CHRISTY FIELDS CONCESSIONS
Preliminary Site Plan Checklist- Narrative
B. General Information
3. A construction route map shall be provided showing how materials
and heavy equipment will travel to and from the site. The route shall
avoid, where possible, local or minor collector streets or streets where
construction traffic would disrupt neighborhood residential character
or pose a threat to public health and safety.
Construction traffic will access site directly from East Mason Street which
is accessible from South Black Avenue.
10. Location, percentage of parcel(s) and total site, and square footage for
the following:
b. Driveway and parking
No permanent driveway exists for this project. All parking will remain
street parking.
c. Open space and/or landscaped area, recreational use areas,
public and semipublic land, parks, school sites, ect.
The entire site is a designated park area.
12. Total number, type and density per type of dwelling units, and total
net and gross residential density per residential parcel.
There are no existing or proposed dwelling units for this site.
13. The information required by Section 18.78.060.L, BMC (Streets,
Roads, and Alleys)…
There are no existing or proposed streets or alleys through the site.
14. Description and mapping of soils existing on the site, accompanied by
analysis as to the suitability of such soils for the intended construction
and proposed landscaping.
See the attached Soil Profile Map. The existing soils will be suitable for
the intended construction with the use of common construction methods.
44
16. Temporary facilities plan showing the location of all temporary model
homes, sales offices and/or construction facilities, including temporary
signs and parking facilities.
There are no proposed temporary buildings, facilities, or signs.
17. Unless already provided through a previous subdivision review, a
noxious weed control plan complying with Section 18.78.050.H, BMC
(Noxious Weed Management and Revegetation Plan).
Weed control for this site is handled by the Bozeman Parks Department.
18. Drafts of applicable supplementary documents as set forth in Chapter
18.72, BMC (supplementary Documents).
No changes in land ownership or land owner associations are involved
with this project.
C. Site Plan Information
3. On-site streets and right-of-way
There are no existing or proposed streets on-site.
4. On-site streets and right-of-way
There are no ingress or engress points.
5. Traffic flow on-site.
No traffic flow exists on-site.
6. Traffic flow off-site
Off-site traffic flow will remain as existing.
8. Surface water, including:
a. Holding ponds, streams and irrigation ditches
There are no ponds, streams, or ditches on this site.
b. Watercourses, water bodies, and wetlands.
There are no watercourses, water bodies, or wetlands on
this site.
45
c. Floodplains as designated on the Federal Insurance
Rate Map or that may otherwise be identified as lying
within a 100-year floodplain through additional
floodplain delineation, engineering analysis,
topographic survey or other objective and factual basis.
The project does not reside within a 100-year floodplain.
d. A floodplain analysis report in compliance with
Chapter 18.58, BMC (Bozeman Floodplain Regulations)
if not previously provided with subdivision review.
The project does not reside within a 100-year floodplain.
9. Grading and drainage plan, including provisions for on-site
retention/detention and water quality improvement facilities as
required by the Engineering Department, or in compliance with any
adopted storm drainage ordinance or best management practices
manual adopted by the city.
The proposed concession building will be set at approximately the same
elevation as the existing building which is approximately 1-foot higher
than the surrounding ground elevations. This situation will maintain the
pre-development storm drainage conditions where storm water is treated
on site through infiltration into the ground.
10. All drainageways, streets, arroyos, dry gullies, diversion ditches,
spillways, reservoirs, etc. which may be incorporated into the storm
drainage system for the property shall be designated:
a. The name of the drainageway (where appropriate)
There are no named drainageways.
b. The downstream conditions (developed, available
drainageways, etc.)
All storm water remains on site and is treated through
infiltration into the ground.
c. Any downstream restrictions
All storm water remains on site and is treated through
infiltration into the ground.
46
11. Significant rock outcroppings, slopes greater than 15 percent or other
significant topographic features.
There are no significant topographic features.
12. Sidewalks, walkways, driveways, loading areas, ect.
The project will include no significant modification to the existing
pedestrian travel system.
13. Provision for handicapped accessibility, including but not limited to,
wheelchair ramps, parking spaces, handrails and curb cuts, including
construction details and the applicant’s certification of ADA
compliance.
The project will maintain ADA compliance through the improvement and
extension of existing walkways surrounding the site.
14. Fences and walls, including typical details.
There are no proposed fences or walls for the project at this time.
15. Exterior signs. Note – The review of signs in conjunction with this
application is only review for compliance with Chapter 18.52, BMC
(Signs). A sign permit must be obtained from the Department of
Planning and Community Development prior to erection of any and
all signs.
Any signs will be permitted prior to installation.
