Loading...
HomeMy WebLinkAbout03 1825 W Kagy_CONR Review Comment ResponsesREF #CYCLE REVIEWED BY TYPE FILENAME Applicant SP Responses STATUS 1 CD Technician Trenton Ruffalo 2/26/26 9:59 AM Comment Do you have any questions regarding specific project input sought from the City Departments during the review? Question 2 1 Addressing Jenny Connelley 3/5/26 4:11 PM Comment An address of 1825 W Kagy already exists for this lot. That address can be used for the new building. We'll just need to work together to add unit designations once this is approved and you are ready to obtain building permits. Any additional buildings would need additional consideration and addressing. Understood - we look forward to coordinating unit addressing more once the application reaches adequacy. Info Only 3 1 Solid Waste Russell Ward 3/10/26 1:53 PM Changemark Solid Waste 1. Tip pad needs to be heated. 2. need 50 foot straight approach to front of refuse container 3.must be written into covenants that it is managements responsibility to move refuse container to tip pad for collection. 002 1825 W Kagy Site Plan.pdf Understood - a heated tip pad with 50' straight approach is shown on the site plan application materials. Info Only Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM REVIEW COMMENTS Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 4 1 Engineering Simon Lindley 3/11/26 4:21 PM Comment Engineering Design Reports: (1) City of Bozeman Design and Construction Standards Chapter 3.2 Design Reports: The applicant must submit water and sewer design reports with the site plan application. Please reference the requirements in this chapter. (2) City of Bozeman Design and Construction Standards - Storm Drainage Design: The applicant must provide a stormwater report with the site plan application. Please reference the latest (October 2024) stormwater drainage report and maintenance plan requirements in chapter 6.4 and attachment B. Please make sure to include a description of the responsible party or entity for operation, inspection, and maintenance as well as replacement of storm drainage facilities and the legal mechanism for succession/assignment. (3) This project will trigger a traffic impact study per the thresholds listed in BMC 38.710.050.A.11.g. The applicant must provide an update to the previous TIS for this project and address any new code requirements as applicable. The applicant must analyze the adjacient turn bay on Kagy. Water, sewer, & storm design reports are included with the site plan application materials. Storm system OI&M plan and TIS are also included. Info Only 5 1 Engineering Simon Lindley 3/11/26 4:21 PM Comment Ditch Noticing Checklist: BMC 38.310.010 - The applicant must fill out the Ditch Noticing Checklist found on the planning website and provide the relevant documentation with the subsequent site plan application for documentation purposes. The checklist includes a box to check if there are no new impacts. As of June 18, 2025, the checklist is required with all concept reviews, site plans, master site plans, subdivision pre-applications, subdivision preliminary plats, and PDZs. The applicant is proposing a driveway access and sidewalk over the existing MDCD irrigation pipe along S 19th Ave. It is unclear if MCDC will allow this, or if an easement or agreement is required with this project. The completed ditch noticing checklist is included with the site plan application materials. We have made contact with the Middle Creek Ditch Company and they are reviewing our plan to determine any special requirements or agreements for the new driveway. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 6 1 Engineering Simon Lindley 3/11/26 4:22 PM Comment Wetlands: BMC 38.710.070.C.7.h.(2) - Site Plan Submittal Requirements & BMC 38.710.120.A - Submittal Materials for Activities in or Adjacent to Wetlands and Watercourses With the subsequent site plan submittal, the applicant must show wetlands and watercourses on-site and within 100 feet of the project boundary. Please provide the following information so the City has complete documentation with the application: (b) If no wetland delineation was done with the prior subdivision, and if wetlands or watercourses are not present on or adjacent to the subject property, a letter signed by a qualified wetlands professional must be submitted to the city certifying there are no wetlands or watercourses within the subject property or adjacent to the property and describing the methods used to determine that wetlands or watercourses do not exist on or adjacent to the property. A letter signed by a qualified wetland professions is included with the site plan application materials. