HomeMy WebLinkAbout2008 Bozeman Landfill Final Closure Notice of Award CO.
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Dustin Johnson,Project Engineer
Chris Kukulski, City Manager
SUBJECT: 2008 Bozeman Landfill Final Closure Contract Notice of Award
MEETING DATE: 10/20/08
BACKGROUND: Attached are three copies,of the Notice of Award for the above referenced
project. This project includes the construction of an 11-acre soil cover
system to overlie the remaining portions of the City of Bozeman Landfill
which have reached their final waste elevations. Construction elements
include a 5.5 foot thick final cover system, leachate cleanout extensions,
reclamation of borrow area, seeding, and erosion control. Additive
Alternate#1 includes closure of a 0.8 acre asbestos pit.
Bids for the above-referenced project were opened on September 22,2008
with 12 bids being submitted. The low bid was submitted by Trapper
Peak Construction,Inc. in the amount of$304,600.00. The Bid
Tabulation for the project is attached.
The contract engineer, Great West Engineering,has reviewed the bids and
found the low bidder to be responsive and recommends the contract be
awarded to Trapper Peak Construction, Inc. Attached is a copy of Great
West Engineering's letter of recommendation.
The project is currently funded in the solid waste closure/post closure
fund.
RECOMMENDATION: Approve and authorize City Manager to sign the Notice of Award.
FISCAL EFFECTS: $304,600.00 to be paid from the Solid Waste Fund upon
completion of improvements.
ALTERNATIVES: Disapprove
Respectfully submitted,
1
Dustin Johnso Project ngineer Chris A. Kukulski, City Manager
Attachments:Notice of Award
Letter of recommendation from
Great West Engineering
Bid Tabulation
Report compiled on 10/8/08
NOTICE OF AWARD
TO: Trapper Peak Construction,Inc. Dated: 9/22/2008
ADDRESS:. P.O.Box 184, Willow Creek,MT 59760
PROJECT: Final Landfill Closure
CONTRACT FOR: Final Landfill Closure
You are notified that your Bid dated for the above Contract has been considered. You are the
apparent Successful Bidder and have been awarded a Contract for: City of Bozeman Final Landfill
Closure. The Contract Price of your Contract is: Three Hundred Four Thousand, Six Hundred Dollars
($304,600).
5 Copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of
Award.
5 Sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15) days of the date of
this Notice of Award,that is,by November 4,2008.
1. You must deliver to the OWNER Five(5)fully executed counterparts of the Agreement including
all the Contract Documents and Drawings.
2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the
Instruction to Bidders (Article 20), General Conditions (paragraph 5.01) and Supplementary
Conditions(paragraph SC-5.1),
3. List other conditions precedent: Required Insurance Certificates and evidence of Worker
Compensation Insurance as required in the General Conditions and Supplementary Conditions
Failure to comply with these conditions within the time specified will entitle OWNER to consider
your Bid abandoned,to annul this Notice of Award,and to declare your Bid Security forfeited.
Within ten (10) days after you comply with these conditions, OWNER will return to you one
fully signed counterpart of the Agreement with the Contract Documents attached.
CITY OF BOZEMAN,MONTANA ATTEST:
BY: BY:
(CITY MANAGER) (CLERK OF COM?LSSION)
DATE: October 20,2008
i
HELENA BILLINGS
PO Box 4817 ♦ 2501 Belt View Drive 115 N Broadway♦ Suite 500
i Helena,MT 59604 Billings,MT 59101
(406)449-8627 • Fax(406)449-8631 (406)652-5000 ♦ Fax(406)248.1363
www.greatwesteng.com
�Eh--77-
Greaffiest
I
engineering
i
September 25, 2008
I
Steve Johnson
City of Bozeman Landfill
PO Box 1230
Bozeman, MT 59771-1230
i
RE: City of Bozeman Landfill Phase a Closure Project
Dear Steve Johnson:
We have reviewed the bids received on September 22, 2008 from twelve contractors for
construction of the above referenced project. The low responsive bidder is Trapper
I Peak Construction, Inc. with a bid of $304,600.00, We have also received, and have
reviewed, the requested qualifications information from Trapper Peak Construction, Inc.
The qualifications information submitted by Trapper Peak Construction, Inc. documents
Ethat they completed these types of projects in the past. We have also made telephone
calls to two of the engineers who worked with Trapper Peak Construction, Inc. on similar
projects. The reference checks indicated that Trapper Peak Construction, Inc.
successfully completed each of these projects.
This letter serves as Great West Engineering's recommendation to award the City of
Bozeman Landfill Phase II Closure Project contract to Trapper Peak Construction, Inc. If
the City concurs with our recommendation, please sign this letter and the Notice of
Award, keep a copy of the letters for your records and mail the originals to back to me. If
you have any questions, please do not hesitate to contact me at 449-8627.
Sincerely,
Great West Engineering
Steph nie Reinig, El Mr. Steve Johnq6n
Project Engineer City of Bozeman Solid Waste Manager
i
i
FABOZEMAN-LF Consulting-99104\COriStructlon\PHII Closurelawardlaward letter,doc
BID TAB SHEET FOR 2008 Landfill Phase 2 Closure
NAME&ADDRESS REG# BID SECURITY Addendum#1 TOTAL BID
Montana Civil Contractors,Inc 155802 Yes
PO Box 1019 10�0 $393,414
Belgrade,MT 59714
Trapper Peak Construction,Inc. 156472 Yes
P.O.Box 184 10% $304,600
Willow Creek,MT 59760
Sime Construction 5354 Yes
7720A Shedhorn 140 10% $407,500
Bozeman,MT 59719
149105
W Construction LLC 10%
214 South Wilson Ave Ste B Yes $453,997.75
Bozeman MT 59715
Toomer Construction,Inc. ? 10% Yes
6989 N 3500 E $707,780
Menan ID 83434-5063
Delhur Industries,Inc. 12770 101/10 Yes
30607 Oldfield Street $834,412
Hermiston,OR 97838
Pumco,Inc. 7909A 10% Yes
P.O.Box 700 $558,000
Lolo,MT 59847
Advanced Earthworks,Inc 52014 10%
1659 North 1"Street Suite 13 Yes $394,500
Hamilton, MT 59840
AM Welles 5022 10%
P.O.Box 2808 Yes $498,000
Norris MT 59745
BID TAB SHEET FOR 2008 Landfill Phase 2 Closure
NAME&ADDRESS REG# SECIIRIITY Addendum#1 TOTAL BID
Shumaker Trucking And Excavating Contractors,
Inc 5199 100,1
Yes $609,700
PO Box 1279
Great Falls,MT 59403
M.A.DeAtley Construction,Inc. ?
PO Box 490 10% Yes $499,500
Clarkston WA 99403
Bozeman Sand&Gravel,Inc.
PO Box 1327 12878 10% Yes $419,300
Bozeman,MT 59771
$
$
These bids were opened and read fore t e ndersi ned at 2 p.m.on September 22,2008.
_ Gl
ADeie Arkell Ste a hnson S cy U e
Director of Public Service Sanitation Superintendent City Clerk-)