique to its identity and composition. Site furnishings in the parks are benches, picnic tables, lighted bollards, trash receptacles and bike racks. All site furnishings installed have received the approval of the Bozeman Parks Department. Light bollards, which provide low level down lighting, are located along walkways which wind through the parks. The bollards function as way finding points. Their unique design and natural materials compliment the aesthetics of other structures within the parks. In a similar manner, park benches are positioned along trails. The too provide subtle down lighting while inviting users to pause and enjoy the park lands. Their placement provides a variety of viewing options including the creeks, park amenities and walkways. Covered bridges placed throughout several creek crossings provide for sheltered gathering places and landmarks within the landscape. The architecture references historical agricultural structures found in the region as well as traditional covered bridge structures. Natural wood and rusted steel are the primary building materials. This natural color palette blends well with the landscape of the parks. Bridges have a widened section in the middle which provides users the opportunity to pause and stand or sit on either side while maintaining a clear walkway for other users. Parks Maintenance Plan The park system within Valley West is diverse and requires different subsets of maintenance considerations within this area. Because over 90 acres of this area is dedicated for parkland, the master plan allows for certain areas to remain in a natural state versus a manicured park for ease of maintenance and to maintain species diversity. 269 12 The Valley West Homeowner’s Association is responsible for maintaining the parks and open spaces at Valley West. The maintenance responsibilities are outlined in their current adopted covenants as well as this narrative. Depending on seasonal moisture, native grasses will be mowed 3 times per year; the first time at the end of May, the second time in mid-July, and the final time occurring in mid- October. The mow height will be a minimum of 4 inches, with 6 inches being preferable. A noxious weed control program has been established with a local contractor. A yearly property check with spot spraying as required occurs in the month of June. This event is coordinated with the County Weed Supervisor, the NRCS agent and the City of Bozeman. This program can also be used to control the weeds in gravel parking areas and walkways with spot application of a weed control agent as required. The City of Bozeman shall be notified of any and all applications of pesticides and/or herbicides on public lands. Signs shall be posted prior to application in appropriate and noticeable locations identifying the product applied and the date to be applied. Signs will remain in place for a minimum of two (2) days after treatment. Records shall be maintained in accordance with State of Montana Pesticide Act, Administrative Rule 4.10.207 and copies submitted to the City of Bozeman Parks Division. Turf grass areas will have a mow height of no less than 3 inches and be allowed to grow to 4 or 4-1/2 inches before being mowed again. Bluegrass lawn areas require roughly 12 inches of water between June 1st and September 1st. At peak demand this means roughly 1 inch of precipitation per week in lawn areas. For mature lawn areas, this water will be spread evenly through the week and in less frequent, deeper soakings. Fertilizing of grass and lawn areas is to be done as necessary, but not be overdone to minimize water needs and mowing and to protect sensitive areas. Lawns which have irrigation at head to head coverage will have two applications of fertilizer: The first will be a blend of 17-17-17 in May and then will have an application of 27-8-8 in mid summer. As the lawns are establishing, the rate of fertilization will be approximately 40 lbs per 10,000 square feet. An established lawn will be fertilized at a rate of 60 lbs. per 10,000 square