Loading...
HomeMy WebLinkAbout005_C2.3_ExistingConditions&DemolitionPlan_O2TankPRELIMINARY - FOR REVIEWFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDEXISTING CONDITIONS AND DEMOLITION PLAN- OXYGEN TANKBOZEMAN HEALTHBOZEMAN, MTC2.3 RPE17095.16_EXISTING_PROD.DWGDME06/22/2026SITE PLAN SUBMITTAL--------------17095.160 20 SCALE: 1" = 20' 401020 ENABLING SITE WORKP:\17095_16_Bozeman_Health_ED_&_BT_Expansion\CADD_C3D\PRODUCTION_DWG\17095.16_EXISTING_PROD.dwg, C2.3, 6/22/2026 9:40:10 AM, mbasile, 1:1