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 7 1 Engineering Simon Lindley 3/11/26 4:22 PM Comment Water Rights and Water Adequacy: Prior to the site plan application being deemed adequate for review, the applicant must describe how it intends to satisfy water adequacy requirements in BMC 38.410.110 and meet requirements of BMC 38.710.050.A.19. The information provided should be compiled into a preliminary water adequacy compliance report containing the following: a) A description of water rights associated with the property or otherwise available to the applicant, and a description of whether each respective water right is appurtenant to the property or has been severed from the land title. b) A description of the proposed lots for which a payment of cash in lieu of water rights will be provided and the proposed lots for which deferred compliance of BMC 38.410.130 will be sought. c) A description of the proposed lots for which non-potable irrigation systems will be provided; the anticipated irrigation water demand of each lot; and the water source proposed to supply the non-potable irrigation systems. i) If exempt wells are proposed for irrigation supply, then the applicant must obtain DNRC approval of Form No. 602I Notice of Intent to Appropriate Groundwater prior to adequacy. ii) If exempt wells authorized by DNRC under an approved notice of intent to appropriate groundwater are inadequate to meet the anticipated irrigation demands and existing irrigation water rights are associated with the property or otherwise available to the applicant , then the applicant must: (1) Evaluate the legal elements of the water rights to determine if a DNRC change authorization is required to use the rights as proposed. (2) Confirm that the flowrate and volume of the water rights are adequate to meet the anticipated irrigation water demands. (3) Confirm that existing water conveyance facilities can deliver the water rights from their point of diversion to the proposed place of use. If existing conveyance facilities are inadequate, then provide a description of improvements needed to deliver the water rights to the proposed place of use. Please see the water adequacy compliance memo included with the site plan application materials. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 8 1 Engineering Simon Lindley 3/11/26 4:23 PM Comment BMC 38.530.020.L - Snow removal storage areas: Please review the code section and provide the following information with the site plan. All parking facilities containing 5 or more parking spaces must provide a snow management plan. The plan must contain the following: 1. Locations for snow storage, which may include on-site landscaped areas, and other open space for at least 15 % of the total area of the site used for parking, access drives, walkways and other paved surfaces; 2. Snow storage is not allowed: a. In the public right-of-way; b. Where it would obstruct line of sight or vision triangle; c. In a location where it blocks fire hydrants, emergency vehicle access or access to other properties; d. Where it will cause unmanageable freeze/thaw and icing of sidewalks, pathways and other paved surfaces; e. Where it obstructs on-site amenities, including but not limited to points of egress, mailboxes, storage areas, and trash enclosures; f. Within any access easement; g. Where placed in a manner which violates the Clean Water Act (CWA) and/or the Montana Pollutant Discharge Elimination System (MPDES), and/or any other federal, state or local law or statute; or h. Where it will cause damage to trees located in the public right-of-way. Please see the snow management plan included with the site plan application materials. Info Only 9 1 Engineering Simon Lindley 3/11/26 4:23 PM Comment City of Bozeman Design and Construction Standards Chapter 1.4 - Plans, specifications, and submittals for public infrastructure, fire service lines, and water service lines 4-inches and larger must be submitted by the professional engineer to the City Engineering Department through the engineering Project Dox Portal for infrastructure/fire service line review. The site plan application must reach adequacy according to the review engineer prior to initial infrastructure submittal. Infrastructure approvals are valid for 1 year. Please see the infrastructure review fee schedule on the City Engineering website. Understood - infrastructure plans will be submitted to engineering following notice of site plan adequacy. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 10 1 Engineering Simon Lindley 3/11/26 4:42 PM Comment The applicant is advised the MDT Kagy Boulevard reconstruction project is anticipated to begin construction in 2027. Kagy Blvd is anticipated to be closed from South 11th Ave to South 7th Ave in 2027 and closed from South 19th Ave to South 11th Ave & South 7th Ave to Wilson/South 3rd Ave in 2028. The construction schedule is subject to change. The contractor for the 1825 W Kagy project will need to coordinate with the construction on Kagy Boulevard. The applicant is advised the Kagy Boulevard project may change the grading and require temporary construction easements from adjacent properties. Please coordinate with the MDT design build project. Understood - the project team will continue to coordinate with MDY and the selected