HomeMy WebLinkAbout2008 Sewer Rehabilitation Project
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Chris Kukulski, City Manager
SUBJECT: 2008 Sewer Rehab Project
MEETING DATE: 4/21/08
RECOMMENDATION: Authorize City Manager to sign.
BACKGROUND: Attached is a copy of the partially executed Agreement with Great West
Engineering, Inc. for Professional Engineering Services for above referenced project.
This project is for the replacement of approximately 1400 lineal feet of main on Lincoln utilizing pipe
bursting. The size of the existing main will be increased from 8” to 15” in accordance with the
Wastewater facility plan. Additionally, approximately 16,000 lineal feet of main of various sizes on the
east side of town will be rehabilitated using the Cured In Place Pipe (CIPP) method. The improvements
will serve to both increase the capacity of the system in places and address rehabilitate old infrastructure.
Attached to the contract is a detailed scope and budget which provides an itemized breakdown of the
tasks to be completed with the project. The document is in the City’s standard format. The proposed fee
of $93,480 for design and bidding services appears to be commensurate with the project complexity. An
amendment will be processed for construction services after the design phase is complete.
FISCAL EFFECTS: Currently budgeted in the wastewater fund.
ALTERNATIVES: As suggested by the City Commission.
Respectfully submitted,
_________________________________ ____________________________
Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager
Attachments: Professional Services Agreement
Report compiled on 4/14/2008