Loading...
HomeMy WebLinkAbout22 1825 W Kagy_Email from D. Giannetti 7-9-261 Cody Croskey From:Danae Giannetti <Danae.Giannetti@bozemanmt.gov> Sent:Thursday, July 9, 2026 9:31 AM To:Cody Croskey Cc:Drew Wojack; Simon Lindley; Taylor Lonsdale; Candace Mastel Subject:RE: [EXTERNAL]FW: Questions Regarding 1825 West Kagy Development Attachments:COB_DesignIntentDwgs_ATSignageOnly_Apr2026.pdf CAUTION: This email originated from outside of TD&H. Be sure you know the sender and use caution when clicking on links or attachments. Hi Cody, Thanks for checking in on the shared use path signage that we are rolling out in Bozeman now. I’ve attached the active transportation signing portion of the PRAT Wayfinding Design Intent Drawings PDF. The entirety of the Design Intent Drawings hasn’t made it on our website yet as the Parks department is working through edits on their end. To answer your question, yes, we will be adding the “Shared Pathway” sign (provided on PDF pg 10) in response to community feedback, particularly regarding concrete surface facilities, that it wasn’t clear whether bicycles were allowed or not. Our intent is to make it clearer that bikes and peds are both allowed on the soon-to-be widening facility along the east side of 19th. I’d suggest referencing the mounting height on PDF pg 7 and set the edge of sign 2’-4’ laterally from the edge of the path. Please provide signage for both directions of travel on the path. In reviewing NACTO references out of Canda, the recommended spacing of the signage along the pathway varies from 300’ to 650’. My suggestion is installing a sign near the intersection of 19th and Kagy. The 1825 W Kagy site frontage along 19th is less than 350’ so I’m thinking we would place the next sign north around the Remington Way intersection as part of our project. Let me know if you need anything else. Sincerely, Danae Danae Giannetti, PE | Engineer II City of Bozeman From: Cody Croskey <Cody.Croskey@tdhengineering.com> Sent: Tuesday, July 7, 2026 5:07 PM To: Danae Giannetti <Danae.Giannetti@bozemanmt.gov> Cc: Drew Wojack <dwojack@reuterwalton.com>; Simon Lindley <Simon.Lindley@bozemanmt.gov>; Taylor Lonsdale <Taylor.Lonsdale@bozemanmt.gov>; Candace Mastel <Candace.Mastel@bozemanmt.gov> Subject: RE: [EXTERNAL]FW: Questions Regarding 1825 West Kagy Development CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Danae, 2 I’m working on the civil plans for 1825 W Kagy and we received the following site plan comment from Candace (also copied on this email). Were you planning any signage for the City’s portion of this widened shared use path that we should incorporate or match for consistency along our project? Thanks! Cody Croskey, P.E. | Civil Engineer & Principal TD&H Engineering 234 E. Babcock, Suite 3 | Bozeman, MT 59715 t: 406.586.0277 | d: 406.602.4091 | c: 406.580.0685 www.tdhengineering.com From: Drew Wojack <dwojack@reuterwalton.com> Sent: Tuesday, June 23, 2026 8:52 AM To: Cody Croskey <Cody.Croskey@tdhengineering.com> Cc: Paul Keenan <pkeenan@reuterwalton.com> Subject: FW: [EXTERNAL]FW: Questions Regarding 1825 West Kagy Development CAUTION: This email originated from outside of TD&H. Be sure you know the sender and use caution when clicking on links or attachments. Cody, See below from the City. Do you see any issue with the approach that Danae is describing? As it sits currently, I believe our plans already indicate the widening to be in our scope but just wanted to make sure we were all aligned. Best, Drew Wojack Sr. Construction Manager 4450 Excelsior Boulevard, Suite 400 St. Louis Park, MN 55416 Cell: 763-843-7904 From: Danae Giannetti <Danae.Giannetti@bozemanmt.gov> Sent: Tuesday, June 23, 2026 10:35 AM To: Paul Keenan <pkeenan@reuterwalton.com>; David Fine <David.Fine@bozemanmt.gov> Cc: Drew Wojack <dwojack@reuterwalton.com>; Simon Lindley <Simon.Lindley@bozemanmt.gov>; Taylor Lonsdale 3 <Taylor.Lonsdale@bozemanmt.gov> Subject: RE: [EXTERNAL]FW: Questions Regarding 1825 West Kagy Development Hi Paul and Drew, Nice to meet you both. As a quick overview, I am in the final stages of preparing contract documents for widening the existing sidewalk between the FWP Building approach (just north of 19th & Lincoln) and Kagy Boulevard along the east side of 19th. I intend to advertise the project for bidding this summer and would like to see construction substantially completed by winter 2026. As I understand, you will be moving forward with construction of your project this fall, which will include widening of the existing sidewalk along the property’s frontage of 19th into a 10’ shared use facility. In reviewing your civil site plan, it looks like you are proposing widening on the east side of the existing sidewalk, which aligns well with our city project. Here’s a screen shot of our proposed design in the area of your parcel for your reference (north is to the right): I propose identifying the section of widening along your property as “work completed by others” so that it remains part of your project, as long as you have a high degree of certainty that you will be moving forward with construction this year. As I previously mentioned, I want to avoid rebidding a small segment of widening after the fact. Please let me know if you have any concerns with this proposed approach or if we need to explore other alternatives to ensure this network gap is closed for multimodal transportation. Thank you, Danae Danae Giannetti, PE | Engineer II