feet. Areas which are “partially irrigated” or have only a single row of heads may be fertilized in a similar way, except the mid-summer application of 27-8-8 will be less, due to less water get the nitrogen to the grass roots. Bi-annual soil test will be taken to assess soil nutrient contents and adjust fertilizer rates accordingly. Any seed mix that has no irrigation or areas within 50 feet of a stream or wetland or within the mitigation wetlands will not be fertilized at any time. This will minimize excess nutrient run-off that will adversely affect the water ecosystem. Trees and shrubs located within this corridor will be monitored and if deemed that they need fertilization, the use of capsule fertilizer will be utilized. 270 13 In areas outside the corridor, the shade trees will be fertilized in April with 16-10-9 plus iron and zinc. Once trees and shrubs are established, they will be fertilized with tree food spikes. Do not fertilize trees and shrubs past mid-July. Pruning of evergreens will occur in June. Shade trees will be pruned in April, except maples and birch. Maple and Birch species will be pruned in mid to late July. All tree trimming and pruning must be performed by a certified arborist as outlined in City Ordinance 12.30.040 in coordination with the Forestry Division. General monitoring for pests and diseases will be done throughout the year. Trees and shrubs will be deep watered right before the ground freezes. All trees on public property are subject to City of Bozeman permits and ordinances as outlined in City Ordinance 12.30.040. Concrete sidewalks located in the public right-of-way will have the snow removed within 24 hours of the end of any snowfall event as per Bozeman Ordinance 1529. The responsible party will be the subdivision’s home owner’s association. Gravel trails will not have a regular snow removal schedule. Certain park areas have ground cover which requires full or partial irrigation. In areas where a full turf-type lawn is desired, an irrigation system will be placed with head to head coverage. In borders next to areas desired to be left in a native grass state, a single row of heads is placed to allow for minimal watering to allow for that transition. The irrigation systems are fed by wells drilled on site. The irrigation system will need to be monitored to watch for breaks, vandalism and overall needs of the site. The irrigation system will be charged in April, after the frost has left the ground and plant material begins to grow. All of the manual drain valves will be turned to the closed position. The power for the well pump will be switched to the “on” position. Program or adjust the controller for the current month’s watering needs. Check all heads to ensure that there is no breakage and that proper coverage is attained. Each month the heads and controller will be checked and adjusted for the weather. When repairing the sprinkler heads using different brands or nozzles are not recommended. This ensures that the coverage is efficient for the working pressure and disperses at an equal precipitation rate. Ensure that the heads seated at a level which it is not damaged from mowing or maintenance equipment. Be sure to periodically check the drip emitters around the trees to ensure they are functioning properly. Winterization of the irrigation system typically occurs during the last week of October. At this time, the power to the well pump will be turned off. All manual drain valves will be opened. Use a high-powered air pump to connect to many of the quick coupler valves around the system. Run air through the system, opening and closing each valve zone, until all of the water is completely out of the system. Turn off the controller and leave the water off until spring. If winter watering is necessary, this must be done manually from a tank to avoid damage to the system. 