design team for the Kagy Boulevard reconstructing project. Info Only 11 1 Engineering Simon Lindley 3/11/26 4:51 PM Comment BMC 38.400.050 & BMC 38.780.070 - The Transportation Master Plan identifies Kagy Blvd from South 19th Ave to South 3rd Ave as a recommended Major Street Network project, including intersection improvements at South 19th Ave and Kagy Blvd. The Kagy Blvd reconstruction project is on the City Capital Improvement Plan within the next three years. Prior to final site plan approval, the proposed development must pay cash-in-lieu of infrastructure towards the Kagy Blvd reconstruction project. Rueter Walton Development intents to engage the City further about this requirement during the site plan review process. Info Only 12 1 Engineering Simon Lindley 3/11/26 5:03 PM Comment BMC 38.410.070.B - The length of water services lines from the main to the structure may not exceed 150 feet in length unless approved in writing by the city. The applicant may request an administrative waiver in chapter 1.9 of the City of Bozeman Design and Construction Standards during the site plan review. Please note the city doesn't have a standard form. The request should be submitted in the form of a certified memo, and address the requirements in chapter 1.9.2 and evaluate the water pressure. Please reference chapter 4.2 for the design criteria. An administrative waiver request for water services longer than 150' has been included with the site plan application materials. Info Only 13 1 Engineering Simon Lindley 3/11/26 5:06 PM Comment BMC 38.410.060 - Easements: Prior to final site plan approval, the applicant must provide a recorded copy of a mutual access easement which allows the proposed development to access Kagy Blvd via the private drive to the east. Understood - A draft easement documents will be provided with appropriate dimensions as the project nears adequacy. A final version will be executed and recorded for final site plan approval. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 14 1 Engineering Simon Lindley 3/11/26 5:14 PM Comment The proposed driveway access onto S 19th Ave appears to be missing right turn only signage and striping. Right turn only signage & striping has been added to the plans with the site plan application materials. Info Only 15 1 Engineering Simon Lindley 3/11/26 5:23 PM Comment The City is planning to widen the existing sidewalk along S 19th Ave up to the northern property boundary of this project during the summer of 2026. As shown, the proposed sidewalk widening adjacent to this project along S 19th Ave will work with the City's proposed project to the north. Understood - We will show the sidewalk widening for this project extending to the north property line to match up with the City's project. Info Only 16 1 Water Conservation Division Eric Neustrup 3/18/26 11:35 AM Comment On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the Bozeman City Commission as well as the associated City of Bozeman Landscape and Irrigation Performance and Design Standards Manual. Projects not deemed "adequate” by June 15, 2024 are now subject to these new code requirements. To familiarize yourself with these requirements please visit https://www.bozeman.net/departments/utilities/water-conservation/new- development-standards-3620. Understood - this project is being designed in accordance with the new landscape and irrigation performance design standards. Info Only 17 1 Northwestern Energy David Fuentes 3/20/26 10:42 AM Changemark Meter Location Not an option for meter location. Refer to the New Service Guide and Electric Service Requirements & Guidelines on Northwestern Energy’s website for meter clearance requirements. ( https://www.northwesternenergy.com/account-services/for-business/construction- services) 010 1825 W Kagy L1.1 Concept Landscape Plan.pdf Please see the site utility and electrical plans included with the site plan application materials. Info Only 18 1 Northwestern Energy David Fuentes 3/20/26 10:43 AM Changemark Meter Location Not an option for utility meter location. Refer to the New Service Guide and Electric Service Requirements & Guidelines on Northwestern Energy’s website for meter clearance requirements. ( https://www.northwesternenergy.com/account-services/for-business/construction- services) 011 1825 W Kagy L1.2 Concept Landscape Plan.pdf Please see the site utility and electrical plans included with the site plan application materials. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 19 1 Northwestern Energy David Fuentes 3/20/26 10:49 AM Changemark Not a Power Source Existing transformer not an option for power. Building will require 3-phase power, likely from power pole on westside of 19th or southside of Kagy Ave. The electric utility route will need to be coordinated with Northwestern Energy’s Construction Engineering Department at a later date, as needed. For any high level questions, reach out to Emmitt.Moser@northwestern.com. 008 1825 W Kagy C200 Civil Plan.pdf Please see the site utility and electrical plans included with the site plan application materials. Proposed 3- phase power route is from the south side of Kagy Blvd. Info Only 20 1 Northwestern Energy David Fuentes 3/20/26 10:56 AM Comment Maintain 100' max from transformers to electric meter locations. Proposed electric gear needs to meet NWE electric meter requirements from New Service Guide and Electric Service Requirements & Guidelines on Northwestern Energys website. Improper gear, meter locations or clearance requirements could lead to delays in energizing building. See following link for specifics: ( https://www.northwesternenergy.com/account-services/for-business/construction- services) Please see the site utility and electrical plans included with the site plan application materials. Info Only 21 1 Transportation Candace Mastel 3/23/26 4:21 PM Comment Applicant should provide at least 263 bicycle parking spaces with 25% as short- term and 75% as long term as required in BMC 38.530.070. Future submittals should provide a breakdown of this calculation and a clear delineation on the site plan of where these bicycle parking spaces will be located. Details for the short- term bicycle rack and the long-term facility(s) should also be provided. Updated bicycle parking calculations and locations are provided on the plans meeting affordable housing Type C incentives. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 22 1 Parks Department Ross Knapper 3/26/26 9:57 AM Changemark Parks Sec. 38.420.030.A. - Cash-in-lieu of parkland request is preliminarily acceptable; Pease include additional narrative justification with site plan application addressing and referencing the review criteria listed in Commission Resolution 4784 for acceptance of CILP request. Current estimated CILP total is $138,520.80 based on 1.2 acres of parkland equivalent @ $2.65/sf. Final CILP value confirmed at time of site plan approval. 02 1825 W Kagy Concept Narrative.pdf Additional cash-in-lieu of parkland justification is included in the narrative with the site plan application materials. Info Only 23 1 Parks Department Ross Knapper 3/26/26 10:10 AM Changemark Parks Sec. 38.710.070.C.15. - Please add a parkland tracking table to the site plan showing the parkland requirements for this project. A sample table has been provided in the City Documents folder. 002 1825 W Kagy Site Plan.pdf A parkland tracking table has been added to the plans with the site plan application materials. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 24 1 Community Housing Brian Guyer 4/1/26 12:05 PM Comment 38.380.040 Affordable Housing Plan Required A. To qualify for low-income affordable home incentives, the developer must submit to the City an affordable housing plan that includes the information and complies with the standards in this section: 1. Information Required a. The total number of affordable homes, and market rate homes in the proposed development. b The table in 38.380.020 to be applied to the affordable housing plan. c. The number of bedrooms in each proposed low0income affordable home, and market rate home in the development. d. Whether each affordable home will be offered for rental or for sale; e. The location of affordable lots or units in the development; f. The applicable AMI and maximum rental or sales price applicable to each low- income affordable home; g. A description of the requested incentives from section 38.380,040. h. Any other information that is reasonably necessary to evaluate the compliance of the affordable housing plan with the requirements of this division, as determined by the review authority. i If the development is to be constructed in phases: 1) The required information may include specific commitments for the first phase of development and estimates for later phases of development, provided the combination of committed and estimated low-income affordable homes in the development equals or exceeds the minimum required to qualify for the incentives requested. 2) As the number of low-income affordable homes for each later phase is finalized, the developer must submit an update to the affordable housing plan including or updating the information required in this section. The review authority shall review and approve, approve with conditions, or deny the update using the criteria in this section. 2. Development Standards for Affordable Homes a. The number of affordable homes must meet or exceed the minimum standards needed to qualify for the applicable incentive in section 38.380.030. b The mix of bedrooms per unit in affordable homes must be as similar as Please see the affordable housing plan included with the site plan application materials. Info Only 25 1 Planning Zachary Moon 4/1/26 1:38 PM Comment Please note that for a formal submittal, the Site Plan Checklist has been updated to reflect the new standards adopted with the Unified Development Code which was adopted on February 1, 2026. The updated checklist can be found at this link: Site Plan Checklist Understood - thank you.Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 26 1 Planning Zachary Moon 4/1/26 1:40 PM Comment BMC Section 38.410.010.B. The statement on the natural environment should include information on existing vegetation. The provided statement says that there is stump removal which will be required, however, at least as recent as earlier this year, it appeared that there were a number of trees on site. Please clarify existing trees to be removed with a formal submittal. This should also be provided within an exhibit showing existing conditions on the site plan. The statement of natural environment is correct. All trees at the site had been removed prior to the CONR application with some remaining stumps yet to be removed. Info Only 27 1 Planning Zachary Moon 4/1/26 4:04 PM Comment Checklist- Site Plan- Item #2 requires that all relevant lot standards required by the applicable zoning district (in this case, R-D) are required to be shown on the Site Plan. Please ensure the site plan shows dimensions relating to minimum and maximum setbacks, frontage percentage, horizontal massing entrance spacing for staff to determine compliance with all standards of the R-D zone upon formal submittal.. Noted. Architectural site plan will address these items as part of Site Plan Application. Info Only 28 1 Planning Zachary Moon 4/1/26 4:06 PM Comment Checklist - Site Plan- Item 1- requires that the site plan show existing and proposed data spanning a minimum of 100 feet from the site, excluding public right-of-way. Please expand the bounds of the site plan to show data for the required 100-feet surrounding the subject site upon formal site plan submittal. Civil plans show data spanning 100' from site. Architectural site plan focuses more on the site specifically for legibility and to serve as a complimentary document to the civil site plan. Info Only 29 1 Planning Zachary Moon 4/1/26 4:17 PM Comment Along with all coversheet items required on the Site Plan Checklist, please ensure that calculations are provided that show the proposed development meets the minimum density of the R-D zoning district in any formal submittal. Noted. This information has been included on the cover sheet with the site plan application materials. Info Only 30 1 Planning Zachary Moon 4/1/26 4:19 PM Comment The building appears to be setback further than the allowed maximum setback distance within the R-D zoning district of 15 feet. Please ensure that the building is sited such that it meets the minimum and maximum (10 and 15 respectively) setbacks of the R-D zoning district in any formal submittal. The building has been positioned to meet the minimum and maximum setbacks and build-to requirements using MDT's preliminary right-of-way plan for Kagy Blvd. dated 12/16/2025. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 31 1 Planning Zachary Moon 4/1/26 4:21 PM Comment The site plan references Block Frontage Standards. Please be aware that the Bozeman Municipal Unified Development Code was adopted in December and went into effect on February 1, 2026. Please ensure that all design elements are in compliance with the most recent version of the Unified Development Code in any formal submittal. Noted.Info Only 32 1 Planning Zachary Moon 4/1/26 4:24 PM Comment The site plan shows amenity space directly adjacent to the building. If a formal submittal sites the amenity space similarly, please be aware that BMC Section 38.260.040.B.3.b.(7) requires that any building facade adjacent to open space must have a minimum of 15% transparency for each story. Please provide transparency calculations for any building facade adjacent to a building in a formal submittal. This requirement is noted. Transparency calculations will be provided on Site Plan Application. Info Only 33 1 Planning Zachary Moon 4/1/26 4:28 PM Comment BMC Section 38.260.040.B.3.b.(8) Please be aware that common outdoor open space must be appropriately separated from ground level windows, streets, and parking lots by providing landscaping, fencing or other acceptable screening treatments that make the area safer and more usable. And that planter beds and other treatments may not be counted towards the open space calculation. Please ensure that these design requirements are applied in any formal submittal. Understood. Please see the landscaping plans and amenity space exhibit provided with the site plan application materials. Info Only 34 1 Planning Zachary Moon 4/1/26 4:31 PM Comment The plans currently are unclear exactly where the MDT right of way will be expanded to between the civil plan and architectural plan. In the civil plan, common outdoor open space (in the new code amenity space) and pedestrian connections are shown encroaching into the shown expansion of the MDT right of way. Please be aware that MDT is not likely to permit such encroachments, and planning staff would not count amenity space within a street right-of-way towards the overall total amenity space calculation. The applicant understands that the Kagy Blvd right-of way will not be expanding based on MDT's preliminary right-of-way plan dated 12/16/2025. We have coordinated outdoor amenity spaces and building entry improvements accordingly. Info Only 35 1 Planning Zachary Moon 4/1/26 4:37 PM Comment BMC Section 38.210.050.A.7. requires that a minimum of 80% of the facades facing West Kagy Blvd and South 19th Ave be constructed within the required setbacks. Please design the structure to meet the minimum build to requirement of 80% in any formal submittal. Noted. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 36 1 Planning Zachary Moon 4/1/26 4:38 PM Comment Per BMC Section 38.260.010.B.2. properties can have multiple primary street lot lines. Because they are both arterial streets and because this is a high visibility street corner, West Kagy Boulevard and South 19th Avenue are both considered primary streets. Please ensure that the building is designed to meet all standards for primary streets along these frontages in any formal submittal. Noted. Info Only 37 1 Planning Zachary Moon 4/2/26 9:26 AM Comment BMC Section 38.210.050.B.2.B. limits a building to a maximum of 250 feet wide. This applies to any street facing facade. One plan designates the width along South 19th as 248feet, however when staff measures the building width along South 19th Avenue it appears to exceed the allowed 250-foot maximum. Please either design the building to be at or less than the maximum width allowed or provide a statutory alternative such as the Open Space as Building Break (per BMC Section 38.260.110.B.3.b.). Please ensure that any formal submittal meets the maximum building widths allowed by Municipal Code. Building length along S. 19th has been updated with the Site Plan Application to stay below 250' length to avoid the building break or open space requirement. Info Only 38 1 Planning Zachary Moon 4/2/26 9:46 AM Comment BMC Section 38.210.050.B.3. requires a minimum activation of at least 9 feet. Please ensure that floor plans are detailed and designate the area as defined by Section 38.260.120. and that calculations are shown which remove portions not allowed to count towards the activation such as storage, stairwells, equipment rooms, etc.. Please provide this information in any formal submittal. Noted. The street facing rooms are either units or common amenity spaces that will meet this requirement. Stairwells, storage and equipment rooms all face inward on the site. Info Only 39 1 Planning Zachary Moon 4/2/26 9:53 AM Comment Please provide data on elevation sheets which indicates that the building will be built in conformance with BMC Section 38.210.050.B.4.E. which requires that the ground floor elevation is set between -2ft and +5ft from grade and as clarified by BMC Section 38.260.130.B. Please ensure that this data is provided in any formal application. Noted. Grading plans and architectural elevations will demonstrate this requirement being met on formal Site Plan Application. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 40 1 Planning Zachary Moon 4/2/26 10:14 AM Comment Please provide all calculations related to window transparency requirements of the R-D zoning district. In order to comply with BMC Section 38.210.050.B.5. all stories must have a minimum of 30% transparency. See the measurements required for determining each floor height for this calculation located in BMC Section 38.260.140. Please provide this information on the elevation sheets in any formal submittal. Noted, however, per the design team's follow up email; only the first floor is required to have 30% transparency and 15% on upper stories. Info Only 41 1 Planning Zachary Moon 4/2/26 10:15 AM Comment Per BMC Section 38.520.040.B. for each facade, a building is required to provide a change in roofline with vertical modulation of at least 2 feet, every 60 horizontal feet of building width pursuant to the detailed requirements of Subsection F. All elevations need to provide this vertical articulation at least every 60 feet. Please design the structure to provide the minimum required facade articulation on all facades in any formal submittal. This section cites a nonresidential façade articulation requirement. Per follow up email, design team will follow 38.520.040.C which addresses building articulation requirements for residential structures. Info Only 42 1 Planning Zachary Moon 4/2/26 10:16 AM Comment Checklist- Building Design- Item #4- please, in a written narrative, provide a response as to how the proposed building facade meets the Building Massing and Articulation requirements of Bozeman Municipal Code, Section 38.520.040. Please ensure this is provided in the narrative for any formal application. Please see the narrative included with the site plan application materials. Per previous comment, design team will address requirements of 38.520.040.C. Info Only 43 1 Planning Zachary Moon 4/2/26 10:35 AM Comment Please ensure that in any formal submittal the parking