16. Exterior refuse collection areas, including typical details.
The site will utilize the existing refuse collection areas.
18. Curb, asphalt section and drive approach construction details.
No curb or asphalt is proposed for this site.
19. Landscaping – detailed plan showing plantings, equipment, and other
appropriate information as required in Section 18.78.100, BMC
(Submittal Requirements for Landscaping Plans). If required
complete section C below.
Landscaping is currently fully developed at the site. The proposed
building is located so as to provide for a minimal impact to the existing
47
landscaping. Any trees affected by the proposed building will be removed
and relocated at the discretion of the Bozeman Parks Department.
21. Snow storage areas.
There are no paved areas which warrant the need for snow storage.
24. Historic, cultural and archeological resources, describe and map any
designated historic structures or districts, and archeological cultural
sites.
There are no historic, cultural or archeological resources on the site.
26. Exterior refuse collection areas, including typical details.
The site will utilize the existing refuse collection areas.
27. Describe how the site plan will satisfy any requirements of Section
17.02, BMC (Affordable housing).
There are no residential structures on site.
D. Landscape Plans
Landscaping is currently fully developed at the site. The proposed
building is located so as to provide for a minimal impact to the existing
landscaping. Any trees affected by the proposed building will be removed
and relocated at the discretion of the Bozeman Parks Department.
48
sheet index:
A1.1 TITLE SHEET/SITE PLAN
C1.0 OVERALL SITE PLAN
C1.1 SITE CIVIL PLAN
A2.1 FLOOR PLAN
A2.2 ROOF PLAN
A2.3A2.3 REFLECTED CEILING PLAN
A3.1 ELEVATIONS
A3.2 ELEVATION DETAILS
A4.1 BUILDING SECTIONS
A5.1 WALL SECTIONS
A6.1 RESTROOM ELEVATIONS
A1.2 DESIGN OPTIONS
49
50
51
CONCESSION101WOMEN102MEN103STORAGE10422' - 8"3A4.1103B134ABCD210' - 0"4' - 0"STORAGE INSL105CHASE1061A4.12A4.114' - 0"28' - 0"3' - 1"5' - 1"FS5' - 0"4' - 0"3' - 1"3' - 1"3' - 1"3' - 1"3' - 1"3' - 1"3' - 1"2' - 0"9' - 6"2' - 6"5A3.11' - 6"3' - 1"1' - 1"4' - 3"5' - 1"3' - 1"3' - 1"3' - 1"7' - 0"20' - 0"10' - 8"22' - 8"4' - 8"2A5.18"3' - 2"8"4' - 8"2' - 0"6' - 4"2' - 0"3' - 8"2' - 10"4' - 2"REFN/C4' - 0"10' - 0"3' - 4"10' - 0"5' - 1"3' - 1"3' - 1"3' - 1"1' - 6"8"5' - 4"8"1' - 4"9' - 4"8"5' - 4"8"3' - 4"7' - 4"7' - 4"7' - 8"SDSDPTD PTDPTD PTD11' - 4"30' - 0"CJEJCJ.SLOPE1/4"/FT1A5.119' - 4"3' - 6"4' - 0"9' - 0"9' - 0"8' - 8"4' - 0"6' - 8"6' - 0"3A5.1NCONCRETE PADFDCJEJCONCRETE PADHBPTDSDCABINETDOOR STOPEJCJCJCJCJCJCJLINE OF BEAM ABOVECONCRETE PAD4"10' - 8"4"PLAN ABBREVIATIONSHB= HOSE BIBBPTD= PAPER TOWEL DISPENSERSD= SOAP DISPENSERTPH= TOILET PAPER DISPENSERGB= GRAB BARMIR= MIRRORDF= DRINKING FOUNTAINFD= FLOOR DRAINCJ= CONTROL JOINTEJ= EXPANSION JOINTLINE OF ROOF OVERHANGABOVECJCJCJEJEJCJCJCJCJDF5A5.1TYP. OF 58' - 0"3' - 8"TPH TPHTPH TPH TPH TPHGBGBSDSDMIRMIRMIRMIRFDFDEJEJ3' - 4"1' - 4"3' - 4"1' - 4"2' - 8"7' - 4"10' - 0"2' - 8"7' - 4"20' - 8"1' - 4"2' - 8"3' - 4"2' - 8"2' - 0"6' - 0"6' - 0"7' - 0"7' - 0"7' - 0"4' - 6"3' - 0"7' - 0"4' - 4"COUNTER-TOP DOORTYPE A-FLUSH PANELTYPE B-DUTCHFLUSH PANELTYPE C-UNEQUAL PAIR FLUSHTYPE D FLUSH-PANELDIM. VARIES2' - 10"4' - 2"7' - 4"7' - 4"7' - 4"2' - 8"4' - 8"3' - 4"2' - 8"7' - 4"4' - 8"ALL FRAMES TO BE HOLLOW METAL FRAMESTYPE 1TYPE 2 TYPE 3 TYPE 44"4"4"2"2"TYP.ALL DOORS HOLLOW METALProject numberDateDrawn byChecked byMontana State UniversityCommunity Design CenterChristie