271 14 Areas with higher use such as picnic structures and tables will have weekly garbage service. Implementation All park and open space areas will comply with the City of Bozeman requirements for implementation. Each preliminary plat phase will provide detailed landscape and irrigation plans in accordance with the overall master plan for any park land in that particular phase. Site grading, seeding, well development and irrigation infrastructure will be installed as required for subdivision regulations. Before construction commences, a pre-construction meeting is held and the City Parks Department is invited to attend. The developer has installed over $1 Million dollars of improvements to date. Boulevard trees are required in the CCR’s of the PUD and the developer has installed them in all phases of the development and will continue to do so. As the plats are submitted, boulevard trees are identified and approved by the City Forester. Additional amenities not required of the developer, but will be included in park improvements, include playground equipment, surfacing and drainage; benches, picnic tables; picnic shelters, plazas, amphitheaters and other additional amenities to enhance the development of the PUD. The quality of the installed improvements will far exceed the minimum requirements set forth for the development. 272 SCHEMATIC MASTER PLANJanuary 2008 draftNOTE: CONCEPTUAL LAYOUT SUBJECT TO CHANGE WITH DEVELOPMENTWESTWINGLAKEBAXTER CREE K WESTGATE AVENUEDURSTON ROADLAUREL PARKWAYWING DRIVENEIGHBORHOOD SERVICES3.8 ACRESBAXTER SPRINGS NATURAL AREAWESTMORLAND DRIVECASCADE STREETPERRY STREETWATERS STREETCOTTONWOOD ROADBRONKEN FIELDSVAUGHN DRIVETHEODORE STREETNEIGHBORHOOD SERVICESALEXANDER STREETNEIGHBORHOOD SERVICESBRISBIN STREETBEMBRICK STREETCLIFDEN DRIVE PERRY STREETENEBOE AVENUESTAFFORD AVENUEWATERS STREETALEXANDER STREETCASCADE STREETPRIVATE SCHOOL CAMPUSMEYERSLAKEBENEPE STREETTOOLE STREETTILTON STREETFORBES STREETBRENDEN STREETKIMBALL AVENUECLIFDEN DRIVE MONROE STREETKIMBALL AVENUECASCADE STREETCOVER STREETFERGUSON ROADMEYERSPARKHANLEY STREETWEST BABCOCK STREETBRENDEN AVENUEexisting phasesfuture phasesexisting phasesfuture phasesEASTWINGLAKEASHLEY AVENUE273 SCHEMATIC MASTER PLANJanuary 2008 draftNOTE: CONCEPTUAL LAYOUT SUBJECT TO CHANGE WITH DEVELOPMENTWESTWINGLAKEBAXTER CREE K WESTGATE AVENUEDURSTON ROADLAUREL PARKWAYWING DRIVENEIGHBORHOOD SERVICES3.8 ACRESBAXTER SPRINGS NATURAL AREAWESTMORLAND DRIVECASCADE STREETPERRY STREETWATERS STREETCOTTONWOOD ROADBRONKEN FIELDSVAUGHN DRIVETHEODORE STREETNEIGHBORHOOD SERVICESALEXANDER STREETNEIGHBORHOOD SERVICESBRISBIN STREETBEMBRICK STREETCLIFDEN DRIVE PERRY STREETENEBOE AVENUESTAFFORD AVENUEWATERS STREETALEXANDER STREETCASCADE STREETPRIVATE SCHOOL CAMPUSMEYERSLAKEBENEPE STREETTOOLE STREETTILTON STREETFORBES STREETBRENDEN STREETKIMBALL AVENUECLIFDEN DRIVE MONROE STREETKIMBALL AVENUECASCADE STREETCOVER STREETFERGUSON ROADMEYERSPARKHANLEY STREETWEST BABCOCK STREETBRENDEN AVENUEexisting phasesfuture phasesexisting phasesfuture phasesEASTWINGLAKEASHLEY AVENUE274 275 Utilities Affected Utilities All affected publicly and privately owned utilities have been notified and provided copies of the Concept Planned Unit Development Plan for the Valley West Subdivision. These include: ƒ Northwestern Energy (gas and electric) ƒ Qwest Communications ƒ Bresnan Communications Electric/Gas Northwestern Energy will provide natural gas and electric service to the development. These facilities will be located in alleys and utility easements for individual service drops and junction boxes will be provided on the rear of each lot. Electric and natural gas lines servicing residents will be placed underground. Cable Television Bresnan Communications will provide cable service to the development. Telephone Service Qwest Communications will provide local telephone service to the development. All utilities serving the development will be installed underground within alleys and utility easements provided on the plat for each individual phase of the development. Facilities will be installed concurrent with the phased development of the project. 