Loading...
HomeMy WebLinkAboutResolution 2405 Establishing revised Landfill Fee Schedule ~~- ...... ~')P.... ,. COMMISSION RESOLUTION NO. 2405 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN. MONT ANA, ESTABLISHING A REVISED LANDFILL FEE SCHEDULE FOR USERS OF THE CITY OF BOZEMAN'S LANDFILL. WHEREAS, the City Commission passed Resolution No. 2403, on July 6, 1982, declaring it to be the intention of the City of Bozeman. Montana, to establish a revised landfill fee schedule for users of the City of Bozeman's landfill; and WHEREAS, the City Commission did on the 19th day of July 1982 conduct a public hearing on Commission Resolution No. 2403; and WHEREAS, a fair and equitable operation of the enterprise fund requires user fees to be paid by the recipients of the benefit of landfill use; and WI-IEREA S, the Commission recognizes the need for integrated, effective management of the garbage and landfill operation, which operation is currently being developed by the staff; and WHEREAS, the Commission also recognizes the need for interim gate fees until such study is finalized; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOZEMA N, MONT AN A: That the following schedule of landfill fees is hereby established, with the intent of future revision and possible increase, as cost analyses are finalized by City staff: LANDFILL GATE FEES Load Size Dollars Yard Passenger cars $4.50 Pickups--base rate for liquid box level plus $.75/yard for excess Pickup base rates: 1/ 2 ton and smaller 1/2-3/4 ton 1-2 ton 2 ton and over 4.50 4.50 15.00 25.00 4.50 4.50 5.00 5.00 Large tree stumps, trunks l7.00/ea. Dead Animals Small (sheep, goats, pigs, calves, etc.) 5.00 - -:-~.....~ ~- ---- --.' --' ,.~" .~ ,- ....' ~ ~ "f!r' . Large (cows, horses, all over 400 lbs.) 7.50 Demoli tion 15-19 cubic yards $2.50 to $2.50 $7.50 7.50 to 2.50 12.50 15.00 to 2.50 25.00 27.50 to 2.50 35.00 37.50 to 2.50 47.50 50.00 to 2.50 62.50 65.00 on 2.50 down Pickups 3-5 cubic yards 6-10 cubic yards 11-14 cubic yards 20-25 cubic yards 26 plus (Estimate fee and pay in advance at Building Inspection Office--Carnegie Building.) Tires 20-yd. packed garbage 30-yd. packed garbage 20-yd. loose garbage 30-yd. loose garbage 10.00 25.00 30.00 r .. 25.00 1. 25 37.50 1. 25 15.00 .75 22.50 .75 1/2-3/4 ton truck 1-2 1 /2 ton truck 2 1/2 ton and over Commercial Fees The above schedule of fees shall become effective on the 1st day of September 1982. PASSED AND ADOPTED by the City Commission of the City of Bozeman, at a regular meeting of the City Commissi~n, held on the 26th day of July 1982. / / .- /" ATTEST: /J ~ J1 <) ,,~ ' :; 1 I"' .. (t!o:~i~ ,-t vU:!/L'ZlYL/ ROBIN L. SULLIVAN Clerk of the Commission . - 2 -