Loading...
HomeMy WebLinkAbout10-26-26 Public Comment - N. Ross - Response to Comment on Kagy-Sourdough Roundabout RequestFrom:Nicholas Ross To:samh@samh.net; Salal Huber-McGee Cc:Bozeman Public Comment Subject:Response to Comment on Kagy-Sourdough Roundabout Request Date:Monday, October 26, 2026 9:23:01 AM Hi Sam and Salal, Thank you both for your recent comments requesting a roundabout at Kagy and Sourdough. Roundabouts are the preferred intersection type in our city’s Steets Are For Everyone (SAFE) Plan and we successfully requested the inclusion of this as an option in MDT’s intersection control evaluation. Unfortunately, that study determined a roundabout would have significant right of way, utility, and topographic impacts at this specific location that would push its cost above $3 million dollars. The project is funded through the highway safety improvement program, which are competitive federal funds based on having strong benefit/cost ratio for the projects. Due to the relatively small safety improvement compared to a traffic signal and far higher cost, MDT informed us the project was only fundable if the signal was chosen. Denying HSIP funds and funding the roundabout exclusively through city taxes would’ve required deferring or delaying several years of much-needed safety projects across the city in order to fit into our Capital Improvement Plan. For that reason, and of course the right-angle crash reduction benefits a signal will still provide, staff recommended moving forward with the signal option. Roundabouts will continue to be our preferred intersection option, this rather unique location in town simply made it too costly. -Nick Nicholas Ross, P.E. Director | Transportation and Engineering City of Bozeman C: 406-595-3437 O: 406-582-2315 nicholas.ross@bozemanmt.gov