ADDENDUM #1
CITY OF BOZEMAN PHASE II LANDFILL CLOSURE PROJECT
DATE QF ADDENDUM;
BIDS DUE:
LOCATION TO DELIVER BIDS:
September 16, 2008
2:00 PM, September 22, 2008
City of Bozeman Clerk of Commission
City Hall
411 East Main Street
PO Box 1230
Bozeman, MT 59771
BID OPENING;
TQ ALL PI.ANHQLDER$:
2:00 PM, September 22, 20t)8
City Hall
411 East Main Street
Bozeman, Montana
This addendum shall serve to modify the plans and specifications far the City pf
Bozeman Phase II Landfill Closure Project as follows:
CONTRACT DOCUMENTS AND SPECIFICATIONS
1. Dvsign p, Specification 00200 - Instructions to Bidders, Articie 22 -.State
Laws and_R~gulations, Section 22.2, Clarification
Subcontractors shall be registered with the Montana DOLI in order to bid
this project- "Construction Contractors shall be registered in order to bid
this project. Registration shall be per Montana Code Annotated 39-9-2p1.
All Subcontractors whose por#ion of the work is aver $.2,500 wilE be
required to submit proof of registration with Department of Labor and
Industry (pQLI)."
2. Division 0, Specification 00300 -Bid Form
Bid Item #6 -- Reclaiming Borrow Area, completion of this bid item shall be
contingent under the City's direction. The City reserves the right to
eliminate this item should they elect to,
OCT-18-~0@'~ 13:53 GREAT WE5T ENGINEERING
Addendum #9
city of t3ozeman Phase f Landfill Closure
September 15, 2UU8
Paps ~ of 3
1 ~ir~6 4~9 8631 P.02r06
~~;;:`;
r Est
engineering
Should the Gity eliminate this bid item the Contractor will not be able to
renegotiate the contract under Article 11 of the General Conditions. This
bid item will be included in the total bid price and in the determination of
Award.
3. divisian 1 S ecification 0175 _ Measurement and F'a ment Sectian
3.1.8 and 3.1 .C Clarification
Bid Item #2 and Bid Item #3 shall be paid at the contract lump sum bid as
indicated in the Bid dorm. Plan sheets 2 and 3 show the area to be closed
during this project and show the area that has already been closed under
a previous phase of the project. Portions of the cell have been previously
closed which leaves an estimated amount of 11 acres remaining to be
closed within this project time. The Contractor is responsible for
determining all quantities associated with these two bid items. Plan
sheets 4 and b show crass sections of the closure area. The Contractor
shall utilize this information to determine quantities. The borrow area has
been designed for en adequate amount of material to complete this project
plus a reasonable shrink/swell factor.
4. Division 4 S ecification 0127'5 -Measurement and Pa ment Section
3.1.8, Addition
The fencing located on the top of the landfill cell shall be removed by the
Contractor and taken to the scrap metal pile at the end of the compost
area. This cast far this item shall be included under Bid Item #~.
5. divisian 1 ~Specificatian_0,1275 -Measurement and Payment, Sectian
3.1.G, Addition
Install erosion control rolls around the perimeter of the barrow area. This
item shall be paid an a unit price basis under Bid item #7. Refer to the
SWPP plan in Appendix A,
6. Division 2 S ecificatian 02300 -Earthwork Section 3.$.C Clarification
The owner and Engineer acknowledge that the Phase II Closure project is
located on a Sanitary Landfill. Therefore, the Contractor is not responsible
for settling of the closure cap past the end of the contract time.
^GT-18-28L~'~ 13 53 GREAT WEST ENGINEERING
Addendum #1
City of Bozeman Phase I Landfill Glosures
September i B, 2QA8
Page 3 of 3
7. Dust CantroL•
1 485 449 8Ei31 P.83f86
~~
engineering
The contractor shall be responsible far dust control using a water truck.
The city will provide free water through a city fire hydrant located an
Caddy Court.
ACKN+aWLEdGMENT OF ADDENbUM #1
All fJidders Shall acknowledge receipt of Addendum #1 in the Bid_ Any Bid in
which all issued addenda are not acknowledged may be considered incomplete.
