Loading...
HomeMy WebLinkAboutBid Tab Sheet for 2008 Curbing and Sidewalk ImprovementsBID TAB SHEET FOR 2008 CURBING AND SIDEWALK IMPROVEMENTS NAME & ADDRESS REG # B1D SECURITY ADDENDUM #I SCHEDULE #1 SCHEDULE #2 TOTAL BASE BID BASE BID BASE BID ACKNOWLEDGED yes $26,604.60 $78,575.25 $105,179.85 Knife River 10089 10 % PO Boy 9 Belgrade MT 59714 yes $34,861.20 $75,839.00 $110,700.20 Gallatin Asphalt 30604 10°.o b465 River Rd Bozeman, MT 59718 Duneman Construction, Inc. 1.51842 10 % yes $39,754.00 $94,448.35 $134, 202.35 8670 Trooper Trail Bozeman. MT 59715 Castlerock Concrete 154944 10 •'o yes $33, 63$.00 $135,455.00 70 Roc Rd Belgra e, MT 59714 $101,817.00 Engineer's Estimate $38,225.00 $105,525.37 $143,750.37 These bids were opened and read before the undersigned at 2:00 p.m. on May 13, 2008. Andrew S. Kerr Engineering Assistant ~l Stacy lmen City Clerk Cynthia Jordan Delane~~ Deputy City Clerk