Loading...
HomeMy WebLinkAboutAward Letter for Base Bid for Construction of the Bozeman Intermodal Facility to Martel Construction Bozeman b1Itd All-AmerIca City , 1111.' 2001 office of the City Commission Mayor Jeff Krauss COmmissioners Sean Becker Kaaran Jacobson Steve Kirchhoff Jeff Rupp CITY OF BOZEMAN 411 East Main Street P.O. Box 1230 Bozeman, MT 59771 Phone: (406) 582-2300 Fax: (406) 582-2323 TDD: (406) 582-2301 www.bozeman.net July 18, 2007 Martel Construction c/o Tony Martel 1203 South Church Avenue Bozeman, MT 59715 Dear Mr. Martel: At its meeting held on July 16,2007, the Bozeman City Commission awarded Martel Construction the Base Bid for the construction of the Bozeman lntermodal Facility. Please refer to the attached June 11, 2007 Bid Day Summary Sheet for the Base Bid totals. Please contact Anna Rosenberry, Finance Director, at 582-2325 if you have any further questions. Bid Packages Bid Day Bid Day Bid Day Trade Contractor Base Bid Alternate 1 Alternate 2 General Requirements 1A General Requirements, Bonds & GIL Insurance 456,872 94,000 0 Martel 456,872 Site Work 2A & 2B Site Clearing, Building Earthwork & Site Utilities 717,780 0 0 Walker 2C Site Concrete 116,688 0 0 JTL 2D Trees & Irrigation - ALLOWANCE 0 0 i 2E Asphalt Paving 56,886 0 0 Gallatin Asphalt 2F Traffic Control Plan, Signage Etc. 198,366 0 0 Montana Lines Concrete Work 3A Concrete Work 3,080,000 673,000 0 Martel Masonry 4A Masonry 835,000 196,051 4,560 Anderson Metals 5A Supply Steel Package 472,175 44,000 0 Martel (Steel West) 5B Install Steel Package 234,000 35,000 0 Martel (Struct. Sys ) Carpentry 6A Supply & Install Finish Carpentry & Casework 6,000 0 0 Martel (Stahl) Thermal & Moisture 7A Metal Wall & Soffit Panels 94,215 0 0 Tri-Jack 7B & 7C EPDM Roofin9 I Sheet Metal Flashing & Trim 107,398 0 0 Missoula Sheet Mtl. 7D Joint Sealants 26,000 5,000 0 Martel (Rollinger) Doors, Frames & Hardware 8A Supply & Install Doors, Frames, Hardware 49,000 11,000 0 Martel (Kalmont) 8B Aluminum Storefronts & Glass & Glazing 191,200 30,965 0 Valley Glass Finishes 9A Metal Studs, Insulation, Carpentry, Drywall, Tape & Finish 244,630 28,480 0 Martel (wi subs) 9B Acoustical Panel Ceilings 3,000 0 0 Martel (Empire) 9C Resilient Wall Base 600 0 0 Rich's 9D Painting 59,928 15,225 0 T & L Painting Specialties 10A Supply & Install Division 10 Specialties 1,500 0 0 Martel (wi suppliers) Parking Control Equipment Supply & Install Parking Control Equipment by Owner by Owner Hoisting 14A Hydraulic Elevators 160,000 24,788 1,227 Gallatin Elevator 100,000 Mechanical Complete 15A Mechanical - Plumbing, HVAC & Fire Protection 461,000 12,000 0 Williams P & H 629,910 Electrical 16A Electrical, Fire Alarm & Communication Complete 573,000 47,393 0 Valley Electric 535,950 Bozeman Intermodal Facility June 11, 2007 Martel Construction, Inc. Bid Dav Summary Page 1 of 2 BO:l:eman Intermodal Facility June 11, 2007 Martel Construction, Inc. Bid Dav Summary Bid Packages Bid Day Bid Day Bid Day Trade Contractor Base Bid Alternate 1 Alternate 2 Total Bid Packages 8,160,238 1,216,902 5,787 Construction Indirect Costs Construction Management Services (6% base, 4.5% Alt.) 489,614 54,761 260 Paid Direct by The City of Bozeman Building Permits 40.453 Impact Fees 172,709 Commissioning ~ if Required 0 Material Testing 0 Builders Risk 9,584 Utility Line Relocation - Allowance 200,000 Parking Control Equipment - Allowance 135,328 Subtotal 558,074 Total Indirect Costs 1,047,688 54,761 260 Total Construction Costs & Indirect Costs 9,207,926 1,271,663 6,047 Construction Contingency - James to Administer 50,000 20,000 0 Total Project Cost 9,257,926 1,291,663 6,047 Source of Funds Federal Award - Direct 1,901,339 Federal Award - GANS (net of interest cost) 1,971,105 TIF BONDS 4,800,000 Interest Earnin9s During Construction 130,000 TIF CASH 460,000 Sale of Retail 1,291,663 6,047 TOTAL FUNDS AVAILABLE 9262,444 1,291,663 6047 Difference between Costs & Funds Available 4,518 0 (0) Page 2 of 2