HomeMy WebLinkAbout10-24-26 Public Comment - K. Silvestri - Prioritize Natural Resources with the Northwest Area PlanFrom:Kenneth Silvestri
To:Bozeman Public Comment
Subject:[EXTERNAL]Prioritize Natural Resources with the Northwest Area Plan
Date:Saturday, October 24, 2026 2:10:07 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Dear City of Bozeman Commissioners,
I’m writing about the Northwest Bozeman Area Plan. The draft states that its vision is “to
protect existing natural resources,” and I’m asking you to make that the deciding priority.
This area is unusual. It holds Aajaker and Baxter Creeks, miles of irrigation ditches, and
extensive wetlands and riparian habitat. The draft acknowledges that impacts “cannot be
entirely avoided.” Once land is designated and annexed at urban intensity, that loss is
largely irreversible.
I have five specific concerns:
1.
The protections are thin compared to the intensity being designated. The plan
maps 50-foot setbacks, but it defers restoration, the wetland mitigation bank, and the
regional stormwater facility to “further analysis.” The Gallatin Watershed Council
advocates based on validated and peer reviewed scientific evidence the need for
greater setbacks than 50 feet. Meanwhile, the Mixed Use and Commercial Mixed Use
designations are mapped now. Protections should be settled first.
2.
Parks & Open Space is a designation with no locations. Housing and commercial
nodes are mapped, but open space is left unmapped. I ask that the creek and
wetland corridors be designated as open space on the map. Besides the Lakes at
Valley West, this area lacks a connected trail system corridor for people to utilize
instead of using their vehicles and those residents get to benefit from access to
wetlands and open space without the intense housing density. The extensive
wetlands in this area would provide an opportunity to create an interconnected trail
system that the western portion of the City lacks. That should be installed first before
any major development is approved or initiated.
3.
There are no major employers here, and the plan would not create any. The
area is primarily agricultural land and scattered homes. The commercial nodes in the
plan are neighborhood services such as restaurants, retail, offices and clinics, and
the plan itself says it does not envision a district comparable to Downtown or
Midtown. Adding housing and density here means residents will drive to jobs
elsewhere in the valley. That adds commuter traffic to a road network the draft calls
its “biggest mobility challenge,” with few paved roads and no connected network.
4.
Services are already lacking, and safety on existing roads is a concern. Law
enforcement is currently provided by the Sheriff’s Office, and city police, fire, and
parks services would all have to be extended after annexation. Roads in the area are
already dangerous and adding these commercial nodes and intense density
combined with Baxter Road serving the main entry point from Belgrade commuters is
only going to exacerbate the problem and stress resources further or increase tax
burdens on existing residents to fill the gaps to maintain safety.
5.
The plan itself reports “stark disagreement” over density and character, and
infrastructure isn’t in place. Water and sewer capacity were named as critical-path
issues, and almost no city services exist there. Designating urban-intensity uses first
and sorting out services later invites pressure to compromise on natural resources
instead of urban density.
Thank you for your service and your consideration.
Sincerely,
Ken Silvestri
5785 Saxon Way, Unit A
Bozeman, MT 59718