Loading...
HomeMy WebLinkAboutPublic Hearing & Adoption of Parts of the CIP Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Finance Director Chris Kukulski, City Manager SUBJECT: Public Hearing & Adoption of Parts of the Capital Improvements Program (CIP) for Fiscal Years 2010-2014. • Water Fund • Wastewater Fund MEETING DATE: January 26, 2009 BACKGROUND: On December 15, 2008, the Commission received the City Manager’s proposed Capital Improvements Program (CIP) for Fiscal Years 2010-2014. At that time, the document was made available to staff and the public online at http://www.bozeman.net/finance/capital_improvements_plan.aspx. We are presenting the CIP for adoption in its individual parts, over a number of public hearings. The presentation of the CIP for the Solid Waste Fund, Street Maintenance Fund and Forestry (Tree) Fund and General Fund are scheduled for a later date. Unscheduled Items: Projects are listed as “unscheduled” for any number of reasons, the most common of which is lack of funding during the plan years. Projects that we know will be needed in the next few years after the plan (FY15-FY18) are sometimes included in the plan as 65 “unscheduled” so that everyone can be aware they are on the horizon. Projects that are needed but are not ready for design or bid (often street expansions that do not have much of the required right-of-way) are also sometimes listed as “unscheduled”. Project Cost Estimates: All project and equipment costs are estimates that will not be finalized until the City accepts a qualified bid for that specific project or equipment. We have used the best information available to estimate these amounts, including knowledge of similar, recent projects or purchases. When available, we have used the most recent engineer’s estimate of costs. RECOMMENDATION: Take public comment, make desired changes to the plan, and adopt the Capital Improvements Program for FY10-14. FISCAL EFFECTS: Approving this plan does not provide appropriation authority. The FY09 projects and equipment will be incorporated into the FY10 City Manager’s Recommended Budget, which requires final approval before these projects will be funded. The remaining CIP years (FY11-FY14) serve as a work plan to guide staff, and will be reviewed and revised in the coming fall for our annual update of the CIP at this time next year. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, Anna Rosenberry, Finance Director Chris A. Kukulski, City Manager Report compiled on: January 20, 2009 On File in the City Clerk’s Office: Capital Improvements Program for Fiscal Years 2010-2014 66 WATER FUNDSUMMARY OF CIP BALANCES, REVENUES AND EXPENDITURESCIP FY2010-2004Current Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Projected Beginning CIP Balance 3,247,811$ 3,515,622$ 2,880,007$ 511,315$ 521,315$ 2,821,315$ Add: Revenues Dedicated to CIP 2,740,811 2,876,885 9,016,028 10,200,000 3,300,000 3,300,000 Less: Scheduled CIP Expenditures 2,473,000 3,512,500 11,384,720 10,190,000 1,000,000 90,000 __________ __________ __________ __________ __________ __________Projected Year-End CIP Balance 3,515,622$ 2,880,007$ 511,315$ 521,315$ 2,821,315$ 6,031,315$ 67 WATER FUNDRATE CHANGES & PROJECTION OF CUSTOMER GROWTHCurrent Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Rate Changes/Customer GrowthRate Study recommended Rate Increases - - 2.6% 2.6% 2.6% 4.0%______ ______ ______ ______ ______ ______Total Current Year Rate Changes - - 2.6% 2.6% 2.6% 4.0%Customer Growth Rate 4.0% 1.0% 2.0% 2.0% 2.0% 2.0%______ ______ ______ ______ ______ ______Total Percentage Increase in Base Year Revenues 4.0% 1.0% 4.6% 4.6% 4.6% 6.0%Percentage of Rates Dedicated to CIP:Total Percentage of Rates Dedicated to CIP 45.2% 45.2% 45.2% 45.7% 44.9% 43.2%68 WATER FUNDREVENUE PROJECTIONSCurrent Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Estimated Total Revenues 6,069,805$ 6,366,824$ 6,676,742$ 7,006,938$ 7,349,643$ 7,643,629$ Current Year Revenues Dedicated to CIP 2,740,811$ 2,876,885$ 3,016,028$ 3,200,000$ 3,300,000$ 3,300,000$ Add: Grants SRF Loan4,000,000 7,000,000 Cash On Hand 2,000,000 __________ __________ __________ __________ __________ __________Total Revenues Dedicated to CIP 2,740,811$ 2,876,885$ 9,016,028$ 10,200,000$ 3,300,000$ 3,300,000$ 69 CITY OF BOZEMANCAPITAL IMPROVEMENTS PROGRAM WATER FUND PROJECTSItem -----------Projected Costs by Fiscal Year----------- Not # Project Title Department/Division Category FY10 FY11 FY12 FY13 FY14 Total ScheduledW03BI-ANNUAL ENGINEERING DESIGN WATER OPERATIONS Project 90,000 90000 180,000 W04WATER BI-ANNUAL UPGRADES WATER OPERATIONS Project 1,100,000 1,000,000 2,100,000 W0722 MG MEMBRANE WATER TREATMENT PLANT WATER PLANT Project 2,000,000 10,000,000 10,000,000 22,000,000 W121 TON TRUCK W/HOIST WATER OPERATIONS Equipment 46,794 46,794 W15METER VAN WATER OPERATIONS Equipment 32,448 32,448 W16BACKHOE WATER OPERATIONS Equipment 107,078 107,078 W171 TON TRUCK (2) WATER OPERATIONS Equipment 36,400 36,400 W20TRANSMISSION MAIN BYPASS VALVES WATER OPERATIONS Project- 75,000 W21GUILLOTINE PIPE SAW WATER OPERATIONS Project 12,000 12,000 W224X4 1/2 TON TRUCK WATER PLANT Equipment 35,000 35,000 WW22LOWER YARD BUILDING WATER OPERATIONS Project 12,500 12,500 WW23MINI EXCAVATOR WATER OPERATIONS Equipment- 25,000 GF99 I5 REPLACEMENT WATER OPERATIONS Equipment 15,000 15,000 PW01SHOPS COMPLEX WATER OPERATIONS Project 1,500,000 1,500,000 PW02LAUREL GLEN SHOP ANNEX WATER OPERATIONS Project 100,000 100,000 Total3,512,500$ 11,384,720$ 10,190,000$ 1,000,000$ 90,000$ 26,177,220$ 100,000$ 70 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Bi-Annual Engineering Design & Survey Estimated Cost: $90,000 per year Project Number: Water Operations – W03 Date Scheduled: FY10 & FY12 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This item provides for design work to be completed every-other year, in anticipation of the Bi-Annual System Upgrades. We alternate funding of design work and construction work within the CIP. As the Water Operations Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following projects are candidates for design funding and were identified in the Facility Plan: 1. South 8th Avenue As annual operations occur, other more-urgent projects may be identified and designed under this project heading. Alternatives Considered: Advantages of Approving this Project: Provides for the design of necessary water system maintenance work. Estimated New Future Recurring Costs: None Funding Sources: 100% Water Utility Fund 71 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Bi-Annual Water Upgrades Estimated Cost: $1,000,000 per year Project Number: Water Operations – W04 Date Scheduled: FY11, FY13 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This item provides for construction to be completed every-other year, after the Bi-Annual Engineering Design. We alternate funding of design work and construction work within the CIP. As the Water Operations Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following projects are candidates for construction funding and were identified in the Facility Plan: 1. South 8th Avenue Water Main As annual operations occur, other more-urgent projects may be identified, designed, and constructed under this project heading. Alternatives Considered: Advantages of Approving this Project: Provides for the construction of necessary water system maintenance work. Estimated New Future Recurring Costs: Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500 per water-main mile maintained annually. Funding Sources: 100% Water Utility Fund 72 City of Bozeman Capital Improvements Plan FY09-13 Project Name: 22MG Membrane Water Treatment Plant Estimated Cost: $33.2 Million Total Project Number: Water Plant – W07 Date Scheduled: FY08-FY12 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This new Membrane Filter Treatment Plant is the preferred water treatment alternative identified in the adopted Water Facility Plan. It is recommended to be built with an initial configuration providing 22MGD of water treatment capacity, with future expansion capability to 36MGD. This addresses both the 10- and 20- year capacity requirement forecast for the City’s water treatment system. The current 15MGD WTP equipment is nearing the end of its useful life; the plant’s direct filtration treatment process, while effective most of the year, becomes only marginally effective during spring runoff or flash thunderstorms in the watershed, dropping plant efficiency as low as 70%; and, rapid population growth and expansion of city water services is increasing demand for water. The current plant capacity may be exceeded in as few as five years. The New Plant will be sited at the existing WTP site in an 18,800 sf building located directly north of the existing plant. It will include gravity thickeners, a drying bed building with dual vacuum-assisted beds, triplex micro strainers and sludge pumps. All these new facilities will easily fit on the approximately 33-acre parcel of City-owned property on the site. A 12-month pilot testing phase will need to be completed prior to design finalization. We are required to have the new plant online by October 2013. Extensions of that deadline are possible, but we are not relying on the assumption that they would be granted. Alternatives Considered: The Water Facility Plan considered numerous alternatives for water treatment. This was identified as the preferred alternative in the adopted plan. Advantages of Approving this Project: Planning for increased water supply to meet growing demands and to replace existing equipment that is at the end of its useful life. Estimated New Recurring Costs: This plant is estimated to require two new operators, in addition to existing plant staff. Annual O&M costs = est. $1,735,901 (including existing staff plus new plant expenses). Funding Sources: FY08 Pilot Testing = $200,000 Total 67% Water Utility Fund = $133,000 33% Water Impact Fees = $67,000 FY09 & FY10 Design = $3,000,000 Total 67% Water Utility Fund = $2,000,000 33% Water Impact Fees = $1,000,000 FY11 & 12 Construction = $30,000,000 Total 67% Water Utility Fund = $20,000,000 33% Water Impact Fees = $10,000,000 73 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Automated Water Fill Station Estimated Cost: $330,000 Project Number: Water Operations – W09 Date Scheduled: FY09 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: Replacement of the existing water fill station, which is operated on an “honor system” for water sales. People using cisterns, constructing roads or borings utilize this method to purchase necessary water from the city. This recommendation includes a heated building, automated meter, and 24/7 operation of the fill station. The deficiencies of the existing fill station were noted and a replacement was recommended in the adopted Water Facility Plan. Alternatives Considered: Continue with existing system, susceptible to theft. Advantages of Approving this Project: Ensures proper payment for quantity of water sold. Estimated New Recurring Costs: Unknown at this time. Will be better known when building is designed and automated meter system selected. Funding Sources: 100% Water Utility Fund 74 City of Bozeman Capital Improvements Plan FY09-13 Project Name: 1 Ton Truck With Hoist – Flex Fuel Estimated Cost: $46,749 Project Number: Water Operations – W12 Date Scheduled: FY11 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This