Hi Sam and Salal,
Thank you both for your recent comments requesting a roundabout at Kagy and Sourdough.
Roundabouts are the preferred intersection type in our city’s Steets Are For Everyone (SAFE)
Plan and we successfully requested the inclusion of this as an option in MDT’s intersection
control evaluation. Unfortunately, that study determined a roundabout would have significant
right of way, utility, and topographic impacts at this specific location that would push its cost
above $3 million dollars. The project is funded through the highway safety improvement
program, which are competitive federal funds based on having strong benefit/cost ratio for the
projects. Due to the relatively small safety improvement compared to a traffic signal and far
higher cost, MDT informed us the project was only fundable if the signal was chosen.
Denying HSIP funds and funding the roundabout exclusively through city taxes would’ve
required deferring or delaying several years of much-needed safety projects across the city in
order to fit into our Capital Improvement Plan. For that reason, and of course the right-angle
crash reduction benefits a signal will still provide, staff recommended moving forward with the
signal option.
Roundabouts will continue to be our preferred intersection option, this rather unique location
in town simply made it too costly.
-Nick
Nicholas Ross, P.E.
Director | Transportation and Engineering
City of Bozeman
C: 406-595-3437
O: 406-582-2315
nicholas.ross@bozemanmt.gov