276 277 278 279 280 281 282 283 284 285 MINOR PUD AMENDMENT REVISIONS TO WETLAND DESIGN The USACE approved Corps File No. 1998-90-014, Amendment No. 1, for the Valley West Master Plan on November 21, 2001. The primary design changes reduced the mitigation requirement to 47.9 acres and changed the location of the wetland complex from the west side of Baxter Creek to the east side. The second and third amendments approved on June 13, 2006, allowed for the relocation of an unnamed tributary of Baxter Creek located on the east side of Ferguson Road and the south side of Durston Road, which increased the mitigation requirement by 1.6 acres to 49.5 acres. The tributary was relocated for the widening of Durston Road. Compensatory mitigation outlined in the subsequent amendments to the original 404 permit required the creation of a 5-acre lake, a 12-acre lake, a 13-acre wetland complex, and a 1.0-acre spring. Permit conditions also required the restoration and/or enhancement of 17.7 acres of Baxter Creek, Baxter Ditch, and Maynard-Border Ditch. Mitigation projects completed to date include the construction of Meyer’s Lake and the Baxter Creek wetland complex and the restoration/enhancement of 16.1 acres of Baxter Creek, Baxter Ditch, and the Maynard-Border Ditch. The areal extent of Meyer’s Lake was restricted to four acres as result of the location and grade of Cascade Street, the trails, and side slopes creating a mitigation shortfall of one acre. The extent of the wetland complex was also restricted to 9.75 acres by the elevation of the trails and corresponding width of the fill slopes required in wetland areas. The total shortfall in mitigation acreage to date is approximately 5.85 acres. The US Army Corps of Engineers is requiring that the shortfall be addressed by constructing the additional mitigation wetlands onsite. The 404 permit requires that Wing Lake and the surrounding wetland fringe encompass at least 12 acres, which the current plan illustrates. The area west of the existing Baxter Creek floodplain and the area between the 1-acre spring and east lobe of Wing Lake will be expanded to provide additional mitigation wetlands. The initial master plan delineated these areas as park space and unprogrammed open space. The mitigation wetlands will primarily exhibit saturated soil conditions with groundwater fluctuating from 12 inches below the ground surface to the ground surface. The mitigation areas will still be accessible to foot traffic during the summer and fall. The east lobe of Wing Lake, the Baxter Creek wetland complex, and the Baxter Creek floodplain wetlands will provide approximately 25 acres of a contiguous wetland system. The size and continuity of a wetland system directly increases the functional value of general wildlife habitat, flood attenuation, sediment/nutrient/toxicant retention and removal, production export/food chain support, and recreation/education potential. The development and revegetation of the wetlands with native grass, grass-like (sedges), and woody species will notably increase the structural diversity of the site resulting in a corresponding increase in the functional value of the waterfowl and bird habitat. Structural diversity and evenness of the vegetated classes relate to the amount of niches available in an area (MDT Montana Wetland Assessment Method 1999). More potential niches become available as more habitat layers occur. The number of wildlife species increases with a corresponding increase in structurally complex habitats (Cooperrider et al. 1986). 286 287 288 289 290 PRELIMINARY COST ESTIMATEProject:Wing Lake ParkPhase: Master PlanDate:January 30, 2008Prepared By: Peaks to Plains Design, PCITEM DESCRIPTION QTYUNIT UNIT COST TOTALPHASE RESPONSIBILITYGravel Trails6' Wide5644 LF 2.50$ 14,110$ 10,12a,13 DeveloperBoardwalk8' Wide, Pedestrian Load425 LF 220.00$ 93,500$ Future By OthersSidewalks6' Width, Internal Sidewalks5701 SF 4.50$ 25,653$ 10,11,12a,12b,13,14 DeveloperAmphitheater 1 LS 46,765.00$ 46,765$ 11,12b,14 DeveloperParking Lot 1 LS 40,083.82$ 40,084$ 10,12a,13 DeveloperPicnic Shelter30'x30'1 EA 173,000.00$ 173,000$ 11,12b,14 DeveloperPicnic