HomeMy WebLinkAboutPlanning Report final
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Finance Director
Andy Epple, Planning Director
Chris Kukulski, City Manager
SUBJECT: Planning Department 1st Quarter FY09 Update
July 1-Sept 30, 2008
MEETING DATE: October 27, 2008
RECOMMENDATION: Move forward with current Planning Department staff levels;
noting this is a reduction of 1.5 FTE’s from the FY09 Adopted Budget.
BACKGROUND: Because of the difficulties estimating Planning Fee revenues and
workloads (planning applications) this fiscal year, we committed to make quarterly decisions
regarding staffing levels and operating costs in the department.
The FY09 Budget was balanced with the following assumptions:
1. Monthly Planning Fee Revenues of $20,000, minimum. This estimate was based
on the average revenue from fees for the months of April – June 2008.
Basis for FY09 Budget Estimates – Actual Revenues 4th QTR FY08
April 2008 33,000.00
May 2008 12,000.00
June 2008 16,000.00
Average Per Month: 20,300.00
Actual Revenues 1st QTR FY09
July 2008 20,000.00
August 2008 16,000.00
September 2008 32,500.00
Average Per Month: 22,800.00
Actual revenues for the quarter averaged $22,800 per month, 14% over our
budget estimate.
Fees in the month of September include $14,500 for the Cascade Development
Improvements Agreement administration. This large fee makes up 44% of fees
collected for the month. Without this collection, revenues for September would
have been $18,000; and the three-month average would be below our budget
projections of $18,000.
2. Increase Planning Fee levels based on audit findings, to more accurately cover the
costs associated with processing applications.
• The new fees went into effect on August 28, 2008.
3. Reduce FTE’s by: 1 Planner Tech, 0.5 Admin Assistant, 1 Workforce Housing
Coordinator. Since these reductions, additional vacancies have occurred:
• In August, a vacancy occurred in the Planner III-Long Range
Planning position. In mid September the 0.5 FTE Administrative
Assistant position became vacant.
• Together, these positions represent 1.5 FTE’s and approximately
$6,000 of existing budget authority for each month of the fiscal year.
• In effect, Planning Fee revenue could fall to $14,000 per month and
the Planning Fund would not require increased General Fund dollars
to stay in balance.
• We are not recommending filling the Planner III position.
Administrative Assistant temporary help may be needed to cover
evening meetings and leave time, but that will be paid out of existing
contract services budget.
4. Budgeted Expenditures: The Department’s budget averages $69,800/month
($873,000 for the year.) Actual spending for the quarter was $209,334, or
$69,800/month, right on target. Other than the vacancy savings listed above,
three are no known changes to budgeted expenditures for the Department that we
are aware of at this point in time.
5. Applications Received: The table below lists the planning applications that were
received each month of this quarter. For the months of April, May, and June 2008
(previous quarter), the department averaged 42 applications/month. This quarter
the department averaged 41 applications each month.
July
Applications
August
Applications
September
Applications
Sub Pre App 1
Prelim Plat Min+Maj 2
Final Plat 1 1
Subdivision Exemption 1
Flood Plain
BOA 2 2
Admin Appeals 1
Amend Master Plan
Amend UDO
CUP 4 1
Amend Zone Map
Conservation Update
Entryway Update
PUD
PUD Final
Annexation
Site Review Prelim 2 3 1
Site Plan Master 1 1
Site Plan Final 3 5 4
Modifications to FSP 3 2 3
Informal 1 4
Special Temporary Use 1 1
COA 24 24 23
Imp Agreements 1
Total: 43 44 36
6. Workload for the next quarter: While the national credit and finance problems are
expected to continue to have a negative effect on subdivision and building in the
City, a number of items will effect workloads in the department.
• There are currently 23 subdivisions in various stages of the review and
permitting process (see attached list.) All subdivisions must obtain final
plat within a defined time or lose their approval and have to start over.
This is directed by state law. Several of the subdivisions will need to make
a decision to provide a financial guarantee and record their plats or allow
the approval to lapse. The exact length of approval can vary by
subdivision. These items are part of the “tail” of workload which has been
referred to previously.
