Loading...
HomeMy WebLinkAbout26 - Amendments 2 - Sanbell - TE23-006 West Oak St & Ferguson Intersection DesignAMEND. TO SERVICES AGREE. OCTOBER 2024PAGE 1 OF 1 AMENDMENT TO SERVICES AGREEMENT – NO. 2 1. PROJECT/SERVICES AGREEMENT INFORMATION Effective Date of Original Services Agreement: 2/4/25 Project Name: TE23-006 West Oak St & Ferguson Intersection Design Project Number: 22367.07 Client Name: City of Bozeman Transportation & Engineering Department 2. NATURE OF AMENDMENT ☒Modifications to Sanbell scope of work and/or contract fee amount ☒Modifications to project schedule 3. DESCRIPTION OF SERVICES AGREEMENT MODIFICATIONS Phase 6 – Construction Admin & Inspection 4. FEE MODIFICATIONS Original services agreement fee: $48,500 Total fees for prior Amendments: $22,940 Total services agreement fee with prior Amendments: $71,440 Proposed fee for this Amendment: $7,015 Total services agreement fee with all Amendments: $78,455 Client and Sanbell hereby agree to modify the above-referenced Services Agreement as set forth in this Amendment. All provisions of the Services Agreement not specifically modified by this or any prior Amendments shall remain in effect. The effective date of this Amendment shall be the signature date of the Client as shown below. CLIENT SANBELL Signature: Signature: Printed: Chuck Winn Printed: Danielle Scharf Title: City Manager Title: Principal Date: Date: Docusign Envelope ID: 8FC07D35-D152-81C9-832B-CD11C0C52DFC 10/13/202610/13/2026 Transportation Engineering Term Contract Amendment #2 – West Oak St & Ferguson Avenue Intersection Design Task Order No. TE23-006 9/8/26 Sanbell is pleased to provide this Amendment #2 for limited construction administration and inspection of intersection improvement at the West Oak Street & Ferguson Avenue intersection. The intersection improvements will incorporate Oak Street and Ferguson Avenue left-turn lanes, removal of Ferguson Avenue northbound right-turn only lane and Oak Street median closure of Ryun Sun Way. A detailed scope of services is outlined below. This work is to be done as a part of the Transportation Engineering term contract for engineering services. Scope of Work: Phase 6 – Construction Administration & Inspection This phase of the project will consist of construction inspection and on-going administration, including the following: • Construction observation and documentation based on assumed observation of 20 hours • Respond to contractor RFI’s • Process Pay applications submitted by Contractor and any necessary work change directives, verify material quantities on all contractor pay requests • Process the Certificate of Substantial Completion, coordinate final inspection, prepare punch lists and verify completion • Prepare as-built (record) drawings • Prepare City of Bozeman close-out submittal • Conduct two-year warranty walkthrough, prepare punch list and verify completion The following items are specifically excluded from this scope of work: • Coordination of material testing and payment (By City Term Contract) • Construction Staking (By selected contractor) • Community Outreach (By City Staff) Docusign Envelope ID: 8FC07D35-D152-81C9-832B-CD11C0C52DFC Fees and Billing Arrangements: Fee Phase 6 – Construction Administration & Inspection $7,015 Total Fee $7,015 Sanbell will bill for its services on a time and materials basis with a not to exceed amount of $7,015 as specified in the fee table above and attached detailed hourly breakdown. Sanbell shall submit invoices to the Client for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “time-and-material basis” according to the attached current standard rate sheets for Sanbell-Rocky Mountain. Monthly invoices shall include, separately listed, any charges for service for which time charges and/or units’ costs shall apply. Project Schedule: The anticipated schedule for this project is completion of construction October 2026. Docusign Envelope ID: 8FC07D35-D152-81C9-832B-CD11C0C52DFC