Loading...
HomeMy WebLinkAbout10 06 08_Babcock Meadows Lot 70 Minor Subdivision Preliminary Plat Commission Memorandum TO: Honorable Mayor and City Commission FROM: Allyson C. Bristor, Associate Planner SUBJECT: Lot 70 Babcock Meadows Minor Subdivision Preliminary Plat #P-08010 MEETING DATE: Monday, October 6, 2008 RECOMMENDATION: That the City Commission conditionally approves the Lot 70 Babcock Meadows Minor Subdivision Preliminary Plat application (#P-08010), based on the Planning Board’s recommendation of conditional approval, with the conditions listed on Page 2 of Planning Board Resolution #P-08010. BACKGROUND: Property owners Mountain High Homes, LLC, c/o Dan Barnes, and City of Bozeman c/o Debbie Arkell, and representative C&H Engineering and Surveying, Inc, submitted a Subdivision Preliminary Plat Application #P-08010, a Second or Subsequent Minor Subdivision from a Tract of Record to divide 0.96 acres into two residential lots. The subject property is generally located at 3104 West Babcock Street on land described as Lot 70, Babcock Meadows Subdivision, Phase 2A, SW ¼ Sec. 11, Township 2S, Range 5E, of PMM, City of Bozeman, Gallatin County, Montana. At their September 16, 2008 public hearing, the City of Bozeman Planning Board voted eight in favor and zero against to forward a recommendation of conditional approval to the City Commission, subject to three conditions. UNRESOLVED ISSUES: The Department of Planning is not aware of any unresolved issues for the subdivision at this time. FISCAL EFFECTS: The Department of Planning is not aware of any fiscal effects for the subdivision at this time. ALTERNATIVES: As suggested by the City Commission. CONTACT: Please email Allyson Bristor at abristor@bozeman.net if you have any questions prior to the public hearing. APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager 434 PLANNING BOARD AND CITY COMMISSION STAFF REPORT LOT 70 BABCOCK MEADOWS MINOR SUBDIVISION FILE #P-08010 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 1 Item: Subdivision Preliminary Plat Application #P-08010, a Second or Subsequent Minor Subdivision from a Tract of Record to divide approximately 0.96 acres (41,656 square feet) into two residential lots. The subject property is generally located at the southwest corner of the West Babcock Avenue and Donna Way intersection, and is legally described as Lot 70, Babcock Meadows Subdivision, Phase 2A, City of Bozeman, Gallatin County, Montana, and is zoned as R-3 (Residential Medium Density District). Property Owners/ Applicants: Mountain High Homes, LLC c/o Dan Barnes 2285 Virginia City Ct. Bozeman, MT 59715 City of Bozeman c/o Debbie Arkell PO Box 1230 Bozeman, MT 59771 Representative: C & H Engineering and Surveying, Inc. 1091 Stoneridge Drive Bozeman, MT 59718 Date/Time: Before the Bozeman Planning Board on Tuesday, September 16, 2008 at 7:00 p.m. in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, Montana. Before the Bozeman City Commission on Monday, October 6, 2008 at 6:00 p.m. in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, Montana. Report By: Allyson C. Bristor, Associate Planner Recommendation: Conditional Approval ____________________________________________________________________________________ PROJECT LOCATION The property is generally located at the southwest corner of the intersection of West Babcock Avenue and Donna Way, and is legally described as Lot 70, Babcock Meadows Subdivision, Phase 2A, City of Bozeman, Gallatin County, Montana. Please refer to the vicinity map provided on the following page. 435 PROPOSAL Property owners and applicants Mountain High Homes LLC and the City Bozeman, represented by C & H Engineering and Surveying, Inc., made application for a Second or Subsequent Minor Subdivision from a Tract of Record to subdivide one residential lot into two residential lots. The northern half of the subject property is currently occupied by a single-household residence with the address 3104 West Babcock Avenue. The southern half of the subject property is currently under construction with a condominium development, planned to include two buildings with four dwelling units in each building (addresses to be determined at a later date). As indicated by representative, this subdivision would create two lots that can permit residential development on the property, as permitted in R-3 (Residential Medium Density District). ZONING DESIGNATION & LAND USES The subject property is zoned R-3 (Residential Medium Density District). The intent of the R-3 district is to provide for the development of one- to five-household residential structures near service facilities within the City. It should provide for a variety of housing types to serve the varied needs of households of different size, age and character, while reducing the adverse effect of nonresidential uses. The following land uses and zoning are adjacent to the subject property: North: Residentially developed, zoned R-2 (Residential Two-Household, Medium Density District). South: Residentially developed, zoned R-2. East: Residentially developed, zoned R-3. West: Residentially developed, zoned R-2. Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 2436 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 3 ADOPTED GROWTH POLICY DESIGNATION The development proposal is in general conformance with the Bozeman 2020 Community Plan including the “Residential” land use designation. This category designates places where the primary activity is urban density living quarters. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. The dwelling unit density expected within this classification varies. Medium density areas should have an average minimum density of twelve units per net acre. A variety of housing types should be blended to achieve the desired density with large areas of single type housing being discouraged. All residential housing should be arranged with consideration given to the existing character of adjacent development, any natural constraints such as steep slopes, and in a fashion which advances the overall goals of the Bozeman 2020 Community Plan. All property adjacent to the subject property is designated residential. PRELIMINARY PLAT SUPPLEMENTS The representative requested waivers from all materials required by Section 18.78.060, “Additional Subdivision Preliminary Plat Supplements,” of the Unified Development Ordinance with the pre- application review. The Development Review Committee (DRC) granted the requested waivers at the first week of the preliminary plat application review. STAFF FINDINGS & REVIEW CRITERIA The basis for the City Commission’s decision to approve, conditionally approve or deny the subdivision shall be whether the preliminary plat, Planning Board advise and recommendation, and additional information demonstrates that development of the subdivision complies with the Unified Development Ordinance, the City’s growth policy, the Montana Subdivision and Platting Act and other adopted state and local ordinances. The Montana Subdivision and Platting Act established six primary review criteria, which the governing body must also consider when evaluating subdivisions. Planning staff, the DRC, and other reviewing agencies have made comments in relation to those and other criteria as described below, and have recommended conditions as outlined in this staff report. A. Primary Review Criteria 1. Effects on Agriculture The area was platted and subdivided several years ago with the Babcock Meadows subdivision, and does not support agricultural uses. 2. Effects on Agricultural Water User Facilities No effects on agricultural water user facilities are identified. 3. Effects on Local Services Water/Sewer. As conditioned by Engineering Staff, new water and sewer services must be provided to the south lot. The services shall be installed or financially guaranteed prior to final plat approval. Though the condominium development includes new water and sewer services, the condition is still required by Engineering. 437 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 4 Police/Fire. The property is well within the City’s Police and Fire emergency response area. Streets. When the southern, triangular portion of open space owned by the City of Bozeman is included in the south lot property perimeters, Planning Staff finds the proposed south lot to have legal and physical access on Donna Way and the proposed north lot to have legal and physical access on West Babcock Avenue. Stormwater. Stormwater facilities are included in the northern portion of the open space area along Donna Way. They were still found as adequate in size with the proposed reduction of area. All future changes to stormwater facilities on site will be required to meet City design standards and will require the approval of the City Engineering office. Parks. Parkland dedication was handled with the original Babcock Meadows subdivision application. Utilities. There are existing power, cable and phone utilities on the subject property and proposed utilities for the condominium development. Necessary easements were provided during the site plan review process of the condominiums. 4. Effects on the Natural Environment The existing weed plan, as approved through the original subdivision, is found to be acceptable. 5. Effects on Wildlife and Wildlife Habitat There is no adverse impact on wildlife and wildlife habitat. The subject property has been developed for some time. 6. Effects on Public Health and Safety The intent of the regulations in the Unified Development Ordinance is to protect the public health, safety and general welfare. The subdivision has been reviewed and determined to be in general compliance with the title. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. B. Compliance with the survey requirements provided for in Part 4 of the Montana Subdivision and Platting Act. The property in question has been surveyed and platted in conformance with the Montana Subdivision and Platting Act and filed as a preliminary plat in accordance with the state statute and the Bozeman Municipal Code. C. Compliance with the Bozeman Unified Development Ordinance. The following requirements are standards of the Unified Development Ordinance and shall be addressed with the final plat submittal: 438 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 5 • The final plat shall include utility easements in compliance with Section 18.42.060.B. • Pursuant to Section 18.42.120, an off-street location for mail delivery will need to be provided. • Pursuant to Section 18.48.070.A.2, the developer shall be responsible at the time of initial development for installing vegetative ground cover, boulevard trees and an irrigation system in the public right-of-way boulevard strips along all external perimeter development streets and adjacent to public parks or other open space areas. Municipal water shall be used for irrigation if a well permit cannot be obtained for irrigation. • Pursuant to Section 18.48.070.B, a developer shall be responsible for irrigating and maintaining landscaping along external streets and landscaping adjacent to parks or