HomeMy WebLinkAbout08- Western Industrial-Hilltop Tank Repainting Change OrderCHANGE ORDER
No.
DATE OF ISSUANCE 9/5/07 EFFECTIVE DATE ~~c~Lu.aC~-~ 7~;_.~1
OWNER City of Bozeman CONTRACTOR Western Industrial, Inc.
Contract: Hilltop Tank Repainting
Project: Hilltop Tank Repainting OWNER's Contract No.
ENGINEER Citv of Bozeman __ ENGINEER's Contract No.
You are directed to make the following changes in the Contract Documents:
Description: Reduce the lump sum Bid amount of Bid Item 1: Interior surface abrasive blasting, surface
preparation and disposal of blasted materials by a value of $1,000.00.
Reason for Change Order: To amend the contract price to allow an access panel to be cut in the tank.
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 305.000.00
Net Increase (Decrease) from previous Change
Orders No. 0 to 1
$ (1,000.00)
Contract Price prior to this Change Order:
$ 305.000.00
Net increase (decrease) of this Change Order:
$ (1 000.00)
Contract Price with all approved Change Orders:
$ 304 000.00
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion:
Ready for final payment:
(da s or dates
Net change from previous Change Orders No. _ to
No. _
Substantial Completion:
Ready for final payment:
da s
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
da s or dates
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready-for final payment:
(days or dates)
Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or
omitted items, any nature whatsoever, associated with the subject change order items, except as identified and set
forth her ~ an unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein
res t e 11 cost and value for the subject work perf ed a d the materials supplied under the terms of the
con ct d ~ t the work quantities and value were rop dete fined and are correct.
C (Authorized Signature) Da
COMMEN ED BY: AGAPR(DVED BY:
/0 9 0~ C..Jw~ G
(ENGINEE - Signature) ate O E (~thorized Signature) Dat
EJCDC 1910-8-B (1996 Edition
Prepared by the Engineers Joint Contract Documents Committee agd-entt6rsed by The Associated General Contractors of America and the
Construction Specifications Institute.
Page 1 of 2
CHANGE ORDER
INSTRUCTIONS
A. GENERAL INFORMATION
This document was developed to provide a uniform format for handling contract changes that affect Contract Price
or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a
subsequent Change Order if they affect Price or Times.
Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice
of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes.
If Milestones have. been listed in the Agreement, any effect of a Change Order thereon should be addressed.
For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a
Field Order should be used.
B. COMPLETING THE CHANGE ORDER FORM
Engineer normally initiates the form, including a description of the changes involved and attachments based upon
documents and proposals submitted by Contractor, or requests from Owner, or both.
Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval,
depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated
agreement for a previously performed change. After approval by one contracting party, all copies should be sent to
the other party for approval. Engineer should make distribution of executed copies after approval by both parties.
If a change only applies to price or to times, cross out the part of the tabulation that does not apply.
,. , ~ ,
Page 2 of 2