request replaces asset # 2914, a 2001 Dodge 1-ton with 22,374 miles with a 1-ton truck with a hoist. This truck is used daily in both water and sewer operations to transport personnel and equipment. Average yearly mileage is 7,000 +. If the truck is replaced in FY 2011, the approximate mileage will be 70,000. Flex Fuel Vehicles will be purchased. Alternatives Considered: Keep the trucks and spend maintenance dollars to have truck serviceable. Advantages of Approving this Project: Advantages to the City for approving this request include savings on fuel. The new vehicles will improve safety of crews, there would be lower repair costs and it would help maintain current operations levels. Estimated New Recurring Costs: Funding Sources: 100% Water Utility Fund 75 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Meter Van Estimated Cost: $33,746 Project Number: Water Operations – W15 Date Scheduled: FY10 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: Meter Van is used daily in meter reading and installations. This van gets high mileage due to the fact it travels every street in our city once a month taking radio reads. Current mileage is 50,973. Alternatives Considered: Increased cost for repairs and down time. Advantages of Approving this Project: Minimize down time and increase safety in operation and daily duties. Estimated New Recurring Costs: Funding Sources: 100% Water Utility Fund 76 City of Bozeman Capital Improvements Plan FY09-13 Project Name: 4x4 Backhoe Estimated Cost: $107,078 Project Number: Water Operations – W16 Date Scheduled: FY10 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This vehicle replaces current asset #2633, a 1999 John Deere backhoe with 2168 hours on it. This hoe is used primarily for compacting ditches, loading trucks with material and does not have an extendable boom. Alternatives Considered: Continue to use older vehicle which is becoming unreliable and costly to maintain. Advantages of Approving this Project: Increased reliability and safety for staff and water operations. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. Funding Sources: 100% Water Fund 77 City of Bozeman Capital Improvements Plan FY10-FY14 Project Name: 4x4 Flex Fuel Truck Estimated Cost: FY10: $36,400 Project Number: Water Operations – W17 Date Scheduled: FY10 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: FY10: This vehicle replaces current asset #2647, a 1998 Chevy 4x4 with over 50,000 miles on it. This truck is used in our water valve operation program and is used in various light duty jobs. Alternatives Considered: Continue to use older vehicle which is becoming unreliable and costly to maintain. Advantages of Approving this Project: Increased reliability and safety for staff and water operations. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. Funding Sources: 100% Water Fund 78 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Water Valve Operator with Vacuum Estimated Cost: $41,000 Project Number: Water Operations – W18 Date Scheduled: FY09 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This is a trailer mounted hydraulic operated water valve operator. This trailer also has a vacuum that can remove debris to gain access to the valve and eliminate a second visit to vacuum with a separate piece of equipment. Alternatives Considered: Continue operations with separate vehicles. Advantages of Approving this Project: Increased efficiency with two functions on the same trailer. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower operating two vehicles. Funding Sources: 100% Water Fund 79 City of Bozeman Capital Improvements Plan FY09-13 Project Name: Valve installation and bypass of 18” and 24” water transmission mains Estimated Cost: $67,000.00 Project Number: Water Operations – W19 Date Scheduled: FY09 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This work involve insertion of 2 line stops on each of the mains and question and bypassing around the area that the work is being done. The bypass will allow continuation of water service to town. Operation crews can then cut in a valve on the isolated portion of the main. Alternatives Considered: None Advantages of Approving this Project: We will be able to have the ability to shut down flow from the Sourdough tank to town. Presently critical valves in these lines do not operate properly. If there is a break in these lines now there is a possibility of draining the tank. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Once we gain control of these lines we will be inserting new valves further down the line. Funding Sources: 100% Water Fund 80 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Guillotine Pipe Saw Estimated Cost: $12,000.00 Project Number: Water Operations – W21 Date Scheduled: FY 11 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: The Guillotine Saw that can cut water main pipe safer, quicker and more accurately than the cut off saws we currently use. Alternatives Considered: Continue to use cut off saws, these saws produce CO in the ditch which requires air to be blown in the ditch. Advantages of Approving this Project: Faster, safer water main repairs Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Depending on use, blades will need to be purchased at $34.00 each. Funding Sources: 100% water fund 81 City of Bozeman Capital Improvements Plan FY10-FY14 Project Name: 4x4 ½ Ton Flex Fuel Truck Estimated Cost: $35,000 Project Number: Water Plant – W22 Date Scheduled: FY11 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This vehicle replaces current asset #3219, a 2004 Dodge with over 80,000 miles on it. The vehicle will be used on a daily visits to finished water storage tanks, the Lyman WTP, and for the water Quality sampling run. Alternatives Considered: Continue to use older vehicle which is becoming unreliable and costly to maintain. Advantages of Approving this Project: Increased reliability and safety for staff and water operations. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. Funding Sources: 100% Water Fund 82 City of Bozeman Capital Improvements Plan FY10-14 Project Name: IBM i5 Replacement Estimated Cost: $90,000 Project Number: Date Scheduled: FY11 Purpose: □ New Replacement Facility • Equipment Project Description: Replacement of the mainframe computer that runs the City’s Enterprise- wide Financial software. This hardware needs to be replaced approximately every 5 years and was last replaced in FY2006. This item is critical to our ability to: • Bill and collect Water/Sewer/Garbage charges. • Bill and collect Street & Tree Assessments. • Receipt and track all other money owed/paid to the City. • Make payments to vendor’s doing business with the City. • Process payroll for City employees. • Create financial statements and reports. • Web-enables payments. Alternatives Considered: • Replace existing Enterprise-wide software with PC-based software. Brendan spoke with the County IT Director and received this info related to the County’s system: 1st year cost = $250,000 (installation, training, hardware) Thereafter, approximately $30,000 in annual maintenance costs, with a replacement $10,000 server being required every 5th year. • Continue to use current hardware for as long as possible. However, in addition to Financial Applications, the IBM server also hosts SunGard HTE applications for Building Permits, Code Enforcement, and Planning & Zoning. All these additional users and all this additional data are going to increasingly tax the servers resources to the point where system performance and customer service response time will probably be affected. Advantages of Approving this Project: Unnecessary system down-time is avoided when critical hardware is replaced in a timely fashion. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: No significant changes in system operations or maintenance costs are anticipated. Funding Sources: Water Fund: $15,000 Sewer Fund: $15,000 Solid Waste Fund: $15,000 General Fund: $45,000 Project Rating: 42 83 City of Bozeman Capital Improvements Plan FY10-14 Criteria Rating Notes This Project’s Score 1. Level of Service Up to 20 pts 20 - Corrects a health or safety hazard or prevents a critical breakdown of an existing city facility or equipment. 15 - Repairs, rehabilitates, or replaces physically deteriorated or functionally obsolete existing city facility or equipment. 10 - Brings an area up to the basic level of service as identified in an adopted city wide plan. 5 – Expands an approved City service. 0 – Other. 15 2. Operating Budget Impact Up to 10 pts 10 - Provides a significant decrease in city operating and/or maintenance expenses. 5 – Has a neutral or small impact on operating and/or maintenance expenses. 0 – Provides a significant increase in city operating requirements. 5 3. Service Area Up to 10 pts 10 – Direct Benefit to entire city. 5 – Direct benefit to roughly half city or indirect benefit to entire city. 2 – Direct benefit to small area of the city or indirect benefit to several areas. 7 4. Departmental Priority Up to 10 pts 10 – Critical to Department’s Mission 7 – High 3 – Moderate 0 – Questionable/Very Difficult to Complete 10 5. Commission Work Plan Up to 10 pts 10 – Identified project in Adopted Commission Work Plan 5 – Contributes to an indentified project in the Adopted Commission Work Plan. 0 – Not identified in Adopted Commission Work Plan. 0 6. Municipal Climate Protection (Municipal Climate Action Plan – MCAP) Up to 5 pts 5 – Is recommended by MCAP and will accomplish a stated MCAP goal. 3 – Will assist in meeting MCAP goal. 0 – No relation to MCAP. 0 7. Seasonal Use Up to 5 pts 5 – Year Round. 3 – Six to Eleven months per year. 1 – Five or fewer months per year. 5 TOTAL Up to 70 pts. 42 84 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Shops Complex – Phase I Estimated Cost: Total Cost Unknown. $1.5 Million improvements to benefit the Water Department operations in FY10. Project Number: Public Works – PW01 Date Scheduled: FY10 $1.5M Remainder FY11-14 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This project consists of identifying a site (ideally, among currently owned City properties) for the phased construction and relocation of all City Shops facilities. The present shops complex is built in a residential neighborhood and it is estimated to have twice the employees working out of the complex than what it was designed for. The present complex has high traffic loads. With the public water fill station there, driving and walking in the complex is dangerous at high traffic periods. Over the past few years, a number of solutions to this issue have been pursued. The Cardinal Distributing property seemed an ideal long-term solution, but fell through due to Montana Rail Link’s refusal to lease land to the City. Because of the complexities of trying to find another suitable option for this large and diverse group of facilities, we are not able to quantify all of the costs or project phases at this time. Alternatives Considered: Build a smaller satellite facility for high traffic volume operations; leave low traffic operations at existing facility. Advantages of Approving this Project: Constructing the complex in phases will allow additional time to secure funding for other phases, lessen traffic at the current site, possibly relocate the existing water fill site, and free up space in the current complex to alleviate crowding for other divisions. Estimated New Recurring Costs: Annual Operating & Maintenance Costs: Unknown at this point. Funding Sources: Phase I = $1.5 Million Water Fund (Included in current rate study.) Other Phases = Wastewater Fund, Street Maintenance Fund, Forestry Fund, Solid Waste Fund, General Fund (Parks) The existing site (purchased by the General Fund) would be sold once the final phase of the project is completed. This could pay for some of the General Fund’s financial obligations for the project. 