Loading...
HomeMy WebLinkAbout09 29 08_Approve Resolution No. 4130, Change Order 4 and Work Change Directive for Durston Road 7th to 19th Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: Durston Road 7th to 19th Project MEETING DATE: 10/6/2008 RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign the change order. BACKGROUND: Attached is a copy, of change order number 4 for the above referenced project. The change order is to correct a drainage problem which was created by the project on one of the properties along the corridor. More specifically, it is to install a drainage swale to drain water which has been ponding in the driveway as a result of the construction. The change order increases the contract price by $700.00 and the contract time by 0 days. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. FISCAL EFFECTS: None ALTERNATIVES: Disapprove Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Change Order 4 & Resolution 4130 Report compiled on 9/16/08 165 COMMISSION RESOLUTION NO. 4130 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH JTL GROUP, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 31st day of May 2006, authorize award of the bid for the Durston Road 7th to 19th project, to JTL Group, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained in Change Order No. 4, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 29th day of September 2008. __________________________________________ KAAREN JACOBSON Mayor 166 ATTEST: ________________________________________ STACY ULMEN City Clerk APPROVED AS TO FORM: _____________________________________ TIM COOPER Assistant City Attorney 167 168 169 170 171