Loading...
HomeMy WebLinkAbout10-28-26 Public Comment - E. Johnson - A connected Gallatin ValleyFrom:Ethan Johnson To:Bozeman Public Comment Subject:[EXTERNAL]A connected Gallatin Valley Date:Wednesday, October 28, 2026 1:19:54 PM Attachments:Gallatin Valley - Three Page MPO Pitch.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Greetings Gallatin Valley MPO committee, My name is Ethan Giles, and I would like to first thank you for allowing me the chance tospeak breifly. I am certain that Gallatin Valley would only find value and sustained ridership if this idea takes root. I do not ask for any action as of now, but a feasibility report would be thenext logical step if this plan is taken into serious consideration. I truly think that such a visual and available and reliable transportation option would only create a more widely accessibleand connected Gallatin Valley. The map here is only a place holder, as a better route could be found connecting the University and perhaps further down main. Workers getting to Bozeman from Belgrade, students exploring their space and getting to jobsand opportunities, people who have to pay for gas constantly, new businesses that would benefit from a higher pedestrian count, getting to school, arriving at the airport and havingeasy access to the town, opening up economic flow around the Gallatin Valley, cut down on drinking and driving, allowing people to connect with each other rather than passing by in ourcars without ever having a chance at a conversation, offering businesses a new space to advertise, and the visual of the bobcat as cars pass by on the highway; all these things I believewould be positively influenced by such a dedicated system. REGIONAL MOBILITY / FEASIBILITY CONCEPT CONNECTING THE GALLATIN VALLEY BELGRADE / BZN AIRPORT / BOZEMAN THE IDEA Evaluate a single-track regional tram corridor via Bozeman Yellowstone International Airport, with a possible Bozeman urban circuit and Streamline bus connections. The concept would use no more than two operating trams; final alignment and service are not determined. 128,740 GALLATIN COUNTY RESIDENTS 2025 estimate [1] 3.00M AIRPORT PASSENGER MOVEMENTS 12 months to Sept. 2026 [2] 17,477 MONTANA STATE STUDENTS Fall 2026 [3] CORRIDOR TO BE STUDIED BELGRADE BZN AIRPORT N. BOZEMAN DOWNTOWN Regional shuttle / airport stop + urban circulator or through-service to test + Streamline feeders POTENTIAL PUBLIC BENEFITS WHAT FEASIBILITY MUST PROVE 01 Workforce and education access More reliable trips between housing, jobs, MSU and regional employers, especially for people without a car. 02 Household transportation savings Potential to reduce fuel, parking and vehicle dependence; test actual costs and travel-time competitiveness. 03 Airport and visitor economy Connect visitors and residents to downtown and onward regional shuttles without requiring every trip to start in a car. 04 Walkable business districts Stations and safe pedestrian links could support visits to Main Street shops, restaurants and services; measure footfall impacts. 05 A connected transit network Use fare-free Streamline as a complement and feeder; evaluate future Four Corners and MSU links separately. RIDERSHIP + SERVICE Forecast workers, visitors and local trips; compare travel times and real demand with existing transit. TWO-TRAM OPERATIONS Model hourly service, single-track signaling, passing sidings, transfer times and recovery from delays. LAND + SAFETY Survey route and airport access; inspect utilities, crossings, highway exposure, winter conditions and emergency access. COST + VALUE Estimate construction, annual operations, maintenance, subsidy and funding; compare improved buses and BRT. Reality check: Single track limits passing and two active vehicles provide no spare. Rail may involve very substantial capital costs; nothing here is a validated construction or ridership estimate. THE REQUEST / NO CONSTRUCTION COMMITMENT Ask the Gallatin Valley MPO to include Belgrade–Airport–Bozeman in regional alternatives screening and convene Streamline, the cities, County, MDT, MSU and airport officials for a scoping discussion. Compare enhanced bus/BRT, a shorter rail option, and the full two-service concept before making investment decisions. SOURCES [1] U.S. Census (2025) [2] BZN Airport (Oct. 2026) [3] MSU (Fall 2026) [4] Streamline Pinkline [5] MPO LRTP