85 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Laurel Glen Shops Annex Estimated Cost: $200,000.00 Project Number: Public Works – PW02 Date Scheduled: FY12 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: To upgrade current facility which is basically a pole barn with electricity to a facility which can house vehicles and personnel. This would include floor, paving, water/sewer services, offices, sidewalks. Alternatives Considered: Advantages of Approving this Project: Fuel savings in having vehicles stationed on the west side of the city, quicker response times to the surrounding area, frees up room at existing shop complex. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: $5,000.00 to $6,000.00 Funding Sources: 50% Water Fund 50% Sewer Fund 86 WASTEWATER FUNDSUMMARY OF CIP BALANCES, REVENUES AND EXPENDITURESCIP FY10-14Current Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Projected Beginning CIP Balance 5,181,000$ 5,883,550$ 2,183,550$ 568,550$ 467,998$ 1,449,116$ Add: Revenues Dedicated to CIP 1,502,550 10,472,424 12,554,180 1,234,213 1,234,213 1,234,213 Less: Scheduled CIP Expenditures 800,000 14,172,424 14,169,180 1,334,765 253,094 1,187,963 __________ __________ __________ __________ __________ __________Projected Year-End CIP Balance 5,883,550$ 2,183,550$ 568,550$ 467,998$ 1,449,116$ 1,495,366$ 87 WASTEWATER FUNDRATE CHANGES & PROJECTION OF CUSTOMER GROWTHCurrent Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Rate Changes/Customer Growth Rate Study Recommended Rate Increases 9.0% 12.5% 12.5% 12.5% 4.0% 4.0% _____ _____ _____ _____ _____ _____Total Current Year Rate Changes 9.0% 12.5% 12.5% 12.5% 4.0% 4.0%Customer Growth Rate 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%_____ _____ _____ _____ _____ _____Total Percentage Increase in Base Year Revenues 11.0% 14.5% 14.5% 14.5% 6.0% 6.0%Percentage of Rates Dedicated to CIP:Total Percentage of Rates Dedicated to CIP 30.4% 23.3% 25.1% 17.5% 16.9% 16.2% 88 WASTEWATER FUNDREVENUE PROJECTIONSCurrent Year ----------------------------------------Projected----------------------------------------FY09 FY10 FY11 FY12 FY13 FY14Estimated Total Revenues 4,939,487$ 5,556,923$ 6,251,538$ 7,032,981$ 7,314,300$ 7,606,872$ Current Year Revenues Dedicated to CIP 1,502,550$ 1,297,424$ 1,569,180$ 1,234,213$ 1,234,213$ 1,234,213 Add: Grants SRF Loan - Net of Issuance Costs/Reserve 5,325,000 9,175,000 10,985,000 __________ __________ __________ __________ __________ __________Total Revenues Dedicated to CIP 6,827,550$ 10,472,424$ 12,554,180$ 1,234,213$ 1,234,213$ 1,234,213 89 CITY OF BOZEMANCAPITAL IMPROVEMENTS PROGRAM WASTEWATER FUNDItem -------------------------------Projected Costs by Fiscal Year------------------------------- Not # Project Title Department/Division Category FY10 FY11 FY12 FY13 FY14 Total ScheduledWW02 1 TON TRUCK W/ HOIST WW OPERATIONS EQUIPMENT 45,000 45,000 90,000 WW03 3/4 TON 4X4 PICKUP WW OPERATIONS EQUIPMENT 37,856 - 37,856 WW04 BNR PLANT CONSTRUCTION WW PLANT PROJECT 14,066,324 14,066,324 - 28,132,648 WW07 BI-ANNUAL ENGINEERING DESIGN WW OPERATIONS PROJECT 126,547 136,873 263,420 WW08 WASTEWATER BI-ANNUAL UPGRADES WW OPERATIONS PROJECT - 800,000 912,490 1,712,490 WW17 TELEVISION VAN REPLACEMENT WWOPERATIONS EQUIPMENT 263,218 263,218 WW20 DUMP TRUCK WWOPERATIONS EQUIPMENT 93,600 93,600 187,200 WW21 FLUSHER TRUCK WWOPERATIONS EQUIPMENT 253,094 253,094 WW22 INSULATION OF LOWER YARD BUILDING WWOPERATIONS PROJECT 12,500 - 12,500 WW23 MINI EXCAVATOR WWOPERATIONS EQUIPMENT- 25,000 WW24 LATCHET LAB EQUIPMENT WW PLANT EQUIPMENT 50,000 50,000 WW25 LIFTING VEHICLE WW PLANT EQUIPMENT- 87,000 PW01 SHOPS COMPLEX WWOPERATIONS PROJECT- UNKNOWNPW02 LAUREL GLEN SHOPS ANNEX WWOPERATIONS PROJECT 100,000 100,000 GF99 i5 REPLACEMENT WWOPERATIONS EQUIPMENT 15,000 15,000 Total14,172,424$ 14,169,180$ 1,334,765$ 253,094$ 1,187,963$ 31,117,427$ 112,000$ 90 City of Bozeman Capital Improvements Plan FY10-14 Project Name: 1 Ton Flex Fuel Truck with Hoist Estimated Cost: $45,000 each, FY12 & FY14 Project Number: Wastewater Operations – WW02 Date Scheduled: FY12 & FY14 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: FY11: Replaces a 2000 1-ton truck with a hoist. At the time of replacement, this truck will be 11 years old with 60,000 miles. FY14: Replaces a 2004 Ford F250, asset #3232. These trucks are used daily in both water and sewer operations to transport personnel and equipment. The existing truck will not be traded in; it will be utilized as a back-up vehicle when needed. Alternatives Considered: Keep the truck and spend maintenance dollars to have truck serviceable. Advantages of Approving this Project: Advantages to the City for approving this request include savings on fuel and emissions. The new vehicles will improve safety of crews, there would be lower repair costs and it would help maintain current operations levels. Estimated New Future Recurring Costs: Annual Operating Costs: Annual Maintenance Costs: Other Non-Capital Costs: none. Total: Funding Sources: 100% Wastewater Utility Revenue 91 City of Bozeman Capital Improvements Plan FY10-14 Project Name: ¾ Ton Flex Fuel Pickup Truck Estimated Cost: $37,856 Project