other opens space areas until 50 percent of the lots are sold. Thereafter, the property owners association shall be responsible for maintaining and irrigating these landscaped areas. The property owners association may with the City’s approval establish an improvement district to collect assessments to pay for the irrigation and maintenance. • Pursuant to Section 18.50.090, executed waivers of right to protest the creation of special improvement districts (SIDs) for a park maintenance district will be required to be filed and of record with the Gallatin County Clerk and Recorder. • A final copy of the covenants, restrictions, and articles of incorporation shall be submitted with the final plat application for review and approval by the Planning Department and shall contain, but not be limited to, provisions for assessment, maintenance, repair and upkeep of common open space areas, public parkland/open space corridors, stormwater facilities, public trails and pathways, snow removal, and other areas common to the association pursuant to Chapter 18.72 of the Bozeman Unified Development Ordinance. • The final plat shall conform to all requirements of the Bozeman Unified Development Ordinance and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and correct certificates. The final plat application shall include four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high density 3-1/2" floppy disk; and five (5) paper prints. • Pursuant to Section 18.06.040.D.6, conditional approval of the preliminary plat shall be in force for not more than one calendar year. Prior to that expiration date, the developer may submit a letter of request for the extension of the period to the Planning Director for the City Commission’s consideration. The City Commission may, at the written request of the developer, extend its approval for no more than one calendar year, except that the City Commission may extend its approval for a period of more than one year if that approval period is included as a specific condition of a written subdivision improvements agreement between the City Commission and the developer, provided for in §18.74.060, BMC. • Pursuant to Section 18.74.030.B, if it is the developer’s intent to file the final plat prior to installation, certification, and acceptance of all required improvements by the City of Bozeman, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the Preliminary Plat submittal information and conditions of approval. If the final plat is filed prior to the 439 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 6 installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. • Pursuant to Section 18.06.060, the applicant shall submit with the application for final plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval has been satisfactorily addressed, and specifically (tab, page, paragraph, etc.) where this information can be found. • Pursuant to Section 18.78.050, the applicant shall submit a revised property title that reflects all property affected by the minor subdivision. D. Compliance with the required subdivision review process. A subdivision preapplication was submitted on February 13, 2008. The pre-application was reviewed by the Development Review Committee (DRC) on April 16, 23, and 30, 2008. During the DRC review, it was found that the proposal is creating a “flag” lot, which doesn’t provide public street frontage, and is unsupportable. Staff made the suggestion to apply for a boundary re-alignment Subdivision Exemption, which would provide public street frontage along Donna Way by taking a small portion of the existing open space at the southeast corner of the lot. A preliminary plat application was completely received on August 22, 2008. The preliminary plat was different than the pre-application submittal because it included a 26-foot wide strip of property in the southern portion of the open space area owned by the City of Bozeman. The representative made the argument that said strip of land met the legal requirement of frontage, but Planning Staff disagreed. The preliminary plat application was found as unacceptable for initial review. The reasons for this determination are listed below: 1. The City of Bozeman is an affected property owner with this preliminary plat application. No City signature was received or included with the application submittal. 2. The proposal fails to meet Section 18.42.030.a of the Unified Development Ordinance, because it creates a lot design with an irregular and flag shape. Lot designs with irregular shapes, narrow necks, points and flag shapes shall be permitted only when the developer can demonstrate that the proposed lot designs are necessary due to topography or other physical constraints. 3. A variance request is required to allow a driveway access to be located within a required side yard setback, as stated in Section 18.44.090.E.2 of the Unified Development Ordinance. After further discussions with the property owner and representative, as well as the City’s Director of Public Services, Debbie Arkell, Planning Staff determined that if the entire southern, triangular portion of the open space was included in the proposed south lot, adequate frontage and access on Donna Way is supplied to the lot. The preliminary plat application materials were revised and submitted to show such an arrangement, and deemed complete and acceptable for initial review by Planning Staff on September 3, 2008. The preliminary plat was reviewed by the DRC on September 3 and 10, 2008. On the final week of DRC review, a favorable recommendation was forwarded for consideration by the Planning Board and City Commission. 