lot landscaping is designed in conformance with Section 38.540.050. Currently it appears that there may not be enough landscaped areas to ensure that no parking space is further than 70- feet from the trunk of a tree. Please see the landscape plans included with the site plan application materials with radii from trees demonstrating compliance with this recruitment. Info Only 44 1 Planning Zachary Moon 4/2/26 10:36 AM Comment Please ensure that in any formal submittal the parking lot landscaping is designed in conformance with Section 38.540.050. Currently it appears that landscape screening has not been provided to mitigate the residential adjacency along the North and East property lines. Please ensure that any formal submittal includes landscape screening in conformance with subsection B.2.a. Please see the landscape plans included with the site plan application materials for proposed landscape screening from parking lots. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 45 1 Planning Zachary Moon 4/2/26 10:41 AM Comment BMC Section 38.510.040.C.4. requires that one walkway must be provided at a maximum spacing of every 200ft or every 4 parking rows. In order to ensure that this site complies with minimum pedestrian path spacing, the site must contain at least 2 pedestrian walkways which provide north/south access. Planning staff would recommend placing one on the eastern property line and one through the center of the parking lot next to the proposed location of bike parking in order to satisfy this requirement. Please provide pedestrian paths through the property at the minimum required spacing in any formal submittal. North/south walkways have been added along the east property line and through the center of the parking lot as recommended by planning staff. Info Only 46 1 Planning Zachary Moon 4/2/26 10:42 AM Comment BMC Section 38.510.040.D.3. requires that pathways must be separated from structures by a minimum of 3 feet of landscaping. Please provide the minimum 3 feet of landscaping between the sidewalk that provides access to the building and the building in any formal submittal. Please see the landscape plans included with the site plan application materials for 3' min landscaping provided between sidewalks and the building except at door locations. Info Only 47 1 Planning Zachary Moon 4/2/26 11:10 AM Comment Please ensure that in any formal submittal, all mechanical and service equipment is appropriately screened pursuant to BMC Section 38.510.060. Please see the landscape plans included with the site plan application materials for proposed equipment screening. Info Only 48 1 Planning Zachary Moon 4/2/26 11:14 AM Comment BMC Section 38.510.060.B. The trash location may not be appropriately sited. Given the limited information within this submittal, it is unclear whether it would be acceptable. Please ensure that the trash enclosure is located away from internal pathways and pedestrian areas while still being accessible for solid waste pick up. This may require early coordination with the Solid Waste Department, prior to formal submittal. There is no permanent trash enclosure proposed. Dumpsters will be stored internally to the building and will be rolled out to a heated tip pad on trash day for collection. See also solid waste comment REF #3. Info Only 49 1 Planning Zachary Moon 4/2/26 11:18 AM Comment No lighting information was provided with this application. Lighting is never required to be installed, but if proposed must meet minimum and maximum standards within Division 38.560. Please ensure that- if proposed- lighting fixture cutsheets are provided, photometric plans are provided, and that all standards for lighting are met. Please see the site electrical and lighting photometric plans included with the site plan application materials. Info Only Created in ProjectDox version Plan Review - Review Comments Report Project Name: 26116 1825 W Kagy CONR Workflow Started: 2/24/2026 1:01:12 PM Report Generated: 04/06/2026 11:13 AM 50 1 Planning Zachary Moon 4/2/26 11:24 AM Comment Per BMC Section 38.260.090. parking and drive aisles are not allowed within the side setbacks but are allowed within the rear setback. Please ensure that, in a formal submittal, the site is designed to comply with this standard. With the existing layout, it would appear that the rear setback would apply to the northern property line and that a side setback would apply to the eastern property line. This will allow residential adjacent screening be provided along with a pedestrian walk way along the eastern property line and will allow compliance with all required setbacks. Parking is provided in the 20' rear setback with landscape screening along the north property line. No parking or drive aisles are proposed within the 5' side setback along the east property line, except for the driveway crossing the setback as allowed by BMC 38.260.090.A.3.b. Landscape screening is also provided along the side setback. Info Only Created in ProjectDox version