Loading...
HomeMy WebLinkAbout07- Amendment No. 2 to Professional Services Agreement for Water Renovations Survey Project, 2007 AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT FOR WATER RENOV A TIONS SURVEY PROJECT MMI. No. 417.052 THIS IS AN AGREEMENT made as of I~ ,2007, between THE CITY OF BOZEMAN, a Municipal Corporation P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771- 1113 (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated April 17, 2006, including Amendment No.1 dated January 8,2007, herein referred to as the Original Agreement, for professional engineering services for the Water Renovations Survey Project; and WHEREAS, the parties desire to amend provisions of the Original Agreement to add additional areas to the project. NOW, THEREFORE, IN CONSIDERA nON OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT D-2 (AMENDMENT NO.2) - ENGINEERING FEE ESTIMATE OF ADDITIONAL STREETS TO SURVEY, are hereby incorporated in and made part of this Agreement. Article 6 - Compensation For Em!ineerin!! Service Article 6.1 of the original agreement is replaced with the following: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under section 4.2 of this agreement pay a total sum in the amount of $ 119.754.00 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (section 4.2) shall not exceed the following ceilings: $ 119,754.00 (100 % of design fee) until the survey has been submitted to the OWNER. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the 1 ". EXHIBIT 0-2 (Amendment No.2). Engineering Fee E.\imate Of Addilional Streets 10Su'vey WATER RENOVATIONS FIELD SURVEY. PRELIMINARY SCOPE OF SERVICES STAFF HOUR ESTIMATE TASK TOTAL HOURS SUPERVISING SR SURVEY ENGINEER I MANAGER suRVEY MANAGER CAPP DRAFTER SURVEY CRSW CLERICAl. PrQject #17 Hr.:rizonlrll Cor:lmi in Fitlld " G East Lamme. Rouse to Grand VM~~a! c....ontr'cl irl l"jcl/J 4 4 (Docs 1101 i~c;I\ldo Trar.;y to eIW,:\I.\ O!tl(:c Conlr)uti:1\1on~ 4 4 r0(.111graphif; SlIrvl'Y 48 4" Ollit€l CO!!lpUtCllioI15 anu Dr<tftul9 1 ;~ 12 FII~!d V!~rllll::;)ll"r"1~ 4 4 Pr(.lil~I~1 M"Il<lQcm(~nt <.Ir'K.'j c..:Ollldln<.it\l'.ll. 1 1 SUBTOTAL i)r S 1 Mf:' ~"OUns nFc)UII.~Fi,O 00 1 \ 4 . 1.! 50 HOI.JnI..Y \..AtlnH COST $1:~(J $1;':0 $.!l(J $60 $1~~O $43 L.ABOR. COST BY :.1r)SI1ION $'30 $600 $.\20 $?~O $6,960 TOTAL LABOR: S8,730 TOTAL EXPENSES $2, 1 G7 TI:~:hnDIo~IY Ghar\ji:!, SIJIYf:IY t:QUlPri'l'lnl i:'~'IIj Mi()cl~llIanl:IOUS 1;)~Pl'tn()e~ TOTAL COST OF PHASE, $10,897 rolecl "'18 H<:J!.i7.orll::11 i'~onlml ir! !..ifJld ,. lEast Lammo . Grand to Fifth VI);lH~II.!VII\lr011l1 FI<')i\.1 .. 2 01111:11 t....nmpl)t~~ll(H\~; 0 , TClpCl(:JI'::'Iphic t:;I~r\'r:y 74 24 ottlr:-.e ("llf1Ptlt:UiOf):J. :il.r\1 Dr::\ttil'\(J 4 1 ril~ld V~rI'l(;i~llol'~, < < PrOlec.t Manag~m~nl P.oM COQrdination " I 1 ;.;~jfn()'JA! OF STAFF HOURS REQUIRED '" I 0 < 1 28 H"oTJRTv",[A'BOR COST $1:,0 'il12f: ",," $90 ............."$l2'0--.--.-.."$".---- LABOR COST BY POSITION $130 5360 $'60 $240 $3.360 TOTAL LABOR: $4,250 TOTAL EXPENSES $1.046 1 tfChllol(l\W (;Mrge: SUflley F.ql)ipmp,nt and Mi!icellaneous Expenses TOTAL COST OF PHASE; $..2.6 TOTALS Project #17 cllSt Lammo . RoUse to GmM $10,097 Project #18 cost Lilll'Ime . Grtlhd 10 Firth $5,296 TOTAL SERVICES $16,192 , I time of billing, subject to any limitations on Payments based on completion of tasks or specific retain age requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.2) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONT ANA MORRISON-MAIERLE,INC. By~kX~~' (City Manager) 5" /1~/o-:r ~ DATE: DATE: ~~(\: \ zt.( Z~1 I --- ----- '"- '. B . (City Clei~L _ . - _ ---..._~---- ~ r . .... -- .-"J~ .~ ~ ATTEST: 2