Loading...
HomeMy WebLinkAboutResolution 4088 Approving Modification of Contract with Dick Anderson Construction COMMISSION RESOLUTION NO. 4088 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING AL TERATIONfMODIFICA TION OF CONTRACT WITH DICK ANDERSON CONSTRUCTION, INC., HELENA, MONTANA. WHEREAS, the City Commission did, on the 6th day of August 2007, authorize award of the bid for the WWTP Phase I Early Out project, to Dick Anderson Construction, Inc., Helena, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Dick Anderson Construction, Inc., as contained in Change Order No.1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 17th day of December 2007. -~f~(r~ J Y. U S Mayor ATTEST: ST~ City Clerk . CHANGE ORDER No. ONE (1) E~;-~~~~~E DATE15~-~ev I ~m. -;iCTO? CONTRACTOR Dick Anderson Construction. Inc. OWNER's Contract No. 00...52713 ENGINEER's Contract No. 2105.049 DATE OF ISSUANCE November 29.2007 Owner City of Bozeman. MT Contract: Water Reclamation Facilitv (WRF) Project: Bozeman WRF Phase 1 Earlv Out Improvements ENGINEER Morrison-Maierle. Inc. --,.."-,~"..,,,,~. '~ You are directed-to makCthe following changes in the Contract Documents: Description: Rcplacc the WRF existing Aeration Basin No. I Sluice Gate Cover with a Waterman Industries 48" x 36" heavy duty Sluice Gate, including existing cover removal and disposal, new gate cover complete and installed, and all labor, materials, overhead and profit. Reason for Change Order: Existing Aeration Basin No.1 Sluice Gate Cover was discovered to be severely cracked. The Owner wants to repair the gate for plant operations, maintenance and safety purposes. Attachments: Contractor's cost breakdown including materials, labor, overhead and profit. I CHANGE TN CONTRACT PRICE: I Original Contract Price $ 49,794.01 Net Increase/Decrease from previous Change Orders: $ -0- Contract Price prior to this Change Order: $ 49,794.0] Net increase of this Change Order: $ 16,250.00 Contract Pricc with all approved Change Orders: $ __~044.cQL._ I CHANGE IN CONTRACT TIMES: I Original Contract Times: Substantial Completion: N/A Ready for final payment: 145 (calendar days) Net change from previous Change Orders: Substantial Completion: 0 Ready for final payment: 0 .-- (calendar days) Contract Times prior to this Change Order: Substantial Completion: N/A Ready for final payment: 145 (calendar days) Net increase this Change Order: Substantial Completion: N/A Ready for final payment: 7 ( calendar days) Contract Times with all approved Change Orders: Substantial Completion: N/A Ready for final payment: 152 (calendar days) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that rk uan' es and value were properly determined and are correct. 1~~/07 Dat RECOMMENDED BY: ~.. - (EN INEER - Signature) EJCDC 1910-8-B (1996 Edition) Prepared by the Engineers loint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. /,'-)..~ -07 Date . APPROVE~ C~A ' OWNER (Authorized Signature) I ~ 1 \ 8' /0 7 Date ' N:\2105\049\DOCS\Construction\Change Orders & WCD\Change Order #1 Docs & Trans.doc