Shelter with Restroom30'x30', plus 15'x30'1 EA 263,000.00$ 263,000$ 10,12a,13 DeveloperPicnic Tables 10 EA 1,300.00$ 13,000$ 10,12a,13 DeveloperBasketball Courts2 High School Size Courts1 LS 23,466.59$ 23,467$ Future By OthersPlayground2-5 and 5-12 Age1 LS 83,484.11$ 83,484$ 10,12a,13 DeveloperPlaza Tablesround & square tables for plaza/pier29 EA 1,900.00$ 55,100$ 10,12a,13 DeveloperLakeside Dockdecking, footers & railing1 LS 25,000.00$ 25,000$ 10,12a,13 DeveloperSite Furniturebenches, trash, bollards, bike, etc.1 LS 101,200.00$ 101,200$ 10,11,12a,12b,13,14 DeveloperPark SignWing Lake Park1 LS 7,500.00$ 7,500$ 10,12a,13 DeveloperBoulevard Trees1-1/2" Caliper81 EA 200.00$ 16,200$ 10,11,12a,12b,13,14 DeveloperBoulevard Ornamental Trees1-1/2" Caliper5 EA 175.00$ 875$ 10,11,12a,12b,13,14 DeveloperNon-wetland plant stocknon-boulevard1 LS 19,820.00$ 19,820$ 10,11,12a,12b,13,14 DeveloperWetland MitigationUnder separate contract1 LS 1,636,028.00$ 1,636,028$ Mitigation - 2008 DeveloperSeed Mix #1Turf Lawn Mix180,194 SF 0.04$ 7,208$ 10,11,12a,12b,13,14 DeveloperSeed Mix #2Upland Native Mix23 AC 1,800.00$ 40,500$ 10,11,12a,12b,13,14 DeveloperIrrigation SystemsIncludes 35 GPM Wells1 LS 130,759.10$ 130,759$ 10,11,12a,12b,13,14 DeveloperBridges Intrinsik Custom2 EA 55,000.00$ 110,000$ 10,12a,13 DeveloperSUBTOTAL2,926,253$ MOBILIZATION & INSURANCE 10% 292,625$ CONTINGENCY 15% 482,832$ TOTALThis estimate was prepared utilizing 2008 dollars with no inflation increase.3,701,710$ C:\Documents and Settings\Jolene Rieck\My Documents\Valley West Parks\Database\Cost Estimate-Wing Lake MP_013008.xlsSummary291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 Meyers Park / Initial Phases Open Spaces Sidewalk and Trail Connectivity Analysis January 2008 South Meyers Park - Pink Circles (2). The trail curves nicely toward the intersection. Add two ramps each side to correspond with the adjacent sidewalks with short trail spurs. - Yellow Circle. This is an important connection to the bridge, so a single ramp here is logical, even though is does not connect to a street intersection. Many folks park on Clifden Drive and access the playground equipment from this trail spur. - Green Circle. Again, this is an important east west connection, aligning with the bridge and the Cover Street intersection. Unfortunately, the trail dips away from the intersection. Add two ramps and a horse shoe fines trail this location. - Red Circle. It appears that we have two ramps here already as well as trail connection to both. No changes needs here. - White Circles. Add two ramps and trail connections at these street intersections. The trail is close so the trail stubs should be minimal. NOTE: grades in this area will need to be verified as they may preclude typical ramp installation. North Meyers Park - Orange Circle. It appears we have two ramps here already. Connect the trail with stubs to ramps. - Blue Circle. There will be sidewalks here when houses are built. Add ramps in R.O.W. to connect to the intersection. - Purple Circles (2). Change natural fines trail from Brenden Street to Durston to a 5’ concrete sidewalk. Add ramps on both side of Forbes, and connect sidewalk along open space to Tilton and Toole streets. Note: verification needed for street tree locations, sprinkler heads, grade, etc on site. Please see attached (3) images for reference. 307 Meyers Park . May 2007 308 South Meyers Park 309 North Meyers Park 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 MEYERS LAKE (5 ACRES) FISHING DOCK PICNIC SHELTER SAND VOLLEY- BALL UNPROGRAMMED OPEN SPACE PLAYGROUND AREA MAYNARD-BORDER DITCH338 5-12 yr. old playground 2-5 yr. old playground Am p h itheater (200)Restroom Picnic Shelter Picnic Shelter Grass Plaza Unprogrammed Open Space (Irrigated Lawn) Fishing Dock Native Meadows 24 Stall Parking Lot Wetland Fringe Basketball Courts Unprogrammed Open Space Bronken Fields Native Meadows Native Meadows 339 WING LAKE PARK Perspective looking south to north at the corner of Westmorland Drive and Laurel Parkway. January 2008 340 341