• In summary, in 2007 there were a total of 283 zoning projects submitted of
which 234 had been received by October 22nd. This year, a total of 255
zoning projects have been submitted as of October 22nd. We hope to be
able to distribute the list by email in advance of the Monday meeting. If
not we will provide the detail for the Commission at the meeting.
• The Department of Planning and Community Development continues to
prepare the update to the Bozeman 2020 Community Plan. Formal release
of a draft is anticipated by the first of the year. Simultaneously we are
participating in the development of the Economic Development plan and
the Downtown Neighborhood Plan for which the Commission recently
committed funding.
• Subsequent to the completion of the growth policy update, a review and
update of the City’s land use regulations (UDO) will be undertaken. This
is expected to require at least one year of development and public review
although some priority items may be completed earlier. The duration of
this project will depend somewhat on the direction the Commission
provides in approving the document.
FISCAL EFFECTS: None.
ALTERNATIVES: As suggested by the City Commission.
Respectfully submitted,
Anna Rosenberry, Finance Director
Andy Epple, Planning Director
Chris Kukulski, City Manager
Report compiled on: October 22, 2008
Subdivision Status Review as of Oct. 22, 2008
App
Number
Date
Submitted Project Type Subdivision Name
P07032 7/3/07 MaSUB-Prelim
Story Mill Neighborhood Ph. 1-10 MaSub
Prel. Plat
P07004 1/16/07 MiSUB-Prelim Baxter Meadows Phase 4 MiSub Prel. Plat
P07046 10/31/07 MiSUB-Prelim
East Lake Commercial Center MiSub Prel.
Plat
P06051 8/7/06 MaSUB-Prelim Allison Subdivision MaSub
P06050 8/18/06 MiSUB-Prelim Village Downtown Minor Subdivision
P07037 7/24/07 MaSUB-Prelim Knolls East Highland South MaSub Prel. Plat
P07027 6/5/07 MaSUB-Prelim Aspen Park MaSub Prel. Plat
P06041 6/13/06 MaSUB-Prelim Edgewood Townhouses Major Subdivision
P07051 11/26/2007 MaSUB-Prelim Laurel Glen MaSub Ph 3 & 4 Prel Plat
P07047 10/31/07 MaSUB-Prelim Norton East MaSub Phase 1 Prel. Plat
P08004 4/18/08 MiSUB-Prelim Village Homesites Ph 1&2
P08007 7/10/08 MiSUB-Prelim Fellowship Baptist Church 2 lot minor sub
P08008 7/12/08 MaSUB-Prelim Mandeville major subdivision
P08010 8/21/08 MiSUB-Prelim Lot 70 Babcock Meadows minor sub
P07028 6/7/07 MaSUB-Prelim West Winds MaSub Phases 4-8 Prel. Plat
P05011 3/11/05 MaSUB-Prelim Cattail Lake Phase III MaSub Prel. Plat
P06009 2/18/06 MaSUB-Prelim
The Legends at Bridger Creek II MaSub
Prel. Plat
P03042 11/6/03 MaSUB-Prelim Baxter Meadows PH II MaSub Prel. Plat
P07011 2/27/07 MaSUB-Prelim
Baxter Meadows Ph.4 (The Crossing)MaSub
Prel. Plat
P05049 8/10/05 MaSUB-Prelim Bozeman Gateway MaSub Prel. Plat
P05071 11/14/05 MaSUB-Prelim
Diamond Estates II & III MaSub Preliminary
Plat
P05053 9/6/05 MaSUB-Prelim Meadow Creek MaSub Prel. Plat
P04041 8/10/04 MaSUB-Prelim Rosa MaSub Prel. Plat
Pending MiSUB‐Prelim Fire Station 3/911 Center
Pending MaSUB‐Final Traditions phases 2 and 3
Pending MaSub‐Final West Winds MaSub Phase 5
Blue is subdivisions with preliminary plat approval or in review
Pink is preliminary plat completed and some partial final plats, some phases still left
Green is a subdivision expected shortly