030'60'90'S C A L E1.ALL CONSTRUCTION TRAFFIC MUST FOLLOW THE DESIGNATEDCONSTRUCTION ROUTE SHOWN ON SHEET C1.0.2.A PERIMETER CONSTRUCTION FENCE SHALL BE INSTALLED FOR THEDURATION OF CONSTRUCTION.3.THE CONTRACTOR TO MAKE FINAL DECISIONS ON LOCATIONS OFCONSTRUCTION PARKING, DUMPSTERS, MATERIAL STAGING, ETC.4.DEMOLITION DEBRIS AND EXCAVATED MATERIAL THAT IS GENERATED ATTHE BEGINNING OF THE PROJECT MAY BE STOCKPILED ON-SITE FORIMMEDIATE HAUL-OFF AND DISPOSAL.5.SUITABLE MATERIALS THAT ARE EXCAVATED AS CONSTRUCTIONPROGRESSES MAY BE STOCKPILED ON-SITE AT A DESIGNATED LOCATIONAND FOR USE IN GRADING OR BACKFILL AS APPROPRIATE(APPROXIMATELY 6 MONTHS) SPOILS STORAGE IS NOT PROPOSEDON-SITE.6.A CONSTRUCTION SWPPP PLAN AND PERMIT WILL BE SUBMITTED FOR THEPROJECT UNDER A SEPARATE COVER.CONSTRUCTION MANAGEMENT:LHWDUMPSTERSIZE(cy)DUMPSTERLENGTHL (ft)DUMPSTERWIDTHW (ft)DUMPSTERHEIGHTH (ft)TABLE 1: ROLL OFF DUMPSTER STANDARD DIMENSIONS101520304011' 3"8' 3"4' 4"FRONTSIDEROLL-OFF DUMPSTERNO SCALE117' 0"8' 3"4' 4"22' 9"8' 3"4' 4"23' 1"8' 3"6' 1"23' 1"8' 3"7' 9"C2.2CONSTRUCTION STAGING &MATERIAL STORAGE AREAAPPROX. SPOILSPILE LOCATIONS(DEMO PHASE)JOB TRAILER40-CY ROLL-OFFCONST. DUMPSTERSTABILIZEDCONSTRUCTIONENTRANCESTABILIZEDCONSTRUCTIONENTRANCE(DEMO PHASE)CONSTRUCTIONFENCESTABILIZEDCONSTRUCTIONENTRANCEDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B26-010 C2.2 CONSTREV DATE REVISION
PRINTED 2026-05-06, BY BRADEN SHRADER, I:\2026\BOZ\B26-010 KAGY LIHTC\06_CADD\CIVIL\B26-010 C2.2 CONST.DWG
1825 W KAGY - WOODWARD FLATS
BOZEMAN, MONTANA
CONSTRUCTION MANAGEMENT PLAN
BASCJCCJC5.6.2026B26-010SHEETC2.2SP SUBMITTAL.DWGPAGE SETUP 2023_TDH_22X34_AS_11X17_L
Engineering
tdhengineering.com