440 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 7 Public notice for this application was placed in the Bozeman Daily Chronicle on Sunday, September 14, 2008. The site was posted with a public notice on September 12, 2008. Finally, notice was sent to adjacent property owners via certified mail, and to all other property owners of record within 200 feet of the subject property via first class mail, on September 12, 2008. At the time of this report, no public comment was received at the Department of Planning & Community Development in regards to this project. On September 11, 2008, the minor subdivision staff report was drafted and forwarded with a recommendation of conditional approval to the Planning Board for consideration at their September 16, 2008 public hearing. The City Commission will make a final decision at their September 16, 2008 public hearing. Final decision for a Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat must be made within 60 working days of the date it was deemed complete or in this case by December 1, 2008. E. Provision of easements for the location and installation of any planned utilities. A 15-foot utility easement currently exists along the western perimeter of the property. A public access easement also exists for the drive access off Donna Way, which accesses the condominium development. F. Provision of legal and physical access to each parcel. When the southern, triangular portion of open space owned by the City of Bozeman is included in the south lot property perimeters, Planning Staff finds the proposed south lot to have legal and physical access on Donna Way and the proposed north lot to have legal and physical access on West Babcock Avenue. PUBLIC COMMENT No public comment was received by the Department of Planning & Community Development in regards to this application. Any public comment received after the date of this report will be distributed at the Planning Board or City Commission public hearings. RECOMMENDED CONDITIONS OF APPROVAL The recommended conditions of approval do not include code requirements identified in the staff findings. Mandatory compliance with the explicit terms of the Unified Development Ordinance does not constitute conditions of approval. The conditions of approval may require compliance with more than the minimum standards in order to conform to the physical and economic development of the City, and to the safety and general welfare of the future lot owners and of the community at large. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project. Planning Staff and the Development Review Committee (DRC) find that the application, with conditions, is in general compliance with the adopted Growth Policy, the Montana Subdivision and Platting Act and the Unified Development Ordinance. The Planning Board may provide advice and comments on the following recommended condition of approval: 441 Lot 70 Babcock Meadows Minor Subdivision Staff Report (#P-08010) 8 Conditions of Approval 1. Prior to final plat submittal, the property owner and representative shall obtain City Commission approval of the transfer/exchange of the open space property owned by the City of Bozeman. The request can be placed on the same agenda as the preliminary plat City Commission hearing, likely as the item directly before or after the preliminary plat. 2. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. New water and sewer services must be provided to the south lot. The services shall be installed or financially guaranteed prior to final plat approval. CONCLUSION/RECOMMENDATION Pursuant to Section 18.06.040.D of the Unified Development Ordinance, the Planning Board shall review the preliminary plat and supplementary information to determine if the proposed plat is in compliance or noncompliance with the adopted growth policy. The Planning Board shall act to recommend approval, conditional approval or denial of the preliminary plat application. The Board shall then provide advice and comments to the Bozeman City Commission for its consideration at its Monday, October 6, 2008 public hearing which begins at 6:00 p.m. The Planning Board Resolution #P- 08010 and minutes from the Planning Board’s September 16, 2008 public hearing will be forwarded to the City Commission and become a part of the Commission’s record. THE BOZEMAN PLANNING BOARD WILL MAKE A RECOMMENDATION TO THE BOZEMAN CITY COMMISSION. THE CITY COMMISSION SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET FORTH IN SECTION 18.66 OF THE UNIFIED DEVELOPMENT ORDINANCE. Encl: Representative’s revised preliminary plat submittal materials Planning Board minutes from September 16, 2008 public hearing CC: Mountain High Homes LLC, c/o Dan Barnes, 2285 Virginia City Ct., Bozeman, MT 59715 City of Bozeman, c/o Debbie Arkell, PO Box 1230, Bozeman, MT 59771 C & H Engineering and Surveying, Inc., 1091 Stoneridge Drive, Bozeman, MT 59718 File 442 MINUTES CITY OF BOZEMAN PLANNING BOARD COMMUNITY ROOM, GALLATIN COUNTY COURTHOUSE TUESDAY, SEPTEMBER 16, 2008 ITEM 1. CALL TO ORDER AND ATTENDANCE President JP Pomnichowski called the regular meeting of the Planning Board to order at 7:03 p.m. and directed the secretary to take attendance. Members Present: JP Pomnichowski, President Erik Henyon Donna Swarthout Chris Mehl Dawn Smith Sean Becker Brain Caldwell Cathy Costakis Members Absent: Bill Quinn (excused) Staff Present: Chris Saunders, Assistant Director of Planning Allyson Bristor, Associate Planner Shoni Dykstra, Planning Secretary Guests Present: Lucille Pope Kathie Callahan Susan Kozub Rosemary Bourne David Peck ITEM 2. PUBLIC COMMENT (0-15 MINUTES) {Limited to any public matter within the jurisdiction of the Planning Board and not scheduled on this agenda. Three-minute time limit per speaker.