Loading...
HomeMy WebLinkAbout26 - Amendments 1 - Morrison-Maierle, Inc. - Municipal Groundwater Supply ProjectAmendment 1 to Professional Services Agreement for Municipal Groundwater Project Page 1 of 2 FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR City of Bozeman Municipal Groundwater Supply Project dated February 4, 2025 (the “Agreement”) is made and entered into this _6th__ day of October_, 2026, by and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and Morrison-Maierle, Inc. hereinafter referred to as “Engineer.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1.Scope of Services. Scope of services is amended to add the following services: o See Attached Exhibit A - Scope of Work 2. Payment for Scope of Services for Amendment No. 1. Work to be completed on an hourlybasis as provided for in the original agreement at a fee to not exceed $204,360. 3.Agreement still valid. All remaining terms and provisions of the original Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** Docusign Envelope ID: 57C37EDE-8278-8065-822F-12CFDDAC492E Amendment 1 to Professional Services Agreement for Municipal Groundwater Project Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA MORRISON-MAIERLE, INC. By________________________________ By_____________________________ Chuck Winn, City Manager Print Name: Travis Eickman Title: Bozeman Operations Manager APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney Docusign Envelope ID: 57C37EDE-8278-8065-822F-12CFDDAC492E Exhibit A City of Bozeman Municipal GW Project – Amendment 1 Scope of Work PROJECT DESCRIPTION: The intent of this project is to develop public water supply (PWS) production wells for the City of Bozeman (COB), including permitting through both the Department of Environmental Quality (DEQ), and the Department of Natural Resources and Conservation (DNRC). The scope of work includes amendment for change in scope under the original scope of work including tasks 101 project management, 102 GW Eval Valley Wide, and 107 Project Ranking and includes new scope of work under 101 Project Management, 106 Consultant Coordination and new tasks 109, test well drilling oversight, 110 Geophysical Surveys. A future scope will include permitting through DNRC and DEQ, design of production wells, mitigation infrastructure, well houses, treatment systems, and construction related tasks. The level of effort in the budget is based on what is estimated to be a reasonable level of effort to identify sites that will likely yield significant quantities of groundwater and explore mitigation strategies that are likely acceptable to the DNRC. It is not intended to be an exhaustive level of effort, and the end product will be based on the estimated budget per task. The general scope of work in Phase I includes the following: • Hydrogeologic evaluation • Groundwater modeling • Mitigation evaluation • Prepare test well drilling plan to identify potential yields of target areas. SCOPE OF WORK: AMENDMENT 1 – SCOPE CHANGE - PLANNING AND TEST WELL DEVELOPMENT 101 – PROJECT MANAGEMENT AND GUIDANCE Project Status Meetings: This task will include routine project status meetings with COB staff estimated to be on a bi-monthly basis. Includes meetings from 01/01/2026 through 12/31/2026. Project Management and Guidance: This task provide project management throughout Phase 1, focused on delivering a quality product within the specified schedule. The task includes internal staff management, coordination with and management of subconsultants, and coordination with the COB. Monthly invoices for services rendered will be prepared along with an accompanying progress report. Includes project management from 01/01/2026 to 12/31/2026. Docusign Envelope ID: 57C37EDE-8278-8065-822F-12CFDDAC492E 102 – HYDROGEOLOGIC EVALUATION – VALLEY WIDE • Includes tasks under original scope of work • Acquire surface water flow data from existing published sources. Discrete physical measurements may be utilized in areas without historical records or for verification purposes. Assume four field measurements. o Amendment Increases field visits, instrumentation and monitoring on Bozeman Creek and Middle Creek through 06/01/2026. o Additional field work assumes, 5 days of effort to measure streamflow at all monitored sites, download and remove equipment. 106– Consultant Coordination Add additional budget for continued consultation with Geophysical companies, WET, Barnes Groundwater, meetings with Gallatin Water Trust, Meetings with IWRP. 107– PROJECT RANKING • Provide a ranking of each selected site, including the Sports Park Well • Ranking will include well yield potential, permitting potential, infrastructure cost. • Use ranking table to identify permitting and/or test well drilling locations along with a workshop with City staff and Legal counsel. Increased scope of work for analysis of Belgrade options and ASR options not contemplated in original scope. 109 – Test Well Drilling Oversight, Testing, Analysis and Reporting Test well drilling oversight is based on drilling oversight of two, four-hundred-foot-deep wells, aquifer testing including two stepped rate tests, two constant rate tests, one injection test, monitoring equipment for four wells, a full water quality suite from both the existing shallow monitoring wells and the two deep exploration holes, test analysis and reporting. This program is specific to the Leverich Site. 110 – Sub-Consultant – Geophysical Companies Includes subcontracting for geophysical companies including previous work by Big Sky Geophysics, current work by TSS, and contingent for future work as needed. Docusign Envelope ID: 57C37EDE-8278-8065-822F-12CFDDAC492E Fee Estimate by Task Task 101 Project Management $36,000.00 102 GW Eval Valley Wide Streamflow $42,000.00 Geophysics Analysis $5,000.00 106 Consultant Coordination $15,000.00 107 Project Ranking $6,000.00 109 Test Well Drilling $70,360.00 110 Sub-Consultant Geophysics $30,000.00 Total $204,360.00 Docusign Envelope ID: 57C37EDE-8278-8065-822F-12CFDDAC492E