Loading...
HomeMy WebLinkAbout08- Contract between City and CompuSource, Inc./NC. Voice & Data Cabling Professionals 411 East Birch Street • Bozeman, Montana 59715 Office: (406) 587-1616; After Hours: [406) 587-3810 web: www.compusourcenow.cam February 26, 2008 Brendan Steele City of Bozeman 20 East Olive Bozeman, MT 59715 Dear Brendan Below are the details of our contract between the City of Bozeman and CompuSource, roc. which includes: + installation of all Data Angled Fatch Panels on Equipment Racks in the MDF and IDF. • Installation of (2) MM 62.5 riser indoor 6 strand Fiber Backbone in 1"Innerduct all terminated in a fiber enclosure and certified. Total $4,964.00 • Installation of Genspeed 6000 Blue Riser Data Cat 6 Cable to 2001ocations 2 Cables per location with l O locations that have 4 cables as specified on the blue prints and by the City of Bozeman. Total 39,077.00, 180.00 per location • Installation, termination and labeling all faceplates and jacks using Panduit Salutions® products and terminations of the Angled Fatch Panels in the MDF and the rDF. Certification Testing of all data connections (with a Fluke DTX-1$00 cable analyzer) to Panduit Network System's Certification Plus 25 Year Warranty. 10 Locations for one single run of RG-6 Coax terminated at work area outlet only. @ $100.00 per coax cable. This is included in the final price. • Total price for all copper, fiber, bonding and insurance $45,241.00 • CompuSource, Inc. Will review the architectural drawings to verify the location of all the drops, and verify the conduit sizes for all trunk line locations that will be installed by the project electrician, to make sure that they are sized adequately for their cabling needs. + Additional cable drops can be added or deleted at the direction of the City of Bozeman at the price specified in this contract. • The schedule for all work to be accomplished will be coordinated with the Construction Manager for the project, Dick Anderson Construction. • The addendum to this contract lists all bonding and insurance requirements for this project. • Start Date of Feb 27 to September 1 2008 Thank you for letting CompuSource work on your project. We look for ward to working with you in the future. If you have any questions please give us a call at 406-587-1616 -, Ci of Bozeman CompuSource, loc. %~~ ty Curt Porteus ~ , A f Chris Kukulski Providing Yaur Total Cabling Needs... For That Prafessianal Step Into Tomorrow!