Fields Concessions19-07cdc@montana.eduCity of Bozeman and Gallatin Empire Lions ClubDarren Dobie-G.E.L.C.Thom White-Superintendent of Parks & CemeteryCDC Student Manager-Josh SchmidtCDC Director-Thomas McNabCITY OF BOZEMAN PARKS DIVISION 814 NORTH BOZEMAN (406)582-3224DISCLAIMERCDC Status/Standard of Workmanship: The workrepresented on these drawings has been performed bystudents enrolled in the Community Design Center (CDC).The students are not professional architects/designers andthere is no representation that the services providedhereunder are professional services provided by independentContractors. The project is undertaken to provide studentspractical experience as part of the undergraduate educationalexperience.The information contained in these drawings is intendedsolely to provide the geometry of the building and has beenprepared for the use of the Bozeman Park Department.Please note that the CDC has not provided structural orplumbing design based on calculations prepared by a licenseddesign professional and therefore does not represent theaccuracy or reliability of any structural or plumbinginformation contained on those parts of the drawings.A2.1080501JMSCheckerFLOOR PLAN 1/4" = 1'-0"1FLOOR PLANNOTES:1. SLOPE ALL INTERIOR SLABS TO DRAIN2. SLOPE ALLE XTERIOR SLABS MIN. 1/4"/FT AWAY FROM BUILDING3. SLOPE GRADE UP TO TOP OF SLAB FOR ADA ACCESS 1/4" = 1'-0"2DOOR TYPESDOOR SCHEDULERoomName MarkDoorMaterial Door Type Height Width ThicknessFrameMaterial Frame Type NotesMEN 102A HM A 7' - 0" 3' - 0" 0' - 1 3/4" HM 1WOMEN 101A HM A 7' - 0" 3' - 0" 0' - 1 3/4" HM 1STORAGE 104C HM C 7' - 0" 4' - 0" 0' - 1 3/4" HM 3 PAIRSTORAGE 104D HM C 7' - 0" 3' - 0" 0' - 1 3/4" HM 3 PAIRCONCESSION103A HM B 4' - 0" 2' - 4" 0' - 1 3/4" HM 1 DUTCHDOORCONCESSION103B HM D 4' - 2" 4' - 0" 0' - 1 3/4" HM 4CHASE 106A HM A 7' - 0" 2' - 4" 0' - 1 3/4" HM 2STORAGEINSL.105A HM B 7' - 0" 2' - 4" 0' - 1 3/4" HM 2STORAGE 104A HM C 7' - 0" 4' - 0" 0' - 1 3/4" HM 3 PAIRSTORAGE 104B HM C 7' - 0" 3' - 0" 0' - 1 3/4" HM 3 PAIRROOM FINISH SCHEDULEName NumberWallMaterial Wall Finish Floor Material Floor FinishCeilingMaterialCeilingFinishDoors andFramesCONCESSION 101 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINTWOMEN 102 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINTMEN 103 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINTSTORAGE 104 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINTSTORAGE INSL 105 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINTCHASE 106 CMU SEALER CONCRETE SEALER OSB CLRFINISHPAINT 1/4" = 1'-0"3FRAME TYPESCMU= CONCRETE MASONRY UNITOSB= ORIENTED STRAND BOARDNo. Description DatePRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT52
FLOOR PLAN0' - 6"3A4.1ABCD1A4.1COUNTER DOOR IN OPEN POSITIONT.O.M.17' - 2"1' - 0"1' - 0"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"3' - 0"2' - 8"2' - 8"CCCCCCBACCCCCCCB5A3.1A5.142,3A5.11281288"4"8"4"8"PER STRUCT.A5.11FINISHED OSB2' - 10"7"DF2" STANDING SEAMMETAL ROOFINGRIDGE FLASHINGOSB FACIACLEAR FINISHMETAL DRIP EDGEHM DOOR AND JAMBPAINTED FINISHHM DOOR AND JAMB, PAINTMETAL COLM.PAINTEDFLOOR PLAN0' - 6"3A4.1ACD1A4.1AAABBBBBBCC CCCCCCCCCCCT.O.M.17' - 2"CCDETAILCOURSING ABOVE ROOF LINE TO BE BLACK SPLIT-FACED BLOCKSChristie Fields2,3A5.18"4"8"4"8"2' - 10"7"4' - 4"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"8' - 0"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"11' - 8"1' - 0"3' - 0"2' - 8"2' TEXT, BANK GOTHIC, REDDF1' - 4"1' - 0"METAL DRIP EDGEOSB FACIACLEAR FINISHHM DOOR AND JAMBPAINTED FINISHFLOOR