HomeMy WebLinkAbout10-28-26 Public Comment - E. Johnson - A connected Gallatin ValleyFrom:Ethan Johnson
To:Bozeman Public Comment
Subject:[EXTERNAL]A connected Gallatin Valley
Date:Wednesday, October 28, 2026 1:19:54 PM
Attachments:Gallatin Valley - Three Page MPO Pitch.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Greetings Gallatin Valley MPO committee,
My name is Ethan Giles, and I would like to first thank you for allowing me the chance tospeak breifly. I am certain that Gallatin Valley would only find value and sustained ridership if
this idea takes root. I do not ask for any action as of now, but a feasibility report would be thenext logical step if this plan is taken into serious consideration. I truly think that such a visual
and available and reliable transportation option would only create a more widely accessibleand connected Gallatin Valley. The map here is only a place holder, as a better route could be
found connecting the University and perhaps further down main.
Workers getting to Bozeman from Belgrade, students exploring their space and getting to jobsand opportunities, people who have to pay for gas constantly, new businesses that would
benefit from a higher pedestrian count, getting to school, arriving at the airport and havingeasy access to the town, opening up economic flow around the Gallatin Valley, cut down on
drinking and driving, allowing people to connect with each other rather than passing by in ourcars without ever having a chance at a conversation, offering businesses a new space to
advertise, and the visual of the bobcat as cars pass by on the highway; all these things I believewould be positively influenced by such a dedicated system.
REGIONAL MOBILITY / FEASIBILITY CONCEPT
CONNECTING THE GALLATIN VALLEY
BELGRADE / BZN AIRPORT / BOZEMAN
THE IDEA Evaluate a single-track regional tram corridor via Bozeman Yellowstone International Airport, with a possible Bozeman
urban circuit and Streamline bus connections. The concept would use no more than two operating trams; final alignment and
service are not determined.
128,740
GALLATIN COUNTY RESIDENTS
2025 estimate [1]
3.00M
AIRPORT PASSENGER MOVEMENTS
12 months to Sept. 2026 [2]
17,477
MONTANA STATE STUDENTS
Fall 2026 [3]
CORRIDOR TO BE STUDIED
BELGRADE BZN AIRPORT N. BOZEMAN DOWNTOWN
Regional shuttle / airport stop + urban circulator or through-service to test + Streamline feeders
POTENTIAL PUBLIC BENEFITS WHAT FEASIBILITY MUST PROVE
01 Workforce and education access
More reliable trips between housing, jobs, MSU and
regional employers, especially for people without a car.
02 Household transportation savings
Potential to reduce fuel, parking and vehicle dependence;
test actual costs and travel-time competitiveness.
03 Airport and visitor economy
Connect visitors and residents to downtown and onward
regional shuttles without requiring every trip to start in a
car.
04 Walkable business districts
Stations and safe pedestrian links could support visits to
Main Street shops, restaurants and services; measure
footfall impacts.
05 A connected transit network
Use fare-free Streamline as a complement and feeder;
evaluate future Four Corners and MSU links separately.
RIDERSHIP + SERVICE
Forecast workers, visitors and local trips; compare travel times
and real demand with existing transit.
TWO-TRAM OPERATIONS
Model hourly service, single-track signaling, passing sidings,
transfer times and recovery from delays.
LAND + SAFETY
Survey route and airport access; inspect utilities, crossings,
highway exposure, winter conditions and emergency access.
COST + VALUE
Estimate construction, annual operations, maintenance, subsidy
and funding; compare improved buses and BRT.
Reality check: Single track limits passing and two active vehicles
provide no spare. Rail may involve very substantial capital costs;
nothing here is a validated construction or ridership estimate.
THE REQUEST / NO CONSTRUCTION COMMITMENT
Ask the Gallatin Valley MPO to include Belgrade–Airport–Bozeman in regional alternatives screening and convene Streamline,
the cities, County, MDT, MSU and airport officials for a scoping discussion. Compare enhanced bus/BRT, a shorter rail option, and
the full two-service concept before making investment decisions.
SOURCES [1] U.S. Census (2025) [2] BZN Airport (Oct. 2026) [3] MSU (Fall 2026) [4] Streamline Pinkline [5] MPO LRTP