Number: Wastewater Operations – WW03 Date Scheduled: FY11 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This is to replace asset # 2916 which is a 2001 Dodge Dakota ½ ton pickup which has 40,812 miles. At the time replaced, this vehicle will be 9 years old and have approx 73,000 miles. This truck is used to transport operations crews performing one call locates. Crews respond to over 5,000 calls a year for locate requests. The existing vehicle will be traded in, to reduce the total purchase price. Alternatives Considered: Continue to use older vehicle which is extremely small for the average water department employee. Advantages of Approving this Project: Advantages to the City for approving this request include continued reliability in water operations. Repair and maintenance costs will be minimized with replacement Estimated New Future Recurring Costs: Annual Operating Costs: Annual Maintenance Costs: Other Non-Capital Costs: none. Total: Funding Sources: 100% Wastewater Utility Revenue 92 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Water Reclamation Facility (WRF) Construction – Phase I Estimated Cost: $53.8 Million – Total, Phase I Project Number: Wastewater Plant – WW04 Date Scheduled: FY07 – FY12 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: The existing plant has reached its original design capacity of 5.8 MGD. Current organic loadings (lbs of BOD) now exceed the plant’s original design capacity for BOD by more than 20%. These critical loading parameters clearly point to the need for a major facility expansion. The City’s current MPDES (Montana Pollution Discharge Elimination System) permit includes a compliance schedule that requires us to begin removing total nitrogen and total phosphorous by September 2011 to meet interim Nutrient Standards set by the State Department of Environmental Quality. In order to meet the requirements of this schedule, the city needs to move forward with the construction of a WRF facility, as our existing facility is not designed to remove nitrogen & phosphorous. Bids received for the WRF facility on October 1, 2008 put the total project costs at a low of $65.7 Million (low bid) to a high of over $80.5 Million (high bid.) Because the low bid was so much higher than our estimate, the project has been scaled back but will still meet our permit requirements established for September 2011. Total adjusted project price is now estimated at $53.8 Million. Alternatives Considered: A variety of treatment technologies and alternatives are presented in the January 2006 Wastewater Facilities Plan. Alternative funding scenarios have been prepared, exploring the rates necessary to cover plant costs and differing amounts of impact fee dollars available for construction. Advantages of Approving this Project: Major capital expansion of the Bozeman WRF will enable the City to meet its ever growing demand for wastewater services and still produce a high quality effluent that is in full compliance with the City’s MPDES discharge permit. Expansion of the Bozeman WRF is consistent with the City’s long-term need to accommodate rapid growth and economic development in the Gallatin Valley. Estimated Future Recurring Costs: Annual Operating & Maintenance Costs: Similar to existing plant operations costs. The Facilities Plan estimates a total of $1,439,360 annually including all labor, power, chemicals, equipment maintenance, and equipment replacement. Funding Sources: FY07 Design: Total $3.9 Million 67% Wastewater Utility Cash = $2.33 Million 33% Wastewater Impact Fee Cash = $1.57 Million FY09 & FY10 & FY11 Construction: Total $49.9 Million 67% Wastewater Utility = $33.5 Million 33% Wastewater Impact Fee Eligible = $16.4 Million Eligible* *We anticipate having a minimum of $13.1 Million available from Impact Fees through the end of the construction period. Impact fee collections during the construction period will be dedicated to the project. The remainder of eligible construction costs would be dedicated to debt service on the Utility Revenue Bonds, as it is collected in the Impact Fee Fund. 93 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Bi-Annual Engineering Design Estimated Cost: $126,547 in FY12 & 136,873 in FY14 Project Number: Wastewater Operations – WW07 Date Scheduled: FY12 & FY14 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This item provides for design work to be completed every-other year, in anticipation of the Bi-Annual System Upgrades. We alternate funding of design work and construction work within the CIP. As the Wastewater Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-urgent projects may be identified and designed under this project heading. Alternatives Considered: Advantages of Approving this Project: Provides for design of necessary sewer system maintenance work. Estimated New Future Recurring Costs: None Funding Sources: 100% Wastewater Utility Fund 95 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Annual Wastewater Upgrades Estimated Cost: $800,000 in FY12 & $912,490 in FY14 Project Number: Wastewater Operations – WW08 Date Scheduled: FY12 & FY14 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This item provides for construction to be completed every-other year, after the Bi-Annual Engineering Design. We alternate funding of design work and construction work within the CIP. As the Wastewater Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-urgent projects may be identified, designed, and constructed under this project heading. Alternatives Considered: Advantages of Approving this Project: Provides for the construction of necessary sewer system maintenance work. Estimated New Future Recurring Costs: None. Funding Sources: 100% Wastewater