PLAN0' - 6"1342A4.12' - 8"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"2' - 8"1' - 0"3' - 0"2' - 8"AAAAAAAAAA1' - 0"1241245' - 0"4' - 4"FLASHINGOSB FACIACLEAR FINISHSLOPESLOPEFLOOR PLAN0' - 6"13422A4.1T.O.M.17' - 2"restroomsA5.13A5.12DF2' - 10"3' - 5"412512METAL ROOFINGOSB FACIAMETAL COLM. PAINTMETAL DRIP EDGE4X10 BEAMOSB PAINTED FINISHMETAL RIDGE1' TEXT, BANK GOTHIC, REDSLOPEFLOOR PLAN0' - 6"1342T.O.M.17' - 2"WOMENMENHM DOOR AND JAMBPAINTED FINISHDFCOLM. PAINTED4X10 BEAMOSB CLEAR FINISH4X10 BEAM6" TEXT, BANK GOTHIC, REDSLOPEProject numberDateDrawn byChecked byMontana State UniversityCommunity Design CenterChristie Fields Concessions19-07cdc@montana.eduCity of Bozeman and Gallatin Empire Lions ClubDarren Dobie-G.E.L.C.Thom White-Superintendent of Parks & CemeteryCDC Student Manager-Josh SchmidtCDC Director-Thomas McNabCITY OF BOZEMAN PARKS DIVISION 814 NORTH BOZEMAN (406)582-3224DISCLAIMERCDC Status/Standard of Workmanship: The workrepresented on these drawings has been performed bystudents enrolled in the Community Design Center (CDC).The students are not professional architects/designers andthere is no representation that the services providedhereunder are professional services provided by independentContractors. The project is undertaken to provide studentspractical experience as part of the undergraduate educationalexperience.The information contained in these drawings is intendedsolely to provide the geometry of the building and has beenprepared for the use of the Bozeman Park Department.Please note that the CDC has not provided structural orplumbing design based on calculations prepared by a licenseddesign professional and therefore does not represent theaccuracy or reliability of any structural or plumbinginformation contained on those parts of the drawings.A3.1080501JMSCheckerELEVATIONS 1/4" = 1'-0"1NORTH ELEVATION 1/4" = 1'-0"2SOUTH ELEVATION 1/4" = 1'-0"3WEST ELEVATION 1/4" = 1'-0"4EAST ELEVATIONNOTES:1. BEAMS AND COLUMNS 32" O.C. EACH WAY & AROUND ALL OPENINGS2. TWO COURSES BELOW T.O.W., SEE ELEVATIONS FOR SOLDIER USE3. ELEVATIONS REPRESENT ACTUAL COURSING4. FOR GLASS BLOCK ASSEMBLIES SEE A3.2 1/4" = 1'-0"5RESTROOM DOOR WALL ELEVATIONBLACK, SPLIT-FACED CMUABCLEGENDGLASS BLCCK ASSEMBLY, SEE 2 ON A3.2GLASS BLCCK ASSEMBLY, SEE 3 ON A3.2GLASS BLCCK ASSEMBLY, SEE 4 ON A3.2No. Description DatePRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT53
12' - 0"9' - 6"2' - 0"8' - 0"2' - 0"4' - 9"3' - 1"3' - 4"3' - 1"22' - 8"24' - 0"2' - 8"9' - 4"9' - 4"LARGE EXTENDED OPTIONS, RESTROOMS, CONCESSIONS, AND STORAGEINITIAL OPTIONS FOR CHRISTIE, RESTROOMS, CONCESSIONS, AND STORAGECONCESSIONS WITH STORAGE OPTIONSRESTROOMS WITH STORAGE OPTIONSBASIC RESTROOM UNITSMALL RESTROOMSMALL RESTROOMWITH CONCESSIONSSMALL RESTROOMSWITH CONCESSIONSBASIC CONCESSIONS UNITProject numberDateDrawn byChecked byMontana State UniversityCommunity Design CenterChristie Fields Concessions19-07cdc@montana.eduCity of Bozeman and Gallatin Empire Lions ClubDarren Dobie-G.E.L.C.Thom White-Superintendent of Parks & CemeteryCDC Student Manager-Josh SchmidtCDC Director-Thomas McNabCITY OF BOZEMAN PARKS DIVISION 814 NORTH BOZEMAN (406)582-3224DISCLAIMERCDC Status/Standard of Workmanship: The workrepresented on these drawings has been performed bystudents enrolled in the Community Design Center (CDC).The students are not professional architects/designers andthere is no representation that the services providedhereunder are professional services provided by independentContractors. The project is undertaken to