Loading...
HomeMy WebLinkAbout06- Agreement - Alternate Street Design, roundabout proposal J.... Alternate Street DesiQn. P.A. ~ ". 1516 Plainfield Avenue, Orange Park, Florida 32073-3925 904-289-1851, Fax 904-278-4996, Emall: mJwaltwork@comcast.net November 30, 2006 Mr. RIchard Hixson, P.E. City Engineer City of Bozeman P.O. Box 1230, Bozeman, MT 59771-1230 RE: South Willson Ave./CoUege Street, City of Bozeman, Montana Dear Mr. Hixon. Alternate Street Design, P.A. is pleased to submit thIS proposal to prepare a conceptual plan and comments on the use of a roundabout at the above Intersection. SCOPE OF SERVICES 1. Undertake a capacIty analysis 2. Prepare a conceptual layout for a roundabout that meets the design vehicles specified by the Montana Department of TransportatIOn. MATERIALS TO BE PROVIDED I Peak hour fully directional traffic counts. 2. An aerIal photo to scale within AutoCAD. DELIVERABLES I. A short report that Includes a summary of the analysIs, and commentary on use of a roundabout at this intersectIon. 2. A PDF file shOWIng an alternate roundabout layout. PROFESSIONAL FEES: Fee..................................... ................................................................................................................................... $1,200.00 If the above scope of work and fees meet WIth your approval, please indicate your acceptance of thIS agreement by printIng two copIes, sIgning in the space provided and returnIng one copy to thIS office for our records. Sincerely, ;r~:n:J MIchael 1. Wallwork. P.E. President T~~ ~. Signature - 11/;(1),6 Date . -g. ( Coil: l-kx,SQ ,J Name (typed or printed) C) Tj &..NGr(N'W-- Crry of- 8o~.fJoJ Title Organization