HomeMy WebLinkAboutResolution 4130 Approving Alteration/Modification of Contract with JTL Group, Inc.COMMISSION RESOLUTION N0.4130 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH JTL GROUP, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 31st day of May 2006, authorize award of the bid for the Durston Road 7`" to 19`" project, to JTL Group, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained in Change Order No. 4, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 29`" day of September 2008. KAAREN JACOBSON Mayor 166 HKM ENGINEERING INC. CHANGE ORDER TO: JTL Group Inc. d/b/a Knife River, Inc. 21730 Frontage Rd P.O. Box 9 Belgrade, MT 59714 Change Order No: 4 Date 9/10/2008 Project No.: Contract For: 02M229.129 Durston Road Reconstruction It has been determined necessary and in the best interest of the Owner to modify certain portions of the Project above and the Contract dated June 19 ,2006 and in accordance with the General Provisions. The following changes are hereby agreed to: DESCRIPTION: Drainage issues at 1613 Durston: regrade drainage swale and driveway as detailed in Work Directive #4. ATTACHMENT: (List Documents Supporting Change) ESTIMATE AND COST Note: The quantities shown are not guaranteed. Payment will be based on actual quantities used. ITEM QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT WD-4 1 LS Work Directive #4 $700.00 $700.00 Time (extension) 0 days Total Cost (increase) $700.00 Work Directive #4 dated 3/21/08 Knife River letter dated 5/15/08 H:\09\Master\change order4_9-10-08.x1s\Page1 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. By signing below each party agrees that this Change Order is a complete and equitable adjustment for all proposals or claims whatsoever arising out of, resulting from, and/or directly related to the above occurrences, revisions to the Contract, and/or this Change Order and hereby releases the others from all liability under this contract for further adjustments in Contract Price or Contract Time for said occurrences, revisions, and/or this supplemental agreement. The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (increased) by this Change Order The new Contract sum including this Change Order will be The Contract Time will be (increased) by The Date of Substantial Completion as of the date of this Change Order therefore is 31-May , 20 07 Contractor: Engineer: JTL Group, Inc. HKM Engineering Name Name gy; ~~S11,GV``~'1 ~ ~G~.~ Pv ~rc~ ~ /'. By: rr*~._-= pRaJ. r, Representative Title Rep es nt ve Title APPROVED: City of Bozeman OWNER By Representative Title Concurrence: GRANT AGENCY By: Representative NOTE: Fill all spaces. In not applicable, write N/A $ 2,306,869.95 $ 28,425.80 $ 2,335,295.75 $ 700.00 $ 2,335,995.75 Title H:\09\Master\change order4_9-10-08.x1s\Page2 HKM Engineering Inc. Work Directive No. 4 WORK CHANGE DIRECTIVE PROJECT: Durston Road Reconstruction North 7`~ Ave. to North 19`h Ave _ OWNER: ATTN: Bob Murray City of Bozeman Engineering Department 20 East Olive Bozeman. Mt 59715 CONTRACTOR: JTL Group Inc. 21730 Frontage Road P.O. Box 9 Belgrade, MT 59714 DATE OF ISSUANCE: March 21, 2008 OWNERS PROJECT NO ENGINEERS PROJECT NO. 02M229.129 ENGINEER: Zach Lowe, P.E. CONTRACT FOR: $2,306,869.95 You are directed to proceed promptly with the following change(s): Shape and seed a drainage swale on the west side of the driveway at 1613 Durston Rd., approximately 25 ft long, to perpetuate stormwater drainage. Attachments: (List documents supporting changes) Photo taken 3-19-08 If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a Change Order based thereon will involve one of the following methods of deteiminuig the effect of the change(s). Method of detenniiung change in Contract Price: Method of detemuning change in Contract Time: ^ Time and materials ^ Contractor's records ^ Unit Price ^ Engineer's records ^ Cost plus fixed fee ®Other N/A ® Other Luinp Sum Estimated increase in Contract Price: Estimated increase (decrease) in Contract $TBD Time: 0 days. If the change involves an increase, the estimate time is not to be exceeded without further authorization. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: AUTH ZED: C~ ~ By. ~i Engineer Owner Date H:\Temp\02M229129\Work Directives & Change Orders\WorkChangeDirective_#4.doc o2M229 . /2`1 ~~ AN MDU RESOURCES COMPANY 21T30 Frontage Road Belgrade, MT 59714 Mang Address P.O. Box 9 Belgrade, MT 59114 (406) 388-6832 (486) 3888347 FAX May 15, 2008 Zach Lowe P.E. /Ralph Gurney P.E. HKM Engineering Inc. 222 North 32°d Street, Suite 700 Billings, MT 59107 RE: Durston Road Reconstruction North 7`~ Avenue to North 19~' Avenue Zach/Ralph, Knife River-Belgrade Division offers the price of $700.00 to perform the drainage Swale shaping and seeding as described in your work directive. This pricing includes: • Mobilize men and equipment to jab site. • Excavate.and widen drainage Swale to improve drainage.- . • Seed drainage Swale with specified grass seed. • Perform minor grading on existing driveway to improve drainage towards Swale. ..Care and maintenance of the area is not included. If you have any questions please call me at 388-4035 extension 109. Sincerely, ~~ Steven R. Baeth Knife River -Belgrade. WE ARE AN EQUAL OPPORTUNITY EMPLOYER Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: Durston Road 7`h to 19"' Project MEETING DATE: 10/6/2008 RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign the change order. BACKGROUND: Attached is a copy, of change order number 4 for the above referenced project. The change order is to correct a drainage problem which was created by the project on one of the properties along the corridor. More specifically, it is to install a drainage swale to drain water which has been ponding in the driveway as a result of the construction. The change order increases the contract price by $700.00 and the contract time by 0 days. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. FISCAL EFFECTS: None ALTERNATIVES: Disapprove Respectfully submitted, Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Change Order 4 & Resolution 4130 Report compiled on 9/16/08 165