Loading...
HomeMy WebLinkAboutNotice of Award for 2008 Curbing and Sidewalk Improvements to Knife River Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Chris Kukulski, City Manager SUBJECT: 2008 Curbing and Sidewalk Impravements -Contract Award MEETING DATE: May l9, 2008 (Consent Agenda) RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2008 Curbing and Sidewalk Impravements, Schedules 1 and 2, to Knife River, Inc. in the amount of $ l 08,179.85. BACKGROUND: Bids were opened May 13, 2008, far the 2008 Curbing and Sidewalk Improvement project. The project consists of curb replacement in the 600 and 700 blocks of S. 9t" Avenue and in the 800 block of W. Alderson Street. A good portion of the curb replacement will be adjacent to Irving School, and new ADA ramps will be installed at the intersections of College and 9t", Alderson and 9t", and Dickerson and 9~". In addition, the work includes installation of sidewalks along vacant Tats in Bridger Creek Subdivision Phase 3 (St. Andrews Drive, Turnberry Court, and Caddie Court). A condition of plat approval was that all sidewalks shall be installed within three years of plat recordation, which was April 2000. The 1-Iomeowners Association requested that we enforce this condition. Letters were sent in December of 2006 to all property owners of vacant lots advising them that they needed to get the sidewalks installed by October 2007 or the sidewalks would be installed for them at their expense. Ten out of the 38 lots remain without sidewalks. Four bids were received, with the low bidder being Knife River, Inc. of Belgrade, MT in the amount of $105,179.85, Total Base Bid. The bids appear to be competitive with the low bid being approximately 26% below the construction estimate ($143,750.37). A copy of the Certified Bid Tabulation is attached. FISCAL EFFECTS: The work has been broken into two schedules. Schedule 1 is for installation of sidewalks in Bridger Creek Subdivision Phase 3, with a base bid amount of $26,604.60. The cost of this work would be billed back to the property owners. Schedule 2 is for the curb replacement work, with a base bid amount of $78,575.25. Funding for this work would be from the Gas Tax Fund. ALTERNATIVES: Respectfully submitted, As suggested by the City Commission. -, Andrew Kerr, Engineering Assistant Chris A. I~ukulski, City Manager Attachments: Bid Tabulation Notice nfAward (3) Report compiled on May 14, 2008 Cc: Debbie Arkell, Dir. of Public Service John VanDelinder, Street Superintendent Rick Hixson, City Engineer NOTICE OF AWARD P II Dated: {`~~~~ E ~6 G~ TO: Knife River - Be_Igrade ADDRESS: P.O. Box 9, Belgrade, MT 59714 PROJECT: City of Bozeman 2008 Curbing and Sidewalk Improvements Schedules 1 and 2 CONTRACT FOR: Installation of new concrete sidewalks, and replacement of concrete curbing.. and drive approaches. You are notified that your Bid dated Ma 13 2008, for the above Contract has been considered. Yau are the apparent Successful Bidder and have been awarded a Contract for installation of new concrete sidewalks, and replacement of concrete curbing and drive approaches The Contract Price of your Contract is: one hundred five thousand one hundred seventy nine and 85!100 Dollars ($105,179.85}. Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by _____ You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (page 8), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.02). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5.03}. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Cmtract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: BY: -~ ~. (CITYpMJANAGEF~ Q (CITY K) DATE; 1" ` p BID TAB SHEET FOR 24Q8 CURBING AND SIDEWALK IMPROVEMENTS NAME ~c ADDRESS REG # BTD SECURITY ADDENDUM #t ACKNOWLEDGED 5CT3EDULE #1 BASE BTD SCHEDULE #2 BASE BTD TOTAL BASE B1D Knife Riper 1{1(}89 10 ".o yes $2b,604.60 $78,575.25 $ ] 05.179.85 PO Box 9 Belgrade MT 59714 Gallatin Asphalt 106Q4 10 °fn yes $34,861.20 $75,839.00 $114,7[}0.20 fi4G5 Rrver Rd Bozeman, MT 597 f 8 Duneman Construction, inc. 151842 10 % Yes $34,754.00 $94,448.35 $134, 202.35 8670 Trooper Trail Bozeman, MT 59715 Castlerock Concrete 70 Roc]c Rd Belgratltle, MT 59714 154944 10 °la yes $33, 638.04 $1Qi,817.OQ $135,455.00 Engineer's Estimate $38.225.04 $105,525.37 $143,750.37 These bids were opened and read before the undersigned at 2:00 p.m. on May 13. 2008. Andrew S. Kerr Engineering Assistant ~~ Stacy linen City Clerk ` ~.~r~ Cynthia Jordan Delaney Deputy City Clerk