Utility Fund 96 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Television Van Estimated Cost: $263,218 Project Number: Wastewater Operations – WW17 Date Scheduled: FY12 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: Replacement for the existing Sewer TV Van, routinely replaced every 5 years. Current Van purchased in FY07. This van should be equipped with all modifications to put into service for video inspecting our existing and newly constructed sewage collection infrastructure. The van will allow us to travel out of the sewer main and not only inspect the city’s portion of the service but the homeowner’s side and even into the structure itself. This is critical in identifying infiltration issues and helps identify homes that have sump pumps dumping into our system. This can be done from the street and service workers would not have to enter private residences to televise back out to the main. Alternatives Considered: To attempt to maintain our existing TV van, this is becoming obsolete and outdated with the present and upcoming technology. Advantages of Approving this Project: Provides for the timely replacement of critical maintenance equipment. Estimated New Future Recurring Costs: Annual Operating Costs: Annual Maintenance Costs: Total: Funding Sources: 100% Wastewater Utility Revenues - Approx. 5 year cost recover through TV Line Service Fee, currently 80 cents per foot inspected. 97 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Dump Truck Estimated Cost: $93,600 Project Number: Wastewater Operations – WW20 Date Scheduled: FY10 & FY14 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: FY10: Replaces current asset #1783, a 1995 Ford Dump Truck with over 23,172 miles on it. FY14: Replaces current asset #3157, a 2003 Sterling Dump Truck. These trucks could be used by the Street Department to haul snow. Alternatives Considered: Continue to use older vehicle which is becoming unreliable and costly to maintain. Advantages of Approving this Project: Increased reliability and safety for staff and water operations. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. Funding Sources: 100% Wastewater Fund 98 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Sewer Flusher Truck with TV capability Estimated Cost: $253,094 Project Number: Wastewater Operations – WW21 Date Scheduled: FY13 Purpose: □ New ■ Replacement □ Facility ■ Equipment Project Description: This vehicle replaces current asset #3031, a 2002 Freightliner with over 20,845 miles on it. This truck is used to flush over 200 miles of sewer main every year and is a critical piece of machinery for the sewer department. This unit will have a TV camera which will allow us to see objects/defects that cause the flusher to stop. This camera has become an industry standard piece of equipment. Alternatives Considered: Continue to use older vehicle which will be costly to maintain. Advantages of Approving this Project: Increased reliability and safety for staff and wastewater operations. Camera will eliminate need for follow up TV inspection by the TV van. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. Funding Sources: 100% Wastewater utility fund 99 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Insulation/heat for lower yard storage building Estimated Cost: $25,000 Total ($12,500 to each fund) Project Number: Wastewater Operations – WW22 Date Scheduled: FY10 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This work will convert our cold storage building into a heated storage area. Alternatives Considered: Continue to use older building which is over 50 years old which is becoming unreliable and costly to maintain. Advantages of Approving this Project: Larger area to keep vehicles and equipment in a heated area. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing building. Funding Sources: 50% Water Fund 50% Wastewater Fund 100 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Mini Excavator Estimated Cost: $50,000 Total ($25,000 to each fund) Project Number: Wastewater Operations - WW23 Date Scheduled: Unscheduled Purpose: ■ New □ Replacement □ Facility ■ Equipment Project Description: This piece of equipment due to it’s small size, is very useful in excavating where the backhoe cannot fit or due to it’s weight will damage sidewalks and lawns. Could be used by the Street Department for excavating storm sewers. Alternatives Considered: Continue to rent this piece of equipment. Advantages of Approving this Project: Give’s both the Water and Street Departments a piece of equipment that can work in small spaces Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than a normal size backhoe. Funding Sources: 50% Water Fund 50% Wastewater Fund 101 City of Bozeman Capital Improvements Plan FY10-14 Project Name: IBM i5 Replacement Estimated Cost: $90,000 Project Number: Date Scheduled: FY11 Purpose: □ New Replacement Facility • Equipment Project Description: Replacement of the mainframe computer that runs the City’s Enterprise- wide Financial software. This hardware needs to be replaced approximately every 5 years and was last replaced in FY2006. This item is critical to our ability to: • Bill and collect Water/Sewer/Garbage charges. • Bill and collect Street & Tree Assessments. • Receipt and track all other money owed/paid to the City. • Make payments to vendor’s doing business with the City. • Process payroll for City employees. • Create financial statements and reports. • Web-enables payments. Alternatives Considered: • Replace existing Enterprise-wide software with PC-based software. Brendan spoke with the County IT Director and received this info related to the County’s system: 1st year cost = $250,000 (installation, training, hardware) Thereafter, approximately $30,000 in annual maintenance costs, with a replacement $10,000 server being required every 5th year. • Continue to use current hardware for as long as possible. However, in addition to Financial Applications, the IBM server also hosts SunGard HTE applications for Building Permits, Code Enforcement, and Planning & Zoning. All these additional users and all this additional data are going to increasingly tax the servers resources to the point where system performance and customer service response time will probably be affected. Advantages of Approving this Project: Unnecessary system down-time is avoided when critical hardware is replaced in a timely fashion. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: No significant changes in system operations or maintenance costs are anticipated. Funding Sources: Water Fund: $15,000 Sewer Fund: $15,000 Solid Waste Fund: $15,000 General Fund: $45,000 Project Rating: 42 102 City of Bozeman Capital Improvements Plan FY10-14 Criteria Rating Notes This Project’s Score 1. Level of Service Up to 20 pts 20 - Corrects a health or safety hazard or prevents a critical breakdown of an existing city facility or equipment. 15 - Repairs, rehabilitates, or replaces physically deteriorated or functionally obsolete existing city facility or equipment. 10 - Brings an area up to the basic level of service as identified in an adopted city wide plan. 5 – Expands an approved City service. 0 – Other. 15 2. Operating Budget Impact Up to 10 pts 10 - Provides a significant decrease in city operating and/or maintenance expenses. 5 – Has a neutral or small impact on operating and/or maintenance expenses. 0 – Provides a significant increase in city operating requirements. 5 3. Service Area Up to 10 pts 10 – Direct Benefit to entire city. 5 – Direct benefit to roughly half city or indirect benefit to entire city. 2 – Direct benefit to small area of the city or indirect benefit to several areas. 7 4. Departmental Priority Up to 10 pts 10 – Critical to Department’s Mission 7 – High 3 – Moderate 0 – Questionable/Very Difficult to Complete 10 5. Commission Work Plan Up to 10 pts 10 – Identified project in Adopted Commission Work Plan 5 – Contributes to an indentified project in the Adopted Commission Work Plan. 0 – Not identified in Adopted Commission Work Plan. 0 6. Municipal Climate Protection (Municipal Climate Action Plan – MCAP) Up to 5 pts 5 – Is recommended by MCAP and will accomplish a stated MCAP goal. 3 – Will assist in meeting MCAP goal. 0 – No relation to MCAP. 0 7. Seasonal Use Up to 5 pts 5 – Year Round. 3 – Six to Eleven months per year. 1 – Five or fewer months per year. 5 TOTAL Up to 70 pts. 42 103 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Shops Complex – Phase I Estimated Cost: Total Cost Unknown. $1.5 Million improvements to benefit the Water Department operations in FY10. Project Number: Public Works – PW01 Date Scheduled: FY10 $1.5M Remainder FY11-14 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: This project consists of identifying a site (ideally, among currently owned City properties) for the phased construction and relocation of all City Shops facilities. The present shops complex is built in a residential neighborhood and it is estimated to have twice the employees working out of the complex than what it was designed for. The present complex has high traffic loads. With the public water fill station there, driving and walking in the complex is dangerous at high traffic periods. Over the past few years, a number of solutions to this issue have been pursued. The Cardinal Distributing property seemed an ideal long-term solution, but fell through due to Montana Rail Link’s refusal to lease land to the City. Because of the complexities of trying to find another suitable option for this large and diverse group of facilities, we are not able to quantify all of the costs or project phases at this time. Alternatives Considered: Build a smaller satellite facility for high traffic volume operations; leave low traffic operations at existing facility. Advantages of Approving this Project: Constructing the complex in phases will allow additional time to secure funding for other phases, lessen traffic at the current site, possibly relocate the existing water fill site, and free up space in the current complex to alleviate crowding for other divisions. Estimated New Recurring Costs: Annual Operating & Maintenance Costs: Unknown at this point. Funding Sources: Phase I = $1.5 Million Water Fund (Included in current rate study.) Other Phases = Wastewater Fund, Street Maintenance Fund, Forestry Fund, Solid Waste Fund, General Fund (Parks) The existing site (purchased by the General Fund) would be sold once the final phase of the project is completed. This could pay for some of the General Fund’s financial obligations for the project. 104 City of Bozeman Capital Improvements Plan FY10-14 Project Name: Laurel Glen Shops Annex Estimated Cost: $200,000.00 Project Number: Public Works – PW02 Date Scheduled: FY12 Purpose: □ New ■ Replacement ■ Facility □ Equipment Project Description: To upgrade current facility which is basically a pole barn with electricity to a facility which can house vehicles and personnel. This would include floor, paving, water/sewer services, offices, sidewalks. Alternatives Considered: Advantages of Approving this Project: Fuel savings in having vehicles stationed on the west side of the city, quicker response times to the surrounding area, frees up room at existing shop complex. Estimated New Future Recurring Costs: Annual Operating and Maintenance Costs: $5,000.00 to $6,000.00 Funding Sources: 50% Water Fund 50% Sewer Fund 105