provide studentspractical experience as part of the undergraduate educationalexperience.The information contained in these drawings is intendedsolely to provide the geometry of the building and has beenprepared for the use of the Bozeman Park Department.Please note that the CDC has not provided structural orplumbing design based on calculations prepared by a licenseddesign professional and therefore does not represent theaccuracy or reliability of any structural or plumbinginformation contained on those parts of the drawings.A1.2080501JMSCheckerDESIGN OPTIONS 1/8" = 1'-0"1FLOOR PLAN OPTIONSBEGINNING AT THE TOP WE START WITH THE MOST BASIC OF MODULES. THE RESTROOMSAND CONCESSIONS ARE BOTH ABLE TO STRETCH FOR LARGER PROJECTS. IT STARTSAS JUST A RESTROOM AND THEN ADDS CONCESSIONS OR STORAGE. THESE TWO UNITSTHEN EXPAND AND FINALLY ALL THREE COMPONETS ARE INCLUDED IN THE BUILDINGWHICH STILL HAS THE ABILITY TO STRETCH AND PULL DEPENDING UPON THENEEDS OF THE AREA.No. Description DatePRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT54
2' - 0"1' - 5"3' - 6"1' - 2"2' - 10"6"3' - 0"1' - 6"1' - 3"GBTPDSD SDMIR MIRTPD3' - 9"8"CCCCCCCCCCBBCCCAPTD PTD1' - 6"1' - 3"2' - 10"3' - 4"2' - 0"1' - 0"4' - 10"3' - 1"MIR MIRTPH TPH TPHSD SDCCCC CCCCCCCCCCProject numberDateDrawn byChecked byMontana State UniversityCommunity Design CenterChristie Fields Concessions19-07cdc@montana.eduCity of Bozeman and Gallatin Empire Lions ClubDarren Dobie-G.E.L.C.Thom White-Superintendent of Parks & CemeteryCDC Student Manager-Josh SchmidtCDC Director-Thomas McNabCITY OF BOZEMAN PARKS DIVISION 814 NORTH BOZEMAN (406)582-3224DISCLAIMERCDC Status/Standard of Workmanship: The workrepresented on these drawings has been performed bystudents enrolled in the Community Design Center (CDC).The students are not professional architects/designers andthere is no representation that the services providedhereunder are professional services provided by independentContractors. The project is undertaken to provide studentspractical experience as part of the undergraduate educationalexperience.The information contained in these drawings is intendedsolely to provide the geometry of the building and has beenprepared for the use of the Bozeman Park Department.Please note that the CDC has not provided structural orplumbing design based on calculations prepared by a licenseddesign professional and therefore does not represent theaccuracy or reliability of any structural or plumbinginformation contained on those parts of the drawings.A6.1080501JMSCheckerRESTROOM ELEVATIONS 1/4" = 1'-0"1MENS RESTROOM ELEVATION 1 1/4" = 1'-0"2MENS RESTROOM 2 1/4" = 1'-0"3MENS RESTROOM 3 1/4" = 1'-0"4MENS RESTROOM 4 1/4" = 1'-0"5RESTROOM ELEVATION WOMENS 1/4" = 1'-0"6WOMENS RESTROOM 2 1/4" = 1'-0"7WOMENS RESTROOM 3 1/4" = 1'-0"8WOMENS RESTROOM 4BLACK, SPLIT-FACED CMUABCLEGENDGLASS BLCCK ASSEMBLY, SEE 2 ON A3.2GLASS BLCCK ASSEMBLY, SEE 3 ON A3.2GLASS BLCCK ASSEMBLY, SEE 4 ON A3.2No. Description DatePRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCTPRODUCED BY AN AUTODESK STUDENT PRODUCT55
To: Doug Riley
Date: October 1, 2008
RE: Christie Restrooms/Concessions
From : Thom White, Parks/Cemetery Superintendent
It is important to point out that the Christie project has been financed by the Lion’s club
through the design stage and along with a Park Improvement Grant ($41,750). The project will
be financed through fundraising, donations and labor in lieu of. No additional general fund
dollars, other than the PIG fund award, are going towards this project.
56