Sincerely,
Great West Engineering, Inc.
a ert Chur P
Principal
Enclosures
Plan holders List - 2 pages
Pre-Bid Conference Sign-In Sheet
OCT-18-2007 13 53
GRERT WEST ENGINEERING
V~ 11[.1.
engir~',~g
Name
~+I~ ~~ BOZ~1'17~n
Phase ,~ Landfill Closure
Pre-Bid Conference
September 15, 2008
Sign~l~ Sheet
~--~J ~/P~'L.Y
~~ c' ~ ~~ 5~~~ ~~,~,
~ ~~~~ ~
~~ .
1 406 449 8631 P.04f06
Tale hone
~~~ ~
~~- ~ ~ ,~~
p ~ M~
~Qrr 2.~'3_~~
I~
~.~~,r~3
~`,. ~2//
~.~-~ .27
r
OCT--18-2007 13 54 GREAT WEST ENGINEERING
PLANHOLdERS LrsT
CITY OF BOZEMAN
LANDFILL PRAISE 2 CLOSURE
SEPTEMBER 22, 2008
City of Bozeman
PD Box 1230
Bozeman, MT 59771
Phone: 406-5$2-2300
Fax: 406-5$2-2302
Billings Builders Exchange
2050 Breadwater Ave, Suite A
l3iliings MT 59702
Phone: 406-652-1311
Fax: 406-fi52-9391
Bozeman Plan Exchange
1105 Reeves Rd. West, Suite $00
Bozeman, MT 5977$
Phone:406-5$6-7653
Fax: 406-5$6-4052
Great Falls Builders Exchange
202 2"d Avenue South
Great Falls MT 59405
Phone: 406-453-2513
Fax: 406-727-7548
Butte Builders Exchange
PQ Bax 47$6
Butte. MT 59702
Phone: 406-782-5433
Fax: 406-782-5433
Montana Contractors Association
PQ Box 451 ~
Helena, MT 59604
Phone: 406-442-4162
Fax: 40fi-449-3199
Shumaker Trucking $ Excavating
PO Bpx 1279
Great Falls, MT 59403
Phone: 406-727-3537
Fax: 406-727-9995
1 406 449 8631 P.05i06
Delhur Industries, InG.
30607 Oldfield Street
Hermiston, OR 97$3$
Phane:541-567-8693
Fax: 866-570-7269
21 Construction, Inc.
PG Box 1288
Malta, MT 59538-12$8
Phone: 406-654-9 203
Fax: 406-654-1206
Trapper Peak Construction, Inc.
PQ Box 7 $4
Willow Creek, MT 59760
Phone:405-699-05p0
Fax: 408-285-4614
M.A. f~eatley Gonstrua#ion
$29 Evans Raad
PO Box 49p
Clarkston, WA 99403
Phone: 509-751-1580
Fax: 509-759 -1922
Toomar Construction, Inc.
698 IV. 3500 East
Menan, Ip $3434
Phone:20$-754-4660
Fax: 208-754$638
A.M. Welfes, Inc.
105 Sterling Raad
Norris, MT 59745
Phone: 406-fi$5-3372
Fax: 4t?6-6$5-3270
Bozeman Sand and Gravel
PO Box 1327
Bozeman, MT 59711
Phoney 406-586-227 7
Fax: 406-5$B-$$$7
Rage 1
OCT-18-2007 13:54 GREAT WE5T ENGINEERIh1G 1 406 4d9 8631 P.06f06
PLANH~LDERS LIST
CITY OF BCZEMAN
LANDFILL PHASE 2 CLOSURE
SEI~TEMBER 22, 2Cl08
Pumco, Inc.
PD (3cx 700
Lolo, MT 59847
Phone:406-273-2811
Fax: 406-273-2$24
Montana Civi! Garrtractors
PD Box 1019
Belgrade, MT 59714
Phone: 406-3$$-1740
Fax: 406-388-5105
Advanced Earthworks, Inc.
1659 North First Street, Suite #13
Hamilton, MT 59840
Phone: 406-375-8500
Fsx: 406-375-8501