} Kathie Callahan, 702 Bridger Drive, presented an overview of the letter sent to Planning Board members from Alliance for Building Communities. She noted they appreciated the solutions suggested by the Work Force Housing Task Force and recommended utilizing the model to explore home ownership solutions. She noted they would also like the growth policy to identify manufactured housing as an important component of the affordable housing stock. She also suggested the growth policy promote affordable community models such as housing cooperatives, land trusts, non-profit governance models, or non-traditional neighborhood designs. Donna Swarthout thanked the Alliance for Building Communities for submitting the document, and noted her support of the recommended goals and objectives provided regarding chapter 5. Chris Mehl noted he would prefer to discuss the revisions in conjunction with the draft chapter. Erik Henyon sought clarification on the word usage of development rather than construction. Lucy Pope responded construction often has the connotation of stick built houses. President Pomnichowski noted she appreciated the suggestions presented and thanked the Alliance for Building Communities for their efforts. Seeing no further public comment, President Pomnichowski closed this portion of the meeting. City of Bozeman Planning Board Minutes of September 16, 2008. 1 443 ITEM 3. MINUTES OF SEPTEMBER 3, 2008. Seeing there were no changes, additions or corrections to the minutes, President Pomnichowski stated that the minutes from September 3, 2008 would stand as written. ITEM 4. PROJECT REVIEW 1. Subdivision Preliminary Plat Application #P-08010 (Lot 70 Babcock Meadows MiSub) - A Minor Subdivision Preliminary Plat Application on behalf of the property owners, Mountain High Homes, Inc. and the City of Bozeman, and the representative, C & H Engineering and Surveying, Inc, to allow subdivision of 0.96 acres into two lots for R-3 (Residential Medium Density District) development. The property is legally described as Lot 70, Babcock Meadows Sub, Phase 2A, SW4, Sec. 11, T.2S., R.5E., P.M.M., City of Bozeman, Gallatin County, Montana. (Bristor) Staff Report Allyson Bristor, Associate Planner, presented the staff report on Lot 70, Babcock Meadows minor subdivision preliminary plat application. She noted that it is generally located at the southwest corner of the intersection of West Babcock Avenue and Donna Way. She noted it was a second or subsequent minor subdivision to divide approximately .96 acres into two residential R-3 (Residential Medium Density District) lots. She noted the growth policy land use designation is residential. She stated the City owns a portion of the development along Donna Way which the owner is in the process of developing a purchase agreement with Debbie Arkell, Director of Public Service, in order to meet access and frontage requirements. She stated no public or agency comment had been received to date. Questions for Staff Brian Caldwell sought clarification on the frontage requirement not being met through open space. Planner Bristor responded the tract was a drainage requirement and was not designated as either open space or parkland. Chris Saunders, Assistant Director of Planning, added the requirement Mr. Caldwell was referencing also required alley access which this particular property did not have. Mr. Mehl sought clarification on the size of the City-owned parcel being transferred. Planner Bristor noted the arrangements were being made with Ms. Arkell and she did not know the exact size of the parcel. Mr. Mehl sought clarification on the precedent for situations like these. Planner Saunders responded the parcel owned by the City was the result of a ten-year-old argument which the City would have liked to have resolved 10 years ago, and as a result was not likely to set precedent. President Pomnichowski sought clarification on any variances the project would need. Planner Bristor noted the required sideyard setback was being addressed with the land acquisition and no variances were needed. President Pomnichowski sought clarification on the stormwater mitigation with the land ownership change. Planner Bristor noted engineering ensures stormwater requirements will still be met even with the transfer of City land. Mr. City of Bozeman Planning Board Minutes of September 16, 2008. 2 444 Henyon sought clarification on what changes would be made if the subdivision was not approved. Planner Bristor noted no changes would be made with the already approved projects. The ranch-style house facing Babcock exists and two condominium buildings are currently under construction through a currently approved site plan application. Applicant Presentation Dan Barnes noted the subdivision would allow the exclusion of the existing house in the condominium covenants, and the applicant had no objection to the recommended conditions. Questions for Applicant There were no questions for the applicant. Public Comment Seeing there was none, President Pomnichowski closed this portion of the hearing. Motion and Vote It was moved by Mr. Henyon, seconded by Mr. Mehl, to approve the preliminary plat of Lot 70 Babcock Meadows Minor Subdivision #P-08010 as conditioned by Staff. Those voting Aye being Mr. Henyon, Mr. Mehl, Cathy Costakis, Mr. Caldwell, Ms. Swarthout, Dawn Smith, Sean Becker, and President Pomnichowski. Those voting No being none. The motion carried 8-0. ITEM 5. BOZEMAN COMMUNITY PLAN UPDATE 1. Selection of a member to participate on the Downtown 2020 Neighborhood Plan. President Pomnichowski noted Mr. Caldwell and Mr. Henyon had both emailed her regarding their interest in participating in the creation of the Downtown 2020 Neighborhood Plan. Seeing no other members expressing interest, she noted the meetings would likely take place on Tuesdays, Wednesdays, or Thursdays over the lunch hour. Mr. Henyon noted those times would not work well for him. Mr. Caldwell was selected. 