HomeMy WebLinkAbout09 29 08_Award bid to DYK Incorporated and Notice of Award for the 2008 Sourdough Reservoir Rehabilitation Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: Sourdough Reservoir Rehabilitation Project MEETING DATE: 9/29/08 RECOMMENDATION: Approve and authorize City Manager to sign the Notice of Award. BACKGROUND: Attached is a copy, of the Notice of Award and the Engineers award recommendation for the above referenced project. This project is to complete structural rehabilitation to the top of the reservoir to correct deterioration that has occurred over the years. Bids for the above-referenced project were opened on September 9, 2008 with 2 bids being submitted. The low bid was submitted by DYK Incorporated in the amount of $142,000.00. The Bid Tabulation for the project is attached. The project is currently funded in the water fund in the current fiscal year. FISCAL EFFECTS: To be paid from the Water Fund ALTERNATIVES: Disapprove Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Notice of Award Bid Tab and Award Recommendation Report compiled on 9/22/08 176 Notice of Award – Page 1 of 1 C:\Backup\Lyman Creek 2007\2 notice_award_c-510.doc 9/22/08 Notice of Award Dated Project: Sourdough Water Tank Rehabilitation - 2008 Owner: City of Bozeman, MT Owner's Contract No.: N/A Contract: Sourdough Water Tank Rehabilitation - 2008 Engineer's Project No.: 0417.055.x750.0310 Bidder: DYK Incorporated Bidder's Address: (send Certified Mail, Return Receipt Requested) 351 Cypress Lane, El Cajon, CA 92022 You are notified that your Bid dated September 9, 2008 for the above Contract has been considered. You are the Successful Bidder and are awarded a Contract for the Sourdough Water Tank Rehabilitation – 2008 project. (Indicate total Work, alternates or sections or Work awarded.) The Contract Price of your Contract is One Hundred and Forty-Two Thousand & No/100 Dollars ($142,000.00). Five (5) copies of each of the proposed Contract Documents (including Drawings) accompany this Notice of Award. You must comply with the following conditions precedent within fifteen days of the date you receive this Notice of Award. 1. Deliver to the Owner five (5) fully executed counterparts of the Contract Documents. 2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the Instructions to Bidders (Article 20), [and] General Conditions (Paragraph 2.01 and 5.01) [and Supplementary Conditions (Paragraph SC-2.01).] 3. Other conditions precedent: a) The Notice to Proceed must be issued and a Preconstruction Conference must be held with the Owner and Engineer prior to your commencement of the work. b) Submittals for the Prestressed System components and the Finite Element Analysis must be approved prior to your commencement of the work. Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award and declare your Bid security forfeited. Within fifteen days after you comply with the above conditions, Owner will return to you two fully executed counterparts of the Contract Documents. Chris Kukulski, City Manager (Owner) By: (Authorized Signature) Copy to Engineer 177 178 179 180