2. Review and discussion of Chapter 17: Review and Amendments Planner Saunders noted the materials presented are fairly standard and only addresses the review and amendments to an adopted growth policy. Mr. Henyon stated including a reference to the location and possibly the abbreviated summation of the reference in the Montana Code Annotated (MCA) could be helpful within the Chapter. Planner Saunders responded it could be placed in 17.4. President Pomnichowski responded it could be stated in 17.1. Planner Saunders responded a reference could fit there as well. President Pomnichowski sought clarification on how the supermajority vote of the Commission was established. Planner Saunders responded the Commission had adopted the policy within the City of Bozeman Planning Board Minutes of September 16, 2008. 3 445 last Update and was not required by the UDO or by the MCA. President Pomnichowski sought clarification on the definitions within the chapter. Planner Saunders responded the map and the text within the Land Use Chapter were used as definitions. President Pomnichowski stated the definitions were circular. Planner Saunders noted he could reference Chapter 7 with the definitions within Chapter 17. President Pomnichowski noted Chapter 7 was the chapter within the growth policy most likely to be amended. Mr. Caldwell noted you could make the argument for an amendment founded out of other portions of the growth policy. Ms. Swarthout noted the statement regarding the significant alterations could be struck altogether. President Pomnichowski responded she would like acceptable land use patterns defined. Ms. Smith noted that rephrasing it in a positive statement rather than a negative statement would be beneficial. Planner Saunders responded he would work on the wording. Mr. Caldwell noted the triggers for review was not sufficiently clarified in the update. President Pomnichowski sought clarification on the availability of a handout in the Planning Office. Planner Saunders responded Staff had developed a handout regarding Growth Policy Updates and Amendments. Planner Saunders responded 17.3 should address the questions Mr. Caldwell had brought up. President Pomnichowski noted the goal RA-1.3 was outside of the five year review period, and noted her fear of having cumulative reviews of amendments take longer than stated in the Update. Planner Saunders responded having different small amendments can impact the whole and so to mitigate the problem the cumulative review was developed. President Pomnichowski noted more frequent review could be in order. Planner Saunders responded the timing was a City Commission decision. 3. Review and discussion of Chapter 14: Regional Coordination and Cooperation Planner Saunders noted addressing coordination and cooperation across the region were required components of the growth policy. He noted the stand alone chapter regarding the coordination was a recommendation from the Clarion Report, and shared some of the coordination and cooperation currently taking place. Mr. Henyon sought clarification on the street and infrastructure coordination on the federal level was important to include. President Pomnichowski noted it could be referenced along with MDoT in RCC-2.6. She sought clarification as to why RCC-1.4 referenced Bozeman specifically instead of the Planning Area. Planner Saunders responded Bozeman City limits was important in that clause due to jurisdictional responsibilities such as responding to fire and police calls. Ms. Swarthout noted the list provided in RCC-2.4 should either be less definitive or be a more extensive list. She noted a general statement could be to address health, safety, and environmental issues. Ms. Costakis noted she would like the broader statement utilized. Planner Saunders noted the list was comprised of areas which had been discussed specifically to date. He noted the Update could include the list as well as the broader language. Mr. Becker sought clarification on the interdepartmental efficiencies and coordination such as the County addressing the mental health department and how that could be included in the Update. He noted institutionalizing the agreement with the forest service due to the proximity of federal lands and the location of Bozeman’s watershed was important. Mr. Henyon stated he agreed. 4. Review and discussion of Chapter 4: Historic Preservation – Goals and City of Bozeman Planning Board Minutes of September 16, 2008. 4 446 Objectives Planner Bristor noted Staff had developed two goals for the Historic Preservation chapter, the first focusing on the protection of historic resources and the second focusing on the advocacy and education of historic resources. Mr. Henyon sought clarification on funding sources and noted his concern of looking to federal sources as a main funding source. Mr. Mehl noted the impact the private donor had made on the Library LEED certification. Mr. Henyon noted the funding sources should include private funding. Mr. Caldwell noted the establishment of an Architectural Review Committee (ARC) could have an adverse impact on the Neighborhood Conservation Overlay District (NCOD) as it would be a volunteer board. Planner Bristor responded Bozeman is unique in the fact that it does not have an ARC. President Pomnichowski noted the Design Review Board reviewed projects in the entryway corridors, and sought clarification on the feasibility of DRB reviewing NCOD projects. Planner Bristor noted DRB review criteria is often not triggered by COA projects, but if review by the DRB started taking place, she would advocate including an additional member of the board with a background in historic preservation or architectural history. President Pomnichowski noted many of the implementation policies seemed like a Staff to-do list. Planner Saunders responded the Clarion Report suggested an action plan format for the implementation policies, and some implementation would be carried out by the public while others would be directed more at Staff. President Pomnichowski noted the language utilized in the goals was very firm. Planner Saunders noted a time line would also be included with the goals and ultimately the City Commission determined how hard to work to meet the Growth Policy. President Pomnichowski noted she did not disagree, but since the growth policy is the vision document the specific list of implementation policies might belong elsewhere. Ms. Smith noted commercial properties were not addressed as well as residential. She noted re- use of commercial buildings would be at odds with preservation at times and addressing the balance was important. Planner Bristor noted the text should address both residential and commercial projects. Ms. Swarthout sought clarification on usage of demolition/delay rather than demolition/affirmative maintenance. Planner Saunders responded demolition could only be delayed it could not be denied. Affirmative maintenance would promote the upkeep of historic buildings with punishments applicable if a building is not maintained. Mr. Henyon noted the provision of staff seemed more like a budget item than an implementation policy within the Update. Planner Saunders noted level of service standards including staff were included within the public safety documents, and he noted it did not denote the number of FTEs. Ms. Swarthout noted the growth policy is the vision document and it denotes areas we place value. Mr. Becker noted the wording could be changed to emphasize competency and expertise in historic preservation for Staff of the Planning Department. President Pomnichowski called for public comment. Suzan Kozub of Intrinsik Architecture noted she was representing RTR holdings. She noted her previous presentation of the campus village project southeast of the intersection of Kagy Boulevard and South 19th Avenue. She noted the UMU district was the key to the previously City of Bozeman Planning Board Minutes of September 16, 2008. 5 447 presented mixed use development. She noted the given growth policy designation only allowed for 30% commercial development and noted the mixed use development could fail because of the inflexibility of the percentages of usages. She noted the burden of the right balance should fall on the developer, and urged the board to change the designation to allow for a UMU zoned district. 5. Review and discussion of the Second Draft of the Updated Land Use Map. Planner Saunders noted the updates to the Land Use Map. He noted the inclusion of the existing conservation easements, MSU lands, and outlying suburban residential areas such as Tripletree. He noted the changes to the downtown community core area, North 27th Avenue, and the commercial node along Fowler and Patterson, and the portion along Patterson and Goldenstein had been changed from future urban to residential. Mr. Caldwell noted understanding the new growth policy designations was key to their decision making as well as the establishment of the basis of percentages. He stated there were a lot of unknowns at this time. Ms. Swarthout sought clarification on the need for housing in the area Ms. Kozub had mentioned from the ABC representatives. Ms. Pope responded there was not an easy answer as affordable housing required pricepoints. Mr. Caldwell responded the development would be subject to review under the affordable housing ordinance, but the basis of the percentage was really important. Ms. Kozub noted she could depict how the basis of the percentage would affect the project, but she noted the UMU allows for at least 20% commercial use. She clarified the property owner was not looking at the entire property to be UMU, but only the northern portion of the property. Mr. Caldwell sought clarification on the ability to utilize a PUD application for the area with the current growth policy designation to develop the same type of project Ms. Kozub had presented earlier. He also noted including a list of zoning districts allowable in each growth policy designation would be helpful to include in the Update. Planner Saunders responded the fundamental use of the corridor needed to be kept in mind as well. Ms. Smith noted the mixed use commercial designation was only allotted in two areas and the commercial district did need to end at some point. Mr. Henyon noted he would be in favor of exploring the changes Ms. Kozub had brought up. Ms. Smith noted the letter from Chris Naumann and sought clarification on the extension of the community core or the creation of another category. President Pomnichowski stated she did not have a problem extending the district. Planner Saunders responded the edges of districts such as the community core are always going to be merging. He stated an inclusive plan could be created with a subarea plan for the downtown area. Mr. Caldwell noted he would like to review how the changes in the designations affect the area and how it impacts property owners. Planner Saunders noted the intersection of 11th Avenue and Kagy Boulevard was an area where the proposed designation was different and a commercial node could also be an option for the area. ITEM 6. NEW BUSINESS President Pomnichowski noted she had contacted the water court regarding language for the City of Bozeman Planning Board Minutes of September 16, 2008. 6 448 City of Bozeman Planning Board Minutes of September 16, 2008. 7 Update. She noted the County Planning Department had invited the planning board to speak to them about the update process on October 28th. She stated she would also like to see the ABC’s proposed wording included into the housing chapter. Mr. Mehl stated he appreciated the change from construction to development. He sought clarification on the singling out of mobile housing. President Pomnichowski responded the growth policy currently had a paragraph regarding manufactured housing. Mr. Mehl noted he would not be at the October 7, 2008 meeting. Mr. Caldwell noted the County had recently conditioned a project to meet City water and sewer standards, and noted wording or encouragement of similar conditions should be included in the Update. Ms. Costakis stated she would develop a presentation regarding her tour of the Northwest if Board members would like. It was agreed that she should present on October 21, 2008. ITEM 7. ADJOURNMENT Seeing there were no further issues before the Board, President Pomnichowski adjourned the meeting at 9:37 p.m. __________________________________ __________________________________ JP Pomnichowski, President Chris Saunders, Assistant Director Planning Board Planning & Community Development City of Bozeman City of Bozeman 449 Lot 70 Babcock Meadows Minor Subdivision 1 RESOLUTION #P-08010 RESOLUTION OF THE CITY OF BOZEMAN PLANNING BOARD REGARDING A MINOR SUBDIVISION PRELIMINARY PLAT APPLICATION FOR THE SUBDIVISION OF 0.96 ACRES INTO TWO RESIDENTIAL LOTS. THE PROPERTY IS ZONED R-3 (RESIDENTIAL MEDIUM DENSITY DISTRICT) AND IS LEGALLY DESCRIBED AS LOT 70, BABCOCK MEADOWS SUBDIVISION, PHASE 2A, SW ¼ SEC. 11, TOWNSHIP 2S, RANGE 5E, OF PMM, CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA., GENERALLY LOCATED 3104 WEST BABCOCK STREET. WHEREAS, the City of Bozeman has adopted a growth policy pursuant to Section 76-1- 601, M.C.A.; and WHEREAS, the City of Bozeman Planning Board has been created by Resolution of the Bozeman City Commission as provided for in Title 76-1-101, M.C.A.; and WHEREAS, the property owners and applicants Mountain High Homes, LLC, c/o Dan Barnes, and City of Bozeman, c/o Debbie Arkell, submitted a Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application to divide 0.96 acres into two residential lots generally located at 3104 West Babcock Street on land described as Lot 70, Babcock Meadows Subdivision, Phase 2A, SW ¼ Sec. 11, Township 2S, Range 5E, of PMM, City of Bozeman, Gallatin County, Montana; and WHEREAS, the proposed Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application has been properly submitted, reviewed, and advertised in accordance with the procedures of Section 18.04 of the Bozeman Unified Development Ordinance; and WHEREAS, the City of Bozeman Planning Board held a public hearing on Tuesday, September 16, 2008, to review the application and any written public testimony on the request for said Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application; and WHEREAS, no members of the public spoke at the public hearing; and WHEREAS, the City of Bozeman Planning Board reviewed the application against the requirements of the Montana Subdivision and Platting Act, and found that with conditions the Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application would comply with those requirements; and NOW, THEREFORE, BE IT RESOLVED, that the City of Bozeman Planning Board, upon a vote of 8-0, recommends to the Bozeman City Commission that the application to divide 0.96 acres into two residential lots generally located at 3104 West Babcock Street on land 450 Lot 70 Babcock Meadows Minor Subdivision 2 described as Lot 70, Babcock Meadows Subdivision, Phase 2A, SW ¼ Sec. 11, Township 2S, Range 5E, of PMM, City of Bozeman, Gallatin County, Montana, be conditionally approved subject to the following conditions: 1. Prior to final plat submittal, the property owner and representative shall obtain City Commission approval of the transfer/exchange of the open space property owned by the City of Bozeman. The request can be placed on the same agenda as the preliminary plat City Commission hearing, likely as the item directly before or after the preliminary plat. 2. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. New water and sewer services must be provided to the south lot. The services shall be installed or financially guaranteed prior to final plat approval. DATED THIS DAY OF , 2008 Resolution #P-08010 _____________________________ ____________________________ Andrew C. Epple, Planning Director JP Pomnichowski, Chair Department of Planning & Community Development